市政道路下穿城市复杂区域隧道工程总体方案设计
发布时间:2018-06-13 14:21
本文选题:市政隧道 + 总体方案 ; 参考:《铁道标准设计》2017年09期
【摘要】:通过对康王路下穿流花湖隧道工程复杂建设条件下控制因素分析,提出合理的总体设计方案,旨在探求在复杂建设条件下城市大型隧道工程科学合理的工程全局构思理念。城市道路隧道设计是一个综合性课题,与地形、地貌、工程地质、水文地质、社会人文和环境等多方面因素密切相关,它需要设计者在满足设计规范的前提下,对涉及方案的影响因素和控制条件进行逐步分析,理清主次,结合路网规划、隧道埋深、洞口位置及洞外接线、工期等综合考虑,进行多方案比较,从而合理得出最有利的道路方案和隧道方案。
[Abstract]:Based on the analysis of the control factors under the complex construction conditions of the tunnel through Liuhuahu tunnel under Kangwang Road, a reasonable overall design scheme is put forward in order to explore the scientific and reasonable overall conception of the urban large-scale tunnel project under the complex construction conditions. The design of urban road tunnel is a comprehensive subject, which is closely related to many factors, such as topography, geomorphology, engineering geology, hydrogeology, social humanities and environment, etc. The influence factors and control conditions involved in the project are analyzed step by step, the main and secondary items are sorted out, combined with the road network planning, the depth of the tunnel, the location of the tunnel entrance and the tunnel outer connection line, the construction period, and so on, the multi-scheme comparison is carried out. Thus, the most favorable road scheme and tunnel scheme can be reasonably obtained.
【作者单位】: 中铁第一勘察设计院集团有限公司;
【分类号】:U452
【相似文献】
相关期刊论文 前10条
1 路石;埃及软土隧道工程[J];铁道建筑;2000年10期
2 ;直径达五层楼高的上中路隧道工程[J];岩土工程界;2004年01期
3 林志;蒋树屏;;挪威隧道工程安全管理架构[J];公路隧道;2007年02期
4 ;蓟平高速隧道工程实现全部贯通[J];岩土工程界;2008年02期
5 陶晓南;;隧道工程中的风险及其分担[J];建筑;2008年08期
6 张仁利;陈赛美;吴士华;;隧道工程施工质量控制[J];中国新技术新产品;2010年15期
7 本刊记者;;“第五届中国国际隧道工程研讨会”将于11月10—12日在中国上海举行[J];隧道建设;2011年05期
8 孟庆伶;日本高速公路隧道工程[J];铁道建筑;2000年08期
9 曹武现;铁道部隧道工程局一批科研成果获奖[J];岩土工程界;2000年04期
10 ;隧道工程[J];公路运输文摘;2000年06期
相关会议论文 前10条
1 李志宏;黄宏伟;薛亚东;;基于风险的隧道工程成本预测研究[A];第十届全国岩石力学与工程学术大会论文集[C];2008年
2 侯秉承;R壓胂,
本文编号:2014310
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2014310.html