本文选题:桩基托换 + 设计理论 ; 参考:《兰州交通大学》2015年硕士论文
【摘要】:随着城市向大型化、现代化方向发展,城市的地面交通压力越来越大,为了缓解地面交通压力,建设高效、便捷的地下铁道成为众多城市改善交通状况的首选,同时地下铁道的发达程度也成为衡量一座城市现代化的重要指标。地铁隧道的建设与既有建筑物基础的冲突无法避免,这就需要对侵入隧道内的桩基进行托换。桩基托换往往与隧道的施工是密不可分的,因此研究隧道施工过程中桩基托换的力学行为具有重要的现实意义。本文首先介绍基础托换的几种分类方法、托换桩的主要类型和特点、托换承重体系的主要类型,然后阐述了国内外托换工程研究现状和重要实例以及基础托换过程中应注意的几个问题。对桩基托换的设计理论进行了详细阐述,重点归纳了桩基托换结构设计的难点和重点,给出了托换结构各部件的设计方法,着重分析了托换梁和托换新桩节点设计的思路以及托换梁与托换柱节点的抗剪机理,并对桩基托换的施工监测体系进行详细说明。对兰州市地铁一号线拱星墩~焦家湾区间隧道下穿烂泥沟桥的工程概况以及数值分析中的有限元的相关理论作了介绍,对隧道直接下穿烂泥沟桥的开挖以及切桩过程进行了较为详细的数值模拟分析,分析了隧道开挖和切桩过程桩基和土层的力学行为,并从控制沉降的角度分析,得出隧道直接下穿烂泥沟桥梁引起的结构沉降不满足规范要求,必须对烂泥沟桥梁进行加固或改造。对烂泥沟桥的加固或改造工程提出了三种可行性方案,最后采用对比分析的方法,得出被动式桩基托换方案为最佳方案。对烂泥沟地面桩基托换洞内截桩的被动式桩基托换施工过程进行了详细的数值模拟分析,从沉降、应力以及内力方面对计算结果进行分析,证明了该托换方案是合理、可行的。
[Abstract]:With the development of city towards large scale and modernization, the pressure of urban ground traffic is increasing. In order to alleviate the pressure of ground traffic, the construction of efficient and convenient underground railway has become the first choice for many cities to improve the traffic condition. At the same time, the development of subway has become an important indicator to measure the modernization of a city. The conflict between the subway tunnel construction and the existing building foundation cannot be avoided, so it is necessary to replace the pile foundation that intrudes into the tunnel. Pile foundation underpinning is often closely related to tunnel construction, so it is of great practical significance to study the mechanical behavior of pile foundation underpinning during tunnel construction. This paper first introduces several classification methods of foundation underpinning, the main types and characteristics of underpinning piles, the main types of underpinning load bearing system, Then the present situation and important examples of underpinning engineering at home and abroad and some problems needing attention in the process of foundational underpinning are expounded. The design theory of pile foundation underpinning is expounded in detail. The difficulties and key points of pile foundation underpinning structure design are summarized, and the design methods of various components of pile foundation underpinning structure are given. The paper emphatically analyzes the design idea of the supporting beam and the new pile joint, and the shear mechanism of the underpinning beam and the underpinning column joint, and explains in detail the construction monitoring system of the pile foundation underpinning. This paper introduces the engineering situation of the tunnel under the tunnel between the arch star pier and the Jiaojiawan section of Lanzhou Metro Line 1 through the muddy ditch bridge and the relevant theory of the finite element method in the numerical analysis. The excavation and pile cutting process of tunnel directly through muddy ditch bridge are simulated and analyzed in detail. The mechanical behavior of pile foundation and soil layer during tunnel excavation and pile cutting are analyzed, and the settlement control is analyzed from the point of view of controlling settlement. It is concluded that the structural settlement caused by the tunnel directly passing through the muddy ditch bridge does not meet the requirements of the code, so it is necessary to strengthen or rebuild the muddy ditch bridge. In this paper, three feasible schemes are put forward for the reinforcement or reconstruction of the muddy ditch bridge. Finally, by using the method of comparative analysis, it is concluded that the passive pile foundation underpinning scheme is the best scheme. In this paper, the numerical simulation analysis of the construction process of the passive pile foundation underpinning in the retaining tunnel of the ground pile foundation in the muddy ditch is carried out, and the calculation results are analyzed from the aspects of settlement, stress and internal force. It is proved that the replacement scheme is reasonable and feasible.
【学位授予单位】:兰州交通大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U445.551
【相似文献】
相关期刊论文 前10条
1 谷伟平,李国雄;广州市地铁一号线基础托换工程的理论分析与设计[J];岩土工程学报;2000年01期
2 吴方伯,陈大川;南天大厦梁柱及砖墙托换介绍[J];中外建筑;2000年03期
3 柯梅丽;世界第一大轴力托换工程在深圳顺利截桩[J];施工技术;2002年04期
4 郑文忠,周威,王英;哈尔滨商业幼儿园托换改造设计[J];低温建筑技术;2002年04期
5 林桂武;某车间柱下独立基础的坑式托换处理[J];广西电业;2002年06期
6 李安起,都爱华,张鑫,范西龙;某选煤厂运输走廊的托换改造[J];工业建筑;2003年11期
7 王世君;;桩基托换技术在广州地铁三号线工程中的应用[J];施工技术;2006年06期
8 王昌;刘晏斌;赵虎;袁占刚;;中央大道四号路地道托换工程施工技术综述[J];天津建设科技;2008年06期
9 涂强;;大轴力桩基托换变形控制值确定[J];铁道工程学报;2008年02期
10 王利萍;;浅谈主体结构托换在工程实践中的应用[J];新疆有色金属;2008年05期
相关会议论文 前10条
1 顾远生;;移位工程中托换结构节点设计探讨[A];城市地下空间综合开发技术交流会论文集[C];2013年
2 都爱华;张鑫;朱维申;;框架柱托换节点承载力计算公式的理论研究[A];第19届全国结构工程学术会议论文集(第Ⅲ册)[C];2010年
3 吕剑英;;桩基的地下托换方法[A];中国城市轨道交通新技术(第三集)[C];2009年
4 周宁;鲍宇清;袁广林;;顶升纠偏托换结构设计方法及试验研究[A];首届全国既有结构加固改造设计与施工技术交流会论文集[C];2007年
5 张建林;潘立;张吉柱;于岳;汪光文;;钢结构托换的改造技术工程实例[A];首届全国既有结构加固改造设计与施工技术交流会论文集[C];2007年
6 王建永;林其荃;朱启华;;混凝土托换结构计算方法分析[A];第十届建构筑物改造和病害处理学术研讨会、第五届工程质量学术会议论文集[C];2014年
7 汪剑;尹胜文;朱建群;陈坚;;结合深圳市儿童医院改扩建工程实例探讨厚板托换跨越地铁隧道的应用[A];第四届全国建筑结构技术交流会论文集(上)[C];2013年
8 刘文彬;池雪仔;;某会所承重墙体的托换加固设计[A];第四届全国现代结构工程学术研讨会论文集[C];2004年
9 秦浩;完海鹰;;某老建筑的墙体托换的设计及施工[A];首届全国既有结构加固改造设计与施工技术交流会论文集[C];2007年
10 王永祯;;邢台水泵厂铸造车间柱基础工程托换加固处理[A];中国土木工程学会土力学及基础工程学会地基处理学术委员会第三届地基处理学术讨论会论文集[C];1992年
相关重要报纸文章 前2条
1 钟仕平邋王良雷;中隧三处再亮“偷梁换柱”绝技[N];中国交通报;2008年
2 通讯员 张权德 郑永刚;“被动式基础托换”施工工艺开全国先河[N];人民铁道;2006年
相关博士学位论文 前4条
1 都爱华;框架结构移位托换节点受力机理的研究[D];山东大学;2010年
2 邬毛志;利用钢管桩实施基础托换的关键技术研究[D];华中科技大学;2009年
3 卜建清;车辆动荷载作用下桥梁墩柱主动托换关键技术研究及应用[D];中国铁道科学研究院;2011年
4 曹书文;基础托换在砖石古建筑保护中的应用研究[D];西安建筑科技大学;2014年
相关硕士学位论文 前10条
1 刘鑫;砌体承重墙双梁式托换结构受力性能试验研究[D];山东建筑大学;2015年
2 巩善亮;框架柱托换节点抗震性能的试验研究[D];山东建筑大学;2015年
3 贾培栋;被动式桥梁桩基托换方案研究与应用[D];兰州交通大学;2015年
4 李莹;建筑物整体平移托换结构节点受力性能试验研究[D];山东大学;2008年
5 柴玉国;既有线路改造中主动托换法的施工应用研究[D];中国地质大学(北京);2010年
6 刘涛;建筑物移位工程托换结构水平受力分析[D];山东建筑大学;2010年
7 王玉宝;大轴力桩基托换工程结构技术的应用研究[D];铁道部科学研究院;2001年
8 杨再道;大轴力桩基托换施工安全监测的研究[D];铁道部科学研究院;2003年
9 王浩;深圳地铁下穿百货广场特大轴力桩基托换技术研究[D];西南交通大学;2007年
10 于京昌;桩梁式托换荷载转换规律和变形特性的数值分析[D];山东建筑大学;2013年
,本文编号:2099715
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2099715.html