巴达铁路铺架方案研究
发布时间:2018-03-11 11:21
本文选题:巴达铁路 切入点:铺架施工方案 出处:《西南交通大学》2012年硕士论文 论文类型:学位论文
【摘要】:目前,我国正处于铁路建设的高峰期,铁路建设项目多,投资费用高,如何组织和管理好铁路项目施工过程,对确保施工安全、节约成本、控制质量、满足进度等方面具有着积极意义。铁路项目由于其自身的特殊性,铺架施工方案的选择对于项目管理的进度及成本目标实现有着较大影响,一个铁路项目施工需认真分析研究铺架施工方案,以有效控制施工整体进度及成本。本文主要通过项目管理进度目标控制和成本目标控制的相应理论,研究分析巴达铁路铺架施工方案对进度目标及成本目标的影响,比较选出较优的铺架施工方案,用于指导施工,为巴达铁路项目施工进度控制和成本控制提供支持。 本文以巴达铁路工程为背景,主要研究了三个方面的内容:首先是对铁路项目施工管理中有关进度控制及成本管理的相关理论知识进行了研究。其次,根据巴达铁路项目相关资料、现场调查资料以及项目的特点、原方案的优缺点,对巴达铁路工程项目施工的特点进行了分析,包括原中国中铁第二勘测设计研究院提供的铺架施工方案优缺点分析、该铺架施工方案的进度及成本分析。并针对原方案所存在的问题提出了新的铺架施工方案,对其进行对比分析,明确几个方案各自对整个项目进度、成本等目标产生的差异。最后,根据对比分析资料,综合分析明确巴达铁路站前Ⅰ标段宜采取的施工方案,并运用于项目管理。
[Abstract]:At present, our country is in the peak period of railway construction, the railway construction project is many, the investment cost is high, how to organize and manage the railway project construction process well, to ensure the construction safety, to save the cost, to control the quality, Because of the particularity of railway project, the choice of construction plan has great influence on the progress of project management and the realization of cost target. In order to effectively control the overall progress and cost of construction, a railway project construction project should be carefully analyzed and studied in order to control the overall construction schedule and cost. This paper mainly adopts the corresponding theory of project management progress goal control and cost target control. This paper studies and analyzes the influence of the construction scheme of Bada railway frame laying on the progress goal and the cost target, and compares and selects the better construction plan for guiding the construction, providing support for the construction schedule control and cost control of Bada railway project. Taking Bada railway project as the background, this paper mainly studies three aspects: firstly, it studies the relevant theoretical knowledge of schedule control and cost management in railway project construction management. According to the relevant data of Bada railway project, the field investigation data and the characteristics of the project, the advantages and disadvantages of the original scheme, the characteristics of Bada railway project construction are analyzed. Including the analysis of advantages and disadvantages of the frame laying construction scheme provided by the former China Railway second Survey and Design Research Institute, the analysis of the schedule and cost of the construction plan. Through the comparative analysis, the differences between several schemes on the whole project schedule and cost are clarified. Finally, according to the comparative analysis data, the construction scheme that should be adopted in the first section of the Bada Railway Station is analyzed synthetically. And applied to project management.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F532
【参考文献】
相关期刊论文 前10条
1 陈东方;陈建国;;建设工程进度预警及其模型构建的研究与应用[J];工程管理学报;2010年03期
2 赵振宇;吕乾雷;;项目进度控制的双边缓冲区方法研究[J];工程管理学报;2010年05期
3 杨义兵,曹小琳;工程项目进度控制目标的经济性分析[J];重庆建筑大学学报;2003年02期
4 张陇军;赵晓华;;工程项目进度控制与管理研究[J];经济研究导刊;2009年30期
5 汪丽媛;陈燕;陈飞;;基于全寿命周期的公路成本分析探讨[J];交通标准化;2010年11期
6 张海伟;;公路工程造价控制与管理[J];交通世界(建养.机械);2010年01期
7 李箫;;高速公路项目全寿命周期成本集成化管理[J];交通世界(运输.车辆);2009年06期
8 高利军;;浅析公路工程造价控制[J];山西建筑;2009年16期
9 万爽;;公路工程造价控制与管理探讨[J];科学之友(B版);2008年01期
10 杨宏伟;;高原高寒地区铺架施工设备适应性改造关键技术研究[J];铁道标准设计;2006年S1期
,本文编号:1597942
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/1597942.html