多跨连续梁桥挂篮施工线形优化研究
本文关键词: 挂篮施工 施工监控 线形优化 出处:《合肥工业大学》2015年硕士论文 论文类型:学位论文
【摘要】:随着我国经济的高速发展,基础建设在国民经济发展中的重要性不言而喻,尤其是桥梁建设更是城市道路交通枢纽中的关键环节。桥梁以其跨越障碍物的能力成为交通建设中必不可少的一环。这其中预应力混凝土桥梁作为一种古老的桥梁结构型式,越来越发挥着它的重要性,而预应力混凝土连续梁桥的建设必然少不了悬臂浇筑施工法,它是目前为止混凝土连续梁桥最常用的施工方法,其方法结构形式较为合理,施工造价便宜,无需占用桥跨之间的场地而受到青睐。但是悬臂法施工也存在一系列不可预知的风险,同时也会产生较为复杂的应力和挠度的变化。由于混凝土材料的各项不均匀质性、几何参数的变异性以及温度等各种不确定因素的影响,也使得成桥后的内力与线形与设计值不能很好的吻合。因此合理的施工方法是保证桥梁安全健康的重要手段,而随着桥梁施工监控的介入,许多问题得以很好的解决,它是通过对桥梁施工前期、施工过程及施工后期的全过程参与,很好的把设计与施工结合起来。通过对芜湖荆山大桥进行现场数据实测及有限元模拟分析,结果表明:①连续梁主梁各阶段施工关键控制点各项指标(如:挠度、应力)实测值与理论值吻合程度较高;②通过有限元软件MIDAS建模计算分析,得到混凝土连续梁桥施工过程中各断面及成桥后状态均处于受压状态,受力满足桥梁施工规范要求,表明桥梁在悬臂施工过程中安全性较高,同时软件分析也为施工监控提供有力的保证;③芜湖荆山大桥连续梁在施工过程中必然受到多种外部因素的影响,进行相应的参数简化计算尤为重要;④连续梁桥施工过程中各断面应力及成桥后线形基本满足设计要求,施工预拱度设置比较合理。本篇硕士论文对连续梁桥的受力特点及施工控制做了较为详细的阐述,可以作为同类型桥梁施工监控的依据。
[Abstract]:With the rapid development of China's economy, it is self-evident importance of basic construction in the development of national economy, especially the bridge construction is the key link city road traffic hub in the bridge. The obstacle crossing ability has become a necessary link in the traffic construction. The prestressed concrete bridge as an ancient bridge type, plays more and more importance to it, and the construction of prestressed concrete continuous beam bridge cantilever construction method is inevitable, it is by far the most commonly used concrete continuous girder bridge construction method, the method of structure is more reasonable, the construction cost is cheap, without occupying the bridge between the site and popular. But the cantilever construction method also has a series of unpredictable risks, will also have a more complex change of stress and deflection of the concrete material is due. Uniform quality, variability and temperature of various geometric parameters of uncertain factors, also makes the bridge internal force and alignment with the design values are not well consistent. So the reasonable construction method is an important means to ensure the safety and health of the bridge, with the bridge construction monitoring and intervention, many problems can be solved well, it is through the bridge construction, the whole process in the construction process and the construction of the post, good to the design and construction combined. Through the field data test and finite element simulation analysis on Wuhu Jingshan bridge showed a continuous girder in each stage of construction indicators (the key control points such as: deflection, stress) results with higher theoretical value; through the finite element software MIDAS modeling calculation and analysis, get the construction process of concrete continuous beam bridge in each section and bridge state In compression, the stress of the bridge construction specifications, show high safety in bridge cantilever construction process, and software analysis also provides a powerful guarantee for the construction monitoring; the Wuhu Jingshan bridge continuous beam in the construction process will inevitably be affected by many external factors, simplify the corresponding parameter calculation should be particularly important; the construction process of the cross section of continuous girder bridge and the bridge alignment can basically meet the design requirements, construction camber setting is reasonable. This thesis on continuous beam bridge force characteristics and construction control are described in detail, can be used as the basis of the same type bridge construction control.
【学位授予单位】:合肥工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.4
【相似文献】
相关期刊论文 前10条
1 杨平中;广园大桥主航道桥挂篮施工控制[J];青海交通科技;2005年03期
2 陈秋平;;大跨度预应力混凝土桥梁挂篮施工测量方法探讨[J];工程地球物理学报;2006年04期
3 炊廷柱;;浅谈自制装配式桁架挂篮施工技术[J];科技信息(科学教研);2007年21期
4 尚泽华;;浅谈多风条件下的大型挂篮施工技术[J];科协论坛(下半月);2009年02期
5 高宏双;戴凤龙;;挂篮施工技术要点分析[J];黑龙江交通科技;2009年12期
6 黄镇希;;挂篮施工常见的质量安全事故防治[J];河南建材;2010年02期
7 吴晓霞;;挂篮施工上跨城际铁路防护棚架设计[J];交通科技;2011年01期
8 薄春莲;;块段支架置换挂篮施工连续梁技术[J];铁道建筑技术;2011年06期
9 刘进宝;;挂篮施工方法与技术措施探索[J];科技资讯;2011年16期
10 何凡松;邱长华;;汉孝客专连续梁挂篮施工要点及控制措施[J];科技信息;2011年19期
相关会议论文 前5条
1 张国坤;;连续箱梁挂篮施工扰度控制分析[A];全国城市公路学会第十五届(2006)学术年会论文集[C];2006年
2 门文博;;挂篮施工连续梁桥是臂端高程控制[A];第十届中国科协年会中部地区物流产业体系建设论坛专辑[C];2008年
3 盛希;任剑波;张法;;荆州长江公路大桥主桥挂篮施工[A];第一届全国公路科技创新高层论坛论文集公路设计与施工卷[C];2002年
4 王峰;;永定新河特大桥挂篮施工技术[A];中国土木工程学会市政工程分会2000年学术年会论文集[C];2000年
5 韩大建;苏成;肖广成;陈太聪;;大跨度混凝土斜拉桥牵索挂篮施工模拟计算[A];计算机在土木工程中的应用——第十届全国工程设计计算机应用学术会议论文集[C];2000年
相关重要报纸文章 前7条
1 记者 鲍丕勇;徐贾快速通道瓦庄运河大桥合龙[N];徐州日报;2011年
2 通讯员 伍振;十八局集团潼西高速严防死守保安全[N];中国铁道建筑报;2010年
3 本报记者 鲍丕勇;徐贾快速通道年内建成通车[N];徐州日报;2011年
4 记者 章盛莉;湘府路湘江大桥预计明年8月合龙[N];长沙晚报;2011年
5 肖影 徐军华;中铁二十局集团川渝公司攻破桥梁施工难题[N];中华建筑报;2006年
6 记者 舒薇;福元路大桥预计12月全线通车[N];长沙晚报;2012年
7 记者 裴其娟 孟斌 通讯员 王倩华;市区跨铁路桥成功转体[N];郑州日报;2010年
相关硕士学位论文 前6条
1 栗勇;红枫湖大桥挂篮施工方法研究[D];大连理工大学;2003年
2 高雅;斜拉桥挂篮施工模拟分析[D];南京林业大学;2010年
3 史毅杰;邢家湾特大桥挂篮施工工艺优化研究[D];河北工业大学;2014年
4 张庆明;悬浇法挂篮施工的误差控制研究[D];河北工业大学;2006年
5 毛小明;按挂篮施工设计的连续刚构桥采用支架分段施工的研究[D];武汉理工大学;2013年
6 张祥凯;多跨连续梁桥挂篮施工线形优化研究[D];合肥工业大学;2015年