基地航空公司转场项目管理研究
发布时间:2018-04-29 17:01
本文选题:基地航空公司 + 机场转场 ; 参考:《云南大学》2013年硕士论文
【摘要】:机场是现代化城市的重要组成部分,许多大城市,尤其是国际城市大多都拥有一个以上的大型枢纽机场,而我国由于是发展中国家,民航事业起步晚、起点低,民航基础设施还普遍比较落后,随着国家经济实力的逐年提升,民航事业的高速发展,城市机场建设的高潮迭起,更多的大城市、省会城市迁建或者扩建机场,因而系统周密的研究机场转场搬迁就变成一项实际而紧迫的工作。本文以东航云南有限公司转场昆明长水国际机场为实际案例,结合民航理论知识和管理理论,以严谨系统的研究方法,较为完善的研究了基地航空公司转场搬迁这一大型项目。论文首先简述了选题背景和意义,介绍了昆明长水新机场转场项目,提出了论文的研究方法和框架思路;对基地航空公司转场项目筹备工作做了系统的介绍,并且详细描述了基地航空公司转场项目所经历的各个阶段所要完成的工作内容;论文用项目管理的理论知识以及管理学知识,以大量实例方式研究了基地航空公司转场项目目标设定到项目控制最后到实现目标的整个过程,并提出了基地航空公司顺利实现转场最为重要的三项工作。本文在民航业高速发展,机场迁、扩建日趋频繁的背景下,结合昆明长水国际机场转场项目进行研究提出建议,对今后基地航空公司转场搬迁具有一定的指导意义。
[Abstract]:Airports are an important part of modern cities. Many large cities, especially international cities, have more than one large hub airport. However, because China is a developing country, the civil aviation industry starts late and the starting point is low. Civil aviation infrastructure is still generally relatively backward. With the national economic strength rising year by year, the rapid development of civil aviation, the high tide of urban airport construction, more large cities and provincial capitals have relocated or expanded airports. Therefore, a systematic and thorough study of airport relocation becomes a practical and urgent task. In this paper, taking Kunming Changshui International Airport of China Eastern Airlines Yunnan Co., Ltd as a practical case, combining civil aviation theory knowledge and management theory, with rigorous and systematic research methods, this paper studies the large-scale project of base airline transfer relocation. Firstly, the paper briefly introduces the background and significance of the topic, introduces the project of Changshui New Airport in Kunming, puts forward the research methods and frame ideas of the thesis, and systematically introduces the preparatory work of the turnaround project of the base airline company. It also describes in detail the contents of the work to be completed in each stage of the turnaround project of the base airline company, the theoretical knowledge of project management and the management knowledge of the project. This paper studies the whole process from the goal setting to the final control of the project control to the realization of the goal with a large number of examples, and puts forward the three most important tasks for the successful realization of the turnaround of the base airline. Under the background of the rapid development of civil aviation industry, airport relocation and expansion, this paper puts forward some suggestions based on the study of Kunming Changshui International Airport transfer project, which has certain guiding significance for the future relocation of base airlines.
【学位授予单位】:云南大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:V351;F562.6
【参考文献】
相关期刊论文 前6条
1 杨晗熠;;枢纽确定单连接轴—辐网络结构在中国民用航空网络中的应用[J];北京理工大学学报(社会科学版);2010年02期
2 唐林鹤;;启德机场——赤(鱼昔)角机场 世纪大搬迁[J];广东大经贸;1998年07期
3 Cindy;;白云机场的超级IT引擎[J];信息方略;2009年14期
4 王铭博;;上航从首都机场T3顺利转场到T2运营[J];空运商务;2010年07期
5 黄晔;;中国航空枢纽建设前景研究[J];中国新技术新产品;2009年18期
6 王自然;;昆明新机场——“空中桥头堡”连通世界[J];云南党的生活;2012年02期
,本文编号:1820803
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/1820803.html