顶推法施工自锚式悬索桥关键技术与控制

发布时间:2018-06-04 18:22

  本文选题:自锚式悬索桥 + 顶推法施工 ; 参考:《沈阳建筑大学》2015年硕士论文


【摘要】:近几年来,随着自锚式悬索桥越来越广泛地应用,特别是在我国,自锚式悬索桥更是受到了许多工程师的青睐。自锚式悬索桥之所以得到了大力推广,主要是因为该类桥具有美观的桥型;在其适用的跨径范围内,建造的工程费用相对其他桥型而言更低廉。然而,自锚式悬索桥的施工控制理论和技术相对比较薄弱,有关这方面的研究在国内外还比较少,现有的理论、设计方法和施工都还有待在实践工程中去检验、提取、归纳与总结,从事这方面的研究工作无疑是很有意义的。本文结合潮白河自锚式悬索桥的施工过程,对其施工中的关键技术和施工控制进行了研究,取得了具有实用价值的研究成果,为潮白河自锚式悬索桥的顺利建成提供了技术支持。(1)详细介绍了顶推法施工的分类,顶推施工过程中的临时设施以及顶推法施工的优缺点。潮白河大桥的钢箱梁采用顶推法施工,钢箱梁在顶推过程中的动态应力监控结果与理论值较为吻合,应力没有超过设定预警值。钢箱梁顶推就位后,钢箱梁静态应力监测结果显示,顶推到位后钢箱梁应力较小,在安全范围内。临时墩及顶推平台位移监测结果显示,4#临时墩存在顶推过程中位移超出预警值情况,经调整能够满足安全要求。临时墩应力监测结果显示,临时墩处于压力状态。(2)详细介绍了自锚式悬索桥的受力特性、计算理论及施工控制方法。通过对潮白河大桥的上部结构施工监控,得出以下结论:桥塔下横梁受顶推施工影响较小,在后期监控中可适当放松对其监测力度。通过对潮白河自锚式悬索桥监测工况的加劲梁、桥塔下横梁等构件的施工控制方法以及应力、变形测试数据。结果表明潮白顶推法施工河自锚式悬索钢桥各部分在整个施工过程中状态控制良好,达到了预想的设计效果。
[Abstract]:In recent years, with the application of self-anchored suspension bridge more and more widely, especially in China, self-anchored suspension bridge is favored by many engineers. The reason why self-anchored suspension bridge is popularized is mainly because it has beautiful bridge type and the construction cost is lower than other bridges in the suitable span range. However, the construction control theory and technology of self-anchored suspension bridge are relatively weak, and the research on this aspect is still relatively few at home and abroad. The existing theories, design methods and construction have yet to be tested and extracted in practical engineering. Induction and summary, engaged in this area of research is undoubtedly very meaningful. Combined with the construction process of Chaobai River self-anchored suspension bridge, the key technology and construction control in its construction are studied in this paper, and the research results with practical value are obtained. This paper provides technical support for the successful construction of Chaobai River self-anchored suspension bridge. It introduces in detail the classification of jacking construction, the temporary facilities in the construction process and the advantages and disadvantages of the jacking construction. The steel box girder of Chaobaihe Bridge is constructed by pushing method. The dynamic stress monitoring results of the steel box girder in the process of pushing are in good agreement with the theoretical value, and the stress does not exceed the pre-warning value. The static stress monitoring results of the steel box girder show that the stress of the steel box girder is small and within the safe range. The displacement monitoring results of temporary pier and jacking platform show that the displacement of temporary pier exceeds the warning value in the process of pushing, and the adjustment can meet the safety requirements. The stress monitoring results of temporary pier show that the temporary pier is in the state of pressure.) the stress characteristics, calculation theory and construction control method of self-anchored suspension bridge are introduced in detail. By monitoring and controlling the superstructure of Chaobaihe Bridge, the following conclusions are drawn: the beam under the bridge tower is less affected by the jacking and pushing construction, and the monitoring intensity can be relaxed properly in the later period of monitoring. Through the construction control method and the test data of stress and deformation of the self-anchored suspension bridge in Chaobai River, such as stiffened beam, bridge tower beam and so on. The results show that every part of river self-anchored suspension steel bridge is well controlled in the whole construction process, which achieves the desired design effect.
【学位授予单位】:沈阳建筑大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.462

【相似文献】

相关期刊论文 前10条

1 舒晓文,祁军强;伊莱·福尔肯大桥的顶推设计与施工[J];国外公路;2001年02期

2 徐化轩;顶推梁桥施工中可能出现的技术问题及对策[J];铁道工程学报;2002年02期

3 徐华轩;;顶推梁桥施工中可能出现的技术问题及对策[J];OVM通讯;2002年06期

4 赵如东;连续梁顶推技术的新发展[J];水运工程;2004年03期

5 刘大洋;;顶推法施工工艺的探讨[J];四川建材;2007年03期

6 陈继光;;顶推法施工关键工艺改进[J];筑路机械与施工机械化;2008年03期

7 何杰;于雪梅;;多点顶推在钢筋混凝土连续箱梁中的具体应用[J];中国建设信息;2008年08期

8 曹航;;采用顶推法施工的西德维纳大桥[J];黑龙江交通科技;2011年09期

9 闵祥涛;刘涛;;桥梁顶推法施工工艺控制分析[J];现代商贸工业;2011年23期

10 张连海;;顶推法施工桥梁[J];北方交通;2012年07期

相关会议论文 前3条

1 石毅生;;钱塘江第二大桥铁路引桥预应力钢筋混凝土梁新颖单点顶推法[A];中国土木工程学会桥梁及结构工程学会第九届年会论文集[C];1990年

2 金伟;彭锦;;预应力混凝土桥梁顶推法施工技术的理论与实践[A];2014年4月建筑科技与管理学术交流会论文集[C];2014年

3 马春生;李江山;郭范围;彭向荣;;广东省九江大桥设计[A];'95预应力混凝土连续梁和刚构桥学术会议论文集[C];1995年

相关重要报纸文章 前2条

1 刘三琴;一桥飞架 天堑变通途[N];南方日报;2006年

2 本报记者 沈刚 李瑾 本报特约通讯员 彭伦理 刘健 唐博学;工人设计师王海[N];工人日报;2004年

相关博士学位论文 前1条

1 牛辉;空间拱肋组合桥梁顶推施工技术研究[D];浙江大学;2012年

相关硕士学位论文 前10条

1 刘承启;三拱肋下承式钢拱桥顶推施工关键技术研究[D];西南交通大学;2015年

2 姚永鹤;大跨径预应力混凝土连续梁桥无跨中临时墩顶推施工技术研究[D];浙江工业大学;2014年

3 杨兴华;顶推法施工自锚式悬索桥关键技术与控制[D];沈阳建筑大学;2015年

4 李洪明;跨铁路钢箱梁桥顶推法施工关键技术研究[D];西南交通大学;2013年

5 杨辉;钢箱梁步履式平移顶推受力特性与施工技术[D];南昌大学;2010年

6 杨磊;混凝土斜连续梁顶推施工期风险评估与预防措施[D];长沙理工大学;2012年

7 徐甜;大跨度钢箱梁顶推受力特性及监测控制研究[D];长沙理工大学;2011年

8 龙煈;长沙市福元路湘江大桥提篮式拱桥拼装与顶推的控制技术[D];长沙理工大学;2012年

9 王鹤;下坞蓟运河特大桥7跨连续梁顶推施工技术研究[D];中南大学;2012年

10 付书林;超重车超长连续梁桥组拼顶推新技术研究[D];华东交通大学;2011年



本文编号:1978401

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/1978401.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d68e1***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com