C市涪丰石高速公路BOT项目风险管理研究
[Abstract]:As an important activity of attracting private capital to invest in public infrastructure construction, BOT project has high economic and social value in its realization and development. For the private enterprises and other enterprises that get the target of the BOT project, they can get better investment opportunities, while the commercial banks can also realize the growth of loan business and related profits, and other enterprises and individuals involved in the construction can obtain certain economic benefits. The government can obtain good social benefits after the project. Therefore, the development of bot project is of great significance to the economic and social progress of our country, so we should pay attention to the large demand for funds of the bot project itself, and the leading enterprise organizations must design and implement the rational financing decision. After obtaining the effective financing capital, can meet the project investment request, promotes the project construction step by step. Therefore, the financing activities of bot project have an important impact on the realization of the benefit of each side of the project. However, in the activities of BOT financing projects, the existence of extremely complex risks has an impact on its financing progress and stability, which must be paid attention to and solved in BOT financing projects and project construction. Therefore, this paper focuses on the risk management of BOT financing projects, combines qualitative analysis and quantitative analysis methods, combs out the possible risks and effects of BOT financing projects on the basis of literature analysis and project analysis. In order to reduce the probability of risk and the possible loss caused by BOT financing project, the author designs the plan to deal with the risk, so as to ensure the optimal comprehensive benefit of the BOT project. In this paper, the background, purpose, significance, content and method of the research are firstly combed to form the basic logic of the research. Secondly, the related theories of risk and management of BOT financing project are combed out, and the theoretical basis of the full text analysis is established. Thirdly, this paper introduces the project selected by BOT financing project risk management, including the general situation of the project, financing needs and financing process, and preliminarily clear the importance of financing risk management to the project; fourth, On the basis of financing process and structure of Fulongshi BOT project in C city, combined with the theory of risk identification and risk evaluation, this paper identifies, analyzes and evaluates the risk of this BOT financing project, and preliminarily achieves the effect of straightening out the primary and secondary risks. Based on the analysis of the probability and loss of each specific risk, the author designs the concrete strategy to deal with each specific risk, in order to achieve the systematic and concrete risk management goal. Sixthly, combing the value of BOT project development, making clear that our country BOT project development must pay attention to financing and financing risk, and carrying out good risk management of BOT financing project needs comprehensive and systematic risk analysis and concrete and effective project formulation, etc.
【学位授予单位】:电子科技大学
【学位级别】:硕士
【学位授予年份】:2012
【分类号】:F542;F283
【相似文献】
相关期刊论文 前10条
1 李国英;城镇供水与BOT[J];中国水利;2001年01期
2 卢尚艇;推动民间资本以BOT方式投资公路建设[J];交通财会;2003年09期
3 沈宏晖;BOT在水电工程中的应用浅析[J];湖南水利水电;1997年06期
4 魏其运,史引杰;浅谈公路BOT项目的财务分析[J];山东交通科技;1998年03期
5 许健;浅析甘肃水利行业引进BOT机制[J];甘肃水利水电技术;2001年01期
6 王俊,陈学武;我国公共交通行业实行BOT融资方式探讨[J];城市公共交通;2003年06期
7 陈显荣,王珂;BOT项目实施的障碍[J];国外公路;1999年06期
8 庄清文;BOT投资方式在高等级公路项目中的应用[J];国外公路;2000年06期
9 许晓峰,吴玲;铁路采用BOT投资方式若干问题研究[J];铁道经济研究;1998年03期
10 陈裔皓;灵活运用承包方式,适应国际工程市场特点[J];福建建筑;2001年02期
相关会议论文 前10条
1 裘水富;;杭衢高速公路绍兴连接线工程BOT模式思考[A];全国城市公路学会第十九次学术年会论文集[C];2010年
2 马彪;石磊;;不确定社会效益下BOT项目的政府补贴和保证金[A];第五届(2010)中国管理学年会——管理科学与工程分会场论文集[C];2010年
3 李美霞;;西部基础设施建设与BOT投资方式利用[A];当代法学论坛(二○○九年第2辑)[C];2009年
4 温晓芸;;论内资“BOT”方式在西部大开发中环境基础设施建设领域的应用及其作用[A];道路·创新·发展——陕西省社会科学界第三届(2009)学术年会金融危机与陕西经济发展专题学术论坛论文选集[C];2009年
5 毛骁骁;;论BOT特许协议争端的仲裁解决[A];中国仲裁与司法论坛暨2010年年会论文集[C];2010年
6 刘光;;论运用BOT融资方式促进我国西部地区发展的法律制度完善[A];当代法学论坛(二○一○年第1辑)[C];2010年
7 梁金辉;;我国公共体育场馆融资模式选择——基于PFI与BOT融资模式的比较[A];中华人民共和国第十一届运动会科学大会论文摘要汇编[C];2009年
8 刘康怀;龙飞;梁怡;高明河;;某小城镇污水处理厂的BOT运行模式及效果[A];2011中国环境科学学会学术年会论文集(第一卷)[C];2011年
9 李云松;李正山;何媛媛;范莉;;创新是环保产业的生命[A];四川省环境科学学会2003年学术年会论文集[C];2003年
10 钱水苗;徐迪;;环境污染治理项目的BOT模式及其法律规制[A];适应市场机制的环境法制建设问题研究——2002年中国环境资源法学研讨会论文集(上册)[C];2002年
相关重要报纸文章 前10条
1 周瑾亮;青洋路高架BOT项目签约[N];常州日报;2009年
2 本报记者 马琳;BOT模式受资本青睐[N];中国房地产报;2009年
3 记者 赵一蕙;隧道股份拟投55亿建设 昆明南连接线高速BOT项目[N];上海证券报;2011年
4 记者 周松林;采用BOT形式建隧道[N];中国证券报;2002年
5 徐松竹 吕红波 唐文波;浏阳首家BOT垃圾处理场建成[N];中国经济导报;2008年
6 记者 廖玲艺 通讯员 姚志荣;市区一BOT建设项目成功融资上千万元[N];闽南日报;2009年
7 记者 曹湘黔;乐自高速BOT招标成功[N];自贡日报;2009年
8 本报记者 黄颖;第二绕城高速招标 BOT方式 明年开建[N];成都日报;2009年
9 肖明葵 本报记者 任晶惠;BOT项目投资,风险不容忽视[N];中国交通报;2010年
10 王霁虹 何帅领;公路BOT项目中的法律风险与防范[N];中华建筑报;2011年
相关博士学位论文 前10条
1 彭程;城市快速公交系统BOT-BT-TOT集成融资创新模式研究[D];昆明理工大学;2012年
2 吴孝灵;基于博弈模型的BOT项目利益相关者利益协调机制研究[D];南京大学;2011年
3 吴海西;基于基础设施项目特征的BOT模式匹配研究[D];大连理工大学;2011年
4 左廷亮;BOT项目公司的股东结构选择及股东行为特征研究[D];西南交通大学;2011年
5 孙荣霞;基础设施BOT-TOT-PPP集成融资模式的研究[D];昆明理工大学;2010年
6 覃正标;基于实物期权理论的内资BOT高速公路投资决策分析[D];西南交通大学;2011年
7 余群舟;基于风险分担的垃圾焚烧BOT项目特许期政府决策[D];华中科技大学;2012年
8 王东波;不确定条件下BOT项目特许期决策模型研究[D];大连理工大学;2010年
9 王喜军;大型建筑企业运作BOT项目能力分析与实证研究[D];中南大学;2009年
10 刘宁;BOT项目实物期权决策模型研究[D];大连理工大学;2012年
相关硕士学位论文 前10条
1 孙敏义;污水处理项目的BOT模式风险规避研究[D];天津商业大学;2010年
2 王川;QZ高速公路BOT项目风险管理研究[D];电子科技大学;2010年
3 李杰;BOT模式的政府信息化项目风险防控研究[D];北京邮电大学;2010年
4 丁进;马鞍山市王家山污水处理BOT项目的风险分析[D];南京理工大学;2010年
5 张召伟;项目公司视角的BOT项目风险评价体系研究[D];云南财经大学;2010年
6 马彪;国有企业实施BOT的软预算问题及契约效率分析[D];大连理工大学;2010年
7 吴德雨;廊坊垃圾焚烧发电厂BOT项目可行性研究[D];华北电力大学(北京);2011年
8 赵国平;中建六局BOT融资模式研究[D];兰州大学;2010年
9 潘新元;BOT建设项目的财务评价[D];南京理工大学;2010年
10 曾娴;基于敏感性分析的BOT项目风险评价研究[D];北方工业大学;2010年
本文编号:2217576
本文链接:https://www.wllwen.com/jingjilunwen/jtysjj/2217576.html