【摘要】:现代斜拉桥发展至今已有整整六十个年头。科学技术的进步带动着斜拉桥的发展,衍生出各式各样各具特色的斜拉桥.。其中,独塔混合梁斜拉桥以其优良的力学性能、合理的造价及多变的造型而被广泛采用。该论文以某在建的斜拉桥为工程背景,对支架法施工的独塔混合梁斜拉桥的施工过程进行分析。主要通过以下几个方面展开:1.简单介绍了斜拉桥的整体发展现状、构造特征及施工技术。2.通过大型桥梁软件Midas/Civil2012建立仿真模型进行有限元分析,分析了该桥施工全过程中的结构行为。具体包括施工过程的分析和成桥后运营阶段的分析两个方面。3.在施工阶段分析中,选取主梁、斜拉索及桥塔作为主要研究对象,分析了在施工过程中各阶段主梁和斜拉索应力、位移等关键控制数据变化规律,用以指导施工。由于该桥主梁采用支架施工,主要对斜拉索张拉过程中主梁脱架的安全性进行分析。同时,确保斜拉索在张拉过程中应力不超限。4.针对该桥的异形桥塔的施工,建立包含劲性骨架的桥塔施工过程有限元模型,分析其施工过程中受力情况及施工安全性。5.为考虑后续运营阶段荷载对结构的影响,对成桥后单项荷载及组合荷载作用下的主梁及斜拉索的静力效应进行分析,研究结构的安全性。
[Abstract]:It has been 60 years since the development of modern cable-stayed bridges. The progress of science and technology has led to the development of cable-stayed bridges, resulting in a variety of cable-stayed bridges with different characteristics. Among them, single-tower hybrid cable-stayed bridges have excellent mechanical properties. Reasonable cost and variable shape are widely used. This paper takes a certain cable-stayed bridge under construction as the engineering background. This paper analyzes the construction process of single tower hybrid girder cable-stayed bridge constructed by support method. It mainly introduces the overall development of cable-stayed bridge through the following several aspects: 1. The structural characteristics and construction technology .2.The finite element analysis is carried out by establishing the simulation model through the large-scale bridge software Midas/Civil2012. This paper analyzes the structural behavior of the bridge during the whole process of construction, including the analysis of the construction process and the analysis of the operation stage after the completion of the bridge. 3. In the analysis of the construction stage, the main beam, cable and tower are selected as the main research objects. The variation law of key control data, such as stress and displacement of main girder and stay cable in each stage of construction, is analyzed to guide the construction. Because the main girder of the bridge is constructed with support, This paper mainly analyzes the security of the main beam in the process of cable tension. At the same time, it ensures that the stress of the cable in the process of tension is not out of the limit. 4. In view of the construction of the special shaped bridge tower of the bridge, The finite element model of bridge tower construction process including rigid skeleton is established, and the stress situation and construction safety during the construction process are analyzed. 5. In order to consider the influence of the load on the structure in the subsequent operation stage, the finite element model of the bridge tower construction process is established. The static effect of main beam and cable under single load and combined load is analyzed and the safety of the structure is studied.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.4;U448.27

【参考文献】

相关期刊论文 前10条

1 段宝萍;;混凝土斜拉桥二次调索顺序优化设计[J];广东交通职业技术学院学报;2011年02期

2 祖祥胜;刘征宇;柏国清;;钢绞线拉索与钢丝拉索体系的比较[J];安徽建筑;2010年03期

3 张国杰;杜丽鹏;徐光海;;浅谈我国公路桥梁的发展趋势[J];今日科苑;2010年06期

4 黄晓航;高宗余;;无应力状态控制法综述[J];桥梁建设;2010年01期

5 邢中凯;谢高潮;;混凝土箱形截面梁桥温度梯度分析[J];中国西部科技;2008年28期

6 洪娜;;我国大跨径公路桥梁建设的概况简析[J];科技信息(科学教研);2008年23期

7 秦顺全;;无应力状态控制法斜拉桥安装计算的应用[J];桥梁建设;2008年02期

8 苏丹;卢文良;;结合梁结构在桥梁中的应用[J];城市轨道交通研究;2007年07期

9 杨征宇;宋桂峰;楼庄鸿;;我国独塔斜拉桥[J];预应力技术;2007年03期

10 陈明宪;;斜拉桥的发展与展望[J];中外公路;2006年04期

相关博士学位论文 前2条

1 杨俊;基于影响矩阵的大跨桥梁合理成桥状态与施工控制研究[D];武汉理工大学;2008年

2 颜东煌;斜拉桥合理设计状态确定与施工控制[D];湖南大学;2001年

相关硕士学位论文 前5条

1 彭华军;多塔斜拉桥施工过程仿真分析[D];西南交通大学;2011年

2 陈再荣;铁锣坪大桥成桥索力和施工控制研究[D];武汉理工大学;2009年

3 马超;斜拉桥的合理成桥索力和施工阶段索力控制[D];武汉理工大学;2008年

4 陈海桦;独塔斜拉桥合理成桥索力及设计参数研究[D];西南交通大学;2007年

5 张夫健;独斜塔混合梁斜拉桥合理成桥状态分析与施工控制模拟[D];天津大学;2007年



本文编号:1649985

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1649985.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d0703***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com