  本文选题:重载运输 + 钢筋混凝土涵洞 ; 参考:《中国铁道科学研究院》2015年硕士论文


【摘要】:铁路重载运输因其具有运输能力大、效率高、运输成本低等优势而受到世界各国的广泛重视。朔黄铁路作为我国主要重载铁路之一,为适应不断增长的煤炭运输要求,朔黄铁路亟需提高铁路运输能力。本文以朔黄铁路钢筋混凝土涵洞为研究对象,对30t及以上轴重货车作用下涵洞的承载能力和重载改造技术进行了研究。对涵洞按中-活载之特种荷载图式轴重250~350kN加载进行检算,结果表明:在设计活载作用情况下,混凝土压应力、钢筋拉应力、主拉应力及裂缝宽度均满足设计要求,在中一活载条件下,仍有一定的剩余。在运行30t轴重货车时,涵洞的一些控制截面已经不能满足运营荷载的要求,具体表现:涵顶无填土工况控制设计,填土厚度小于1.0m的盖板受轴重提高影响较明显,轴重提高后普遍超过规范限值;低边墙框构涵底板跨中下缘钢筋应力在主力组合时超过规范限值;同时,低边墙框构涵比中、高边墙受力更为不利,对轴重提高的反应也更明显。涵洞实体试验结果亦表明,30t大轴重货车对涵洞的作用效应(钢筋应变、跨中挠度)均大于运营列车作用效应,最大分别超过10%~22%、9%~18%。因此,为确保重载货物列车运营安全,必须进行加固改造。以1.2倍ZH活载作用下的涵洞结构效应不超过改造前中-活载作用下的效应并满足现行规范的要求为加固目标,针对涵洞的不同情况拟定了相应加固方案,并对其中加固方案的加固效果进行了详细检算,检算结果表明所提方案均能改善结构受力,达到涵洞重载改造的目的,对保证朔黄铁路重载运输顺利实施具有重要意义。
[Abstract]:Railway heavy haul transportation has been paid more and more attention all over the world because of its advantages of large capacity, high efficiency and low transportation cost. Shuohuang Railway is one of the main heavy-haul railways in China. In order to adapt to the increasing demand of coal transportation, Shuohuang Railway urgently needs to improve the capacity of railway transportation. Taking the reinforced concrete culvert of Shuohuang Railway as the research object, the bearing capacity and heavy load modification technology of the culvert under the action of 30 t and more axle load freight cars are studied in this paper. The 250~350kN loading of culvert according to the special load schema of mid-live load is calculated. The results show that the compressive stress, the tensile stress, the main tensile stress and the crack width of concrete meet the design requirements under the condition of design live load, the concrete compressive stress, the steel bar tensile stress, the main tensile stress and the crack width are all satisfied with the design requirements. There is still a certain amount of surplus under the condition of medium-1 live load. Some control sections of culvert can no longer meet the requirements of operation load when running a 30t axle load truck. The concrete manifestation is: the control design of the working condition of culvert without filling, the cover plate with filling thickness less than 1.0 m is obviously affected by the increase of axle load. When the axial load is increased, the limit value of the code is generally exceeded; the stress of the steel bar at the middle and lower edge of the bottom span of the culvert with low side wall frame structure exceeds the limit value of the code when the main force is combined; at the same time, the stress of the high side wall is more disadvantageous in the low ratio of the frame to the culvert, The response to the increase of axle load is also more obvious. The results of solid test of culverts also show that the effect on culverts (reinforcement strain, mid-span deflection) of large axle loads of 30 tons is greater than that of running trains, and the maximum value is more than 100.22229% and 18.8% respectively. Therefore, in order to ensure the safety of heavy-haul freight train operation, it is necessary to strengthen and transform. Considering that the culvert structure effect under 1.2 times ZH live load does not exceed the mid-live load effect before the transformation and meets the requirements of the current code, the corresponding reinforcement scheme is proposed for the different conditions of the culvert. The results show that the proposed scheme can improve the stress of the structure and achieve the purpose of the culvert heavy load transformation. It is of great significance to ensure the smooth implementation of heavy haul transportation of Shuohuang railway.
【学位授予单位】:中国铁道科学研究院
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U449.5

【相似文献】

相关期刊论文 前10条

1 本刊记者;;平淡中的辉煌[J];铁路技术创新;2013年02期

2 李晓建;;朔黄铁路科技创新[J];铁路技术创新;2013年02期

3 陈伟;;朔黄铁路信息化建设[J];铁路技术创新;2013年02期

4 ;发展的朔黄铁路 源于国铁 优于国铁[J];铁道技术监督;2012年S1期

5 郭晓峰;;朔黄铁路 朔黄人 打造“全国精神文明建设工作先进单位”[J];铁道技术监督;2012年S1期

6 张素娟,刘占阳,姚丽芬;朔黄铁路与沿线地带经济发展[J];地理与地理信息科学;2003年02期

7 叶青;朔黄铁路建设和运营模式[J];中国铁路;2003年08期

8 王兆成;朔黄铁路的改革创新之路[J];铁道经济研究;2003年02期

9 帖立彬;创新机制 科学管理[J];内蒙古科技与经济;2005年17期

10 宋丽莉,焦艳,何育军,何宇强;朔黄铁路增运扩能的探讨[J];铁道运输与经济;2005年11期

相关会议论文 前1条

1 荆志东;李守礼;;朔黄铁路工程地质问题与对策[A];中国铁道工程地质世纪成就论文集[C];2005年

相关重要报纸文章 前10条

1 张福纯 熊学军;朔黄铁路全线通车[N];人民日报;2002年

2 红星 俊海 玉杰 火荣;朔黄铁路电气化神肃段贯通[N];山西日报;2001年

3 王建民邋张学成;依据气象信息科学调度 朔黄铁路原平分公司效益可观[N];中国气象报;2007年

4 郭红雨 李芙蓉;朔黄铁路一年贡献税款近亿元[N];中国税务报;2007年

5 罗茜;朔黄铁路:在创新中见证辉煌[N];中国企业报;2009年

6 通讯员 赵金海 记者 焦同喜;朔黄铁路通过国家验收[N];河北经济日报;2005年

7 通讯员 赵金海 记者 硕强 马路;朔黄铁路通过国家验收[N];河北日报;2005年

8 通讯员 赵金海 记者 硕强;朔黄铁路提前25天完成全年任务[N];河北日报;2005年

9 通讯员 赵金海 记者 硕强;朔黄铁路扩能改造一期工程首战告捷[N];河北日报;2005年

10 本报记者 程瑞华 王晓欣;跨世纪工程——朔黄铁路[N];金融时报;2001年

相关硕士学位论文 前10条

1 吴艳玲;朔黄铁路公司核心竞争力构建研究[D];北京交通大学;2008年

2 李友田;朔黄铁路资产管理系统设计与优化[D];西南交通大学;2005年

3 罗静波;朔黄铁路西柏坡新建卸煤场方案研究[D];石家庄铁道大学;2016年

4 胡大辉;朔黄铁路钢筋混凝土涵洞重载改造技术研究[D];中国铁道科学研究院;2015年

5 王新平;朔黄铁路货运发展战略研究[D];北京交通大学;2008年

6 梁才;朔黄铁路物流管理优化[D];北京交通大学;2008年

7 刘继永;朔黄铁路肃宁分公司供电设备运行管理研究[D];华北电力大学(北京);2011年

8 王定举;朔黄铁路公司发展战略研究[D];西南交通大学;2007年

9 龙燕;朔黄铁路公司物流管理研究[D];石家庄铁道大学;2014年

10 贾晋中;朔黄铁路体制创新与企业效应研究[D];西南交通大学;2005年



本文编号:1938591

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1938591.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e165c***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com