三拱肋下承式钢拱桥顶推施工关键技术研究

发布时间:2018-01-14 11:24

  本文关键词:三拱肋下承式钢拱桥顶推施工关键技术研究 出处:《西南交通大学》2015年硕士论文 论文类型:学位论文


  更多相关文章: 顶推施工 钢拱桥 导梁 局部分析


【摘要】:顶推施工于半个世纪前首次出现,发展至今应用广泛。顶推施工具有不影响桥下既有线路运营、安全可靠、施工周期较短等诸多优点。虽然顶推技术已经较为成熟,但顶推施工多数用于混凝土梁桥的建设。随着钢拱桥应用的增多,钢拱桥的顶推施工有望在特定条件下被广泛应用。论文以贵州省盘县红果经济开发区上跨盘西支线、水红铁路立交桥为工程背景,进行了钢拱桥顶推施工关键技术的研究和讨论,完成的主要工作如下:1.介绍了钢拱桥以及顶推施工的发展,对钢拱桥顶推施工法的研究现状进行了分析。总结了顶推施工的原理、分类、施工技术和施工特点,以及顶推施工过程中常见的问题。2.顶推施工过程结构受力非常复杂,论文采用MIDAS CIVIL软件对红果桥整体顶推施工过程进行全桥整体分析计算。分析了结构的位移、受力以及支座反力的情况及变化规律,找出了结构的最不利受力工况。3.对导梁的设计进行了研究,导梁的设计中应考虑长度、刚度、质量等参数的合理取值,通过改变导梁设计参数,对比结构在顶推施工过程中的受力情况,进行优化分析。对顶推施工过程中拱肋临时支撑的设置、结构型式进行了研究及分析。4.最后论文通过采用MIDAS FEA软件进行板壳单元局部有限元建模,较精细地计算分析最不利工况下钢箱梁的受力情况,得到了支撑点附近板件的应力分布。并针对钢箱梁各构件参数的变化(顶板、底板、底板加劲肋及横隔板等),分析钢箱梁板件板厚的变化对局部稳受力性能的影响,并提出改善局部受力的意见,以期对今后的类似工程提供参考借鉴。
[Abstract]:Thrust construction appeared for the first time half a century ago and has been widely used up to now. The jacking construction has no influence on the operation of existing lines under the bridge and is safe and reliable. The construction period is short and so on. Although the pushing technology has been more mature, most of the jacking construction is used in the construction of concrete beam bridge. With the increase of steel arch bridge application. The jacking construction of steel arch bridge is expected to be widely used under certain conditions. The paper takes the cross-pan west branch of Hongguo Economic Development Zone of Pan County Guizhou Province and the Shuihong Railway overpass as the engineering background. The key technology of steel arch bridge jacking construction is studied and discussed. The main work accomplished is as follows: 1. The development of steel arch bridge and its jacking construction is introduced. This paper analyzes the present research situation of steel arch bridge jacking construction method, and summarizes the principle, classification, construction technology and construction characteristics of the jacking construction method. As well as the common problems in the process of pushing construction. 2. The force of the structure in the process of pushing construction is very complex. The whole construction process of Hongguo Bridge is analyzed and calculated by MIDAS CIVIL software. The displacement of the structure, the force and the reaction force of the support are analyzed. The design of the guide beam should consider the reasonable value of the parameters such as length, stiffness and mass, and the design parameters of the guide beam should be changed by changing the design parameters of the guide beam. Compare the stress situation of the structure in the process of pushing construction, carry on the optimization analysis, and set up the temporary support of the arch rib in the process of the jacking construction. The structure type is studied and analyzed. Finally, the local finite element model of shell element is established by using MIDAS FEA software. The stress distribution of the steel box girder near the supporting point is obtained by calculating and analyzing the stress situation of the steel box girder under the most unfavorable working conditions, and aiming at the change of the parameters of the steel box girder component (roof, bottom plate). In this paper, the influence of plate thickness of steel box girder on local stability is analyzed, and suggestions for improving local force are put forward in order to provide reference for similar projects in the future.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.462

【相似文献】

相关期刊论文 前10条

1 舒晓文,祁军强;伊莱·福尔肯大桥的顶推设计与施工[J];国外公路;2001年02期

2 徐化轩;顶推梁桥施工中可能出现的技术问题及对策[J];铁道工程学报;2002年02期

3 徐华轩;;顶推梁桥施工中可能出现的技术问题及对策[J];OVM通讯;2002年06期

4 赵如东;连续梁顶推技术的新发展[J];水运工程;2004年03期

5 刘大洋;;顶推法施工工艺的探讨[J];四川建材;2007年03期

6 陈继光;;顶推法施工关键工艺改进[J];筑路机械与施工机械化;2008年03期

7 何杰;于雪梅;;多点顶推在钢筋混凝土连续箱梁中的具体应用[J];中国建设信息;2008年08期

8 曹航;;采用顶推法施工的西德维纳大桥[J];黑龙江交通科技;2011年09期

9 闵祥涛;刘涛;;桥梁顶推法施工工艺控制分析[J];现代商贸工业;2011年23期

10 张连海;;顶推法施工桥梁[J];北方交通;2012年07期

相关会议论文 前3条

1 石毅生;;钱塘江第二大桥铁路引桥预应力钢筋混凝土梁新颖单点顶推法[A];中国土木工程学会桥梁及结构工程学会第九届年会论文集[C];1990年

2 金伟;彭锦;;预应力混凝土桥梁顶推法施工技术的理论与实践[A];2014年4月建筑科技与管理学术交流会论文集[C];2014年

3 马春生;李江山;郭范围;彭向荣;;广东省九江大桥设计[A];'95预应力混凝土连续梁和刚构桥学术会议论文集[C];1995年

相关重要报纸文章 前2条

1 刘三琴;一桥飞架 天堑变通途[N];南方日报;2006年

2 本报记者 沈刚 李瑾 本报特约通讯员 彭伦理 刘健 唐博学;工人设计师王海[N];工人日报;2004年

相关博士学位论文 前1条

1 牛辉;空间拱肋组合桥梁顶推施工技术研究[D];浙江大学;2012年

相关硕士学位论文 前10条

1 刘承启;三拱肋下承式钢拱桥顶推施工关键技术研究[D];西南交通大学;2015年

2 李洪明;跨铁路钢箱梁桥顶推法施工关键技术研究[D];西南交通大学;2013年

3 杨辉;钢箱梁步履式平移顶推受力特性与施工技术[D];南昌大学;2010年

4 杨磊;混凝土斜连续梁顶推施工期风险评估与预防措施[D];长沙理工大学;2012年

5 徐甜;大跨度钢箱梁顶推受力特性及监测控制研究[D];长沙理工大学;2011年

6 龙煈;长沙市福元路湘江大桥提篮式拱桥拼装与顶推的控制技术[D];长沙理工大学;2012年

7 王鹤;下坞蓟运河特大桥7跨连续梁顶推施工技术研究[D];中南大学;2012年

8 付书林;超重车超长连续梁桥组拼顶推新技术研究[D];华东交通大学;2011年

9 魏民;广州新光猎德大桥钢箱梁顶推关键技术研究[D];西南交通大学;2008年

10 谭钧;昆明跨线桥步履顶推施工关键技术研究[D];广西科技大学;2014年



本文编号:1423391

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1423391.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户c875d***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com