房地产项目设计阶段成本控制研究
[Abstract]:The design stage is an important stage of the formation of the real estate project cost, which plays an important role in the composition of the final cost of the whole real estate project. To strengthen and perfect the cost control in the design stage, to optimize the cost of the real estate project, It is of great significance to improve the market competitiveness of real estate development enterprises. This article revolves around the real estate project design stage cost control related question unfolds, first of all, finds out the restriction present design stage cost control the main question, summarizes in three aspects: first, the designer to influence the cost the main factor not to know clearly; Second, designers are not willing to reduce costs; third, there is a lack of communication mechanism between design and cost budgeting personnel. Then, under the guidance of quota design theory and value engineering theory, it is proposed that the cost control in the project design stage should be strengthened from two aspects: technology and management. In the technical aspect, the main measures put forward in this paper are: according to the working procedure of the design stage, from the project design link, the preliminary design link, the construction drawing design link, Find out the main factors that affect the cost control in each link, namely, the key points of cost control, and make clear the main factors that affect the cost in the design stage, including the sufficient volume ratio, the sufficient building density, the reasonable determination of the height of the floor, and the balance of the earthwork of the site. Optimizing the amount of steel bar and concrete, and analyzing, combing and summing up, which is used to guide the optimization of cost control in the design stage, so as to solve the problem that the designers do not know clearly the main factors that affect the cost; In the aspect of management, this paper puts forward the following three aspects, including perfecting the bidding system of selecting the design unit, establishing the mechanism of reward and punishment of the design fee, and establishing the joint examination system of the design drawing. Thus enhancing the designers' willingness to reduce costs and establishing communication mechanism between design and cost budgeting personnel. Finally, the feasibility of the viewpoints and measures discussed in this paper is verified by an example of LX project. Through the study of the cost control in the design stage of real estate project, this paper establishes the system and measures of cost control in the design stage, and then forms a relatively complete management system, thus ensuring the realization of the cost control goal in the design phase.
【学位授予单位】:北京建筑大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:F299.233.42
【相似文献】
相关期刊论文 前10条
1 周淑玲;项目设计阶段如何加强造价管理[J];郑州航空工业管理学院学报;1999年03期
2 周淑玲;;项目设计阶段如何加强造价管理[J];郑州航空工业管理学院学报;1999年03期
3 沈建忠;;房地产项目设计阶段的成本控制[J];技术与市场;2009年07期
4 周力明;杨燕;;工程项目设计阶段造价管理[J];科技信息;2009年22期
5 李悦军;;房地产项目设计阶段存在的问题与管理措施[J];中国高新技术企业;2013年24期
6 桑云香;阚秋蕊;;浅谈房地产项目设计阶段的成本控制[J];建设科技;2006年14期
7 张久国;;工程项目设计阶段的质量控制[J];科技创新导报;2008年24期
8 马建伟;;航天建设项目设计阶段推行监理的必要性研究[J];项目管理技术;2013年10期
9 邢宁;;浅谈建设项目设计阶段的价值管理[J];中国勘察设计;2006年07期
10 邓西录;解成威;;工程项目设计阶段质量控制探讨[J];中小企业管理与科技(下旬刊);2009年10期
相关会议论文 前10条
1 李海燕;宋文静;李楠;;浅谈建设项目设计阶段的造价管理与控制[A];土木建筑学术文库(第9卷)[C];2008年
2 徐峗;凌春;崔松芳;李红;崔松涛;;水利工程项目设计阶段的造价控制[A];濮阳市首届学术年会论文选编[C];2006年
3 朱仁波;徐巍;;建设项目设计阶段的工程造价控制[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
4 张小燕;熊德彬;;项目成本控制的关键[A];土木建筑学术文库(第8卷)[C];2007年
5 曹程;梁广辉;;浅析企业施工阶段的成本控制[A];土木建筑学术文库(第13卷)[C];2010年
6 范承;魏宁;;施工企业项目成本控制制度浅析[A];河南省土木建筑学会2010年学术大会论文集[C];2010年
7 卢俊红;冶伟峰;;浅析施工企业施工阶段的成本控制[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
8 魏志文;;施工各阶段成本控制要点分析[A];河南省土木建筑学会2009年学术大会论文集[C];2009年
9 宋广州;张占峰;;项目成本控制的探讨[A];土木建筑学术文库(第16卷)[C];2012年
10 张丽;刘军;;如何在施工项目管理中进行成本控制[A];土木建筑学术文库(第13卷)[C];2010年
相关重要报纸文章 前10条
1 通讯员 向远;中远香港集团狠抓成本控制工作[N];中国远洋报;2012年
2 通讯员 刘萌;打响成本控制保卫战[N];中国远洋报;2012年
3 张奎;安徽矿机铸造分公司 成本控制“算得精”[N];中国建材报;2014年
4 晓勇 海龙 星办;成本控制大有可为[N];中国远洋报;2000年
5 牛平;战略、方法与步骤——成本控制的整体规划[N];经理日报;2006年
6 浙江泰舜建设有限公司 王建祥邋杨焕尧;刍议项目成本控制管理[N];建筑时报;2007年
7 朱以师;成本控制要“先下手为强”[N];中国房地产报;2009年
8 通讯员 刘萌;大远着力打造成本控制文化[N];中国远洋报;2010年
9 烟台市财政局 王宏志;成本控制面临挑战,我国企业如何应对[N];中国会计报;2010年
10 山西大学 李志强;在市场经济条件下,更应重视企业的成本控制[N];山西日报;2011年
相关博士学位论文 前2条
1 韩l毲,
本文编号:2139372
本文链接:https://www.wllwen.com/jingjilunwen/jingjiguanlilunwen/2139372.html