基于5D-BIM的高桩码头工程施工进度-成本实时控制
发布时间:2018-01-05 22:11
本文关键词:基于5D-BIM的高桩码头工程施工进度-成本实时控制 出处:《水运工程》2017年03期 论文类型:期刊论文
【摘要】:针对目前基于二维施工图的高桩码头施工现场控制存在工程量计算耗时长、数据处理实时性差等问题,进行了基于5D-BIM(5 Dimensions-Building Information Modeling)的高桩码头工程施工过程控制研究,通过5D-BIM系统高效搜集整理大量数据的能力、强大的交互功能,实现了快速、准确的工程成本测算以及直观的实时进度四维动态显示,为动态、实时、高效地控制高桩码头施工进度-成本提供了有效的手段。
[Abstract]:At present, there are some problems in the field control of high pile wharf based on 2D construction drawing, such as long calculation time and poor real-time data processing. 5 Dimensions-Building Information modeling based on 5D-BIMM). Study on construction process control of high pile wharf engineering based on the. Through the 5D-BIM system, the ability to collect and organize a large number of data efficiently, powerful interactive functions, the realization of rapid, accurate engineering cost calculation and intuitive real-time four-dimensional dynamic display progress, for the dynamic, real-time. Efficient control of construction schedule-cost of high-pile wharf provides an effective means.
【作者单位】: 中交水运规划设计院有限公司;
【分类号】:U655.2
【正文快照】: 高桩码头工程施工过程中受各约束条件与内外环境变化的影响,实际施工进度、成本与原计划不可避免地产生偏差,如不及时纠正,将给工程带来巨大风险,甚至工期或成本超出合同规定。因此,有必要研究高桩码头施工中快速的成本测算以及高效的后期进度实时预测与控制等问题,使施工管理
【参考文献】
相关期刊论文 前6条
1 唐海燕;刘荣桂;韩豫;王进;;基于BIM-5D的工程施工成本预测系统构建[J];工程管理学报;2015年04期
2 林佳瑞;张建平;钟耀锋;;基于4D-BIM的施工进度-资源均衡模型自动构建与应用[J];土木建筑工程信息技术;2014年06期
3 胡长明;熊焕军;龙辉元;王雪艳;;基于BIM的建筑施工项目进度-成本联合控制研究[J];西安建筑科技大学学报(自然科学版);2014年04期
4 李锦华;秦国兰;;基于BIM-5D的工程项目造价控制信息系统研究[J];项目管理技术;2014年05期
5 何清华;韩翔宇;;基于BIM的进度管理系统框架构建和流程设计[J];项目管理技术;2011年09期
6 张建平;范U,
本文编号:1385051
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1385051.html