当前位置:主页 > 科技论文 > 路桥论文 >

震后应急期道路抢修与物资运输联合调度

发布时间:2018-04-20 07:25

  本文选题:灾后响应 + 应急物流 ; 参考:《上海交通大学》2015年硕士论文


【摘要】:受损道路抢修和救援物资运输是震后应急工作的重心之一,其中救援物资的及时送达更是保障灾区人民生命安全的关键。但在实际工作中,道路抢修计划和物资运输计划通常由不同决策部门分开制定,没能充分考虑到这两者间的相互作用,容易造成将有限抢修资源分配到非关键灾点而导致紧急救援物资运输的延迟。因此本文针对资源短缺情况下的震后应急期道路抢修与救援物资运输问题,通过简化灾点于路网中的复杂拓扑关系,借助时空网络,建立了一个适用于任意灾点位置与数量的部分道路优先抢修与物资运输的联合调度模型,用以优化应急救援物资的运输。该模型松弛了现有研究中修复全部灾点的限制,允许在资源有限情况下进行部分灾点的优先抢修,同时还将震后恶劣天气对抢修工作效率的影响和各需求点的不同紧迫度纳入了考虑。针对该类混合整数规划使用分支限界法求解效率低下的问题,本文设计了一种类蚁群混合搜索启发式算法,能够在短时间内求解该模型得到近似最优解。进一步考虑震后恶劣天气预测的不确定性,本文首次引入灾点动态优先性的概念,在本文模型与启发式算法的基础上利用蒙特卡洛仿真给出了一种评价灾点动态优先性的方法。最后,通过汶川大地震中安县的实例分析,证明了本文所提联合调度模型、启发式算法和仿真方法的有效性和实用性。
[Abstract]:The repair of damaged roads and the transportation of relief materials are one of the focus of emergency work after the earthquake. The timely delivery of relief materials is the key to ensuring the life and safety of the people in the disaster area. However, in the actual work, the road repair plan and the material transportation plan are usually separated by different decision-making departments, which can not fully take into account the mutual relationship between the two. It is easy to cause the delay of distributing the limited emergency repair resources to the non critical disaster points and causing the delay of the transportation of emergency relief materials. Therefore, in this paper, the problem of emergency repair and relief materials transportation in the emergency period of the earthquake in the case of shortage of resources, by simplifying the complex topological relation in the road network, and using the space-time network, has been established. In order to optimize the transportation of emergency relief materials, this model relaxes the limitation of repairing all the disaster points in the existing research, allowing for the priority repair of some disaster points under the limited resources and the bad weather after the earthquake to the repair workers. The effect of efficiency and the different urgency of each demand point are taken into consideration. In order to solve the problem of inefficiency by using the branch and limit method for this kind of mixed integer programming, a kind of ant colony optimization algorithm is designed in this paper, which can get the near optimal solution in a short time. Further consideration is given to the bad weather preearthquake. In this paper, the concept of dynamic priority of disaster points is introduced for the first time. On the basis of this model and heuristic algorithm, a method for evaluating the dynamic priority of the disaster point is given by Monte Carlo simulation. Finally, through an example of an earthquake in an County of Wenchuan, the combined scheduling model and heuristic algorithm proposed in this paper are demonstrated. And the effectiveness and practicability of the simulation method.

【学位授予单位】:上海交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U492.22;U418

【相似文献】

相关期刊论文 前10条

1 张毅;郭晓汾;李金辉;;灾后道路抢修和物资配送的整合优化算法[J];交通运输工程学报;2007年02期

2 霍建顺;薛梅;李爱庆;;具有模糊抢修时间的震后道路抢修排程研究[J];统计与决策;2010年04期

3 颜仰礼;;兰州市“畅交通”工程旧城道路抢修设计与施工[J];城市道桥与防洪;2012年09期

4 陈钢铁;帅斌;;震后道路抢修和应急物资配送优化调度研究[J];中国安全科学学报;2012年09期

5 黄益民;安强;张家兴;蒋佑冬;沈志远;;素混凝土改良黄土性能研究[J];科技信息;2011年15期

6 郑蓬礼;;TQL快速材料在市政道路抢修中的应用[J];城市道桥与防洪;2008年05期

7 祖婧;;指挥·先锋·兄弟——中铁二十三局集团四公司副总经理李培平抗震救灾记[J];建筑;2008年15期

8 苏剑涛;薛强;;地震灾区公路抢修的几点思考[J];湖南农机;2010年11期

9 ;选择英达的理由之江苏市政篇——为什么如此青睐英达“修路王”?![J];交通世界(建养.机械);2012年Z1期

10 ;[J];;年期

相关重要报纸文章 前5条

1 见习记者 焦小超 记者 马国军;泉城路道路抢修形成6套试验方案[N];济南日报;2011年

2 赵晖 实习生 施祝慧 高吉庆;连绵雨伤了“高龄路”[N];无锡日报;2009年

3 记者 李清华;新疆兵团实兵演练国防交通道路抢修[N];新华每日电讯;2010年

4 通讯员 刘全军;紫阳迅速开展水毁道路抢修[N];安康日报;2007年

5 本报驻武汉记者 黎江东;聚合的效应[N];中国建材报;2001年

相关硕士学位论文 前3条

1 许蓓;震后应急期道路抢修与物资运输联合调度[D];上海交通大学;2015年

2 霍建顺;震后应急期道路抢修优化排程研究[D];西南交通大学;2010年

3 郑丽;震后应急物资配送与道路抢修集成优化研究[D];西南交通大学;2012年



本文编号:1776816

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1776816.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户aec2f***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com