将军岭作业区码头工程项目施工风险管理研究

发布时间:2018-02-15 05:30

  本文关键词: 将军岭作业区码头 项目 施工 风险 管理 出处:《广西大学》2015年硕士论文 论文类型:学位论文


【摘要】:随着国家“珠江一西江”经济带发展战略的实施,国家不断加大对港口码头等基础设施建设的投入,通过投资拉动促进区域社会经济发展。但内河码头的建设,面临的项目风险因素很多,项目的成败直接影响国家战略的实施,因此加强将军岭码头风险研究意义重大。本文采取了头脑风暴法、检查表法、风险图法,对属于内河码头的将军岭作业区码头项目施工风险管理的过程展开实例分析。首先,通过对项目的概况、项目实施条件的详细分析,了解项目的整体情况。其次,举例采用头脑风暴法、检查表法对项目主要风险因素进行识别。再次,在项目风险因素识别的基础上,举例使用风险图法进行风险评价,并根据评价结果得出将军岭作业区码头项目关键风险要素。最后,针对项目潜在关键风险要素提出严格控制原材料质量、确保关键岗位人员管理、控制合同履约风险、合理控制码头施工进度、有效解决码头施工对河道的污染、严格控制混凝土施工质量、严格控制隐蔽分项工程验收、科学控制工程施工费用、严格实施爆破工程安全管理九大应对措施。
[Abstract]:With the implementation of the development strategy of the national "Zhujiang-Xijiang" economic belt, the state has continuously increased investment in infrastructure construction such as port and wharf, promoting regional social and economic development through investment. However, the construction of inland river wharves, There are many risk factors facing the project, and the success or failure of the project directly affects the implementation of the national strategy, so it is of great significance to strengthen the risk research of the Guanling Wharf. This paper adopts the brainstorming method, the checking table method, the risk chart method, and the risk chart method. First, through the general situation of the project, the detailed analysis of the project implementation conditions, to understand the overall situation of the project. For example, brainstorming method and checklist method are used to identify the main risk factors of the project. Thirdly, based on the identification of the project risk factors, the risk assessment is carried out with the example of the risk chart method. According to the evaluation results, the key risk factors of the project are obtained. Finally, according to the potential key risk factors of the project, strictly control the quality of raw materials, ensure the management of key positions, control the risk of contract performance. Reasonably control the progress of wharf construction, effectively solve the pollution caused by wharf construction, strictly control the quality of concrete construction, strictly control the acceptance of hidden sub-projects, and scientifically control the construction costs, To strictly implement the nine major measures for the safety management of blasting projects.
【学位授予单位】:广西大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U655.1


本文编号:1512539

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1512539.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户a570e***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com