京港澳高速驻马店至信阳段改扩建工程方案研究与综合评价
[Abstract]:The section between Zhumadian and Xinyang of Beijing-HongKong-Macao Expressway (G4) is located in the south of Henan Province. It is a reconstruction and extension project between Zhumadian and Xinyang in Henan Province, which is planned to be carried out by Beijing-HongKong-Macao Expressway (G4). This paper discusses the necessity of the reconstruction and extension project from various factors, including economy, regional development, technology, industrial structure and so on. After that, the strategic significance of highway network planning is analyzed from the overall and regional perspectives, and the positioning and important role of the reconstruction and extension project in the highway network is clarified. This paper puts forward two schemes of building new double line and carrying out widening on the basis of existing highway in Xinxin. Based on the design and completion of the existing construction drawings of the existing highway, this paper analyzes a series of problems arising from the expansion, analyzes the various possibilities of the reconstruction and extension project, and analyzes the current status of the existing roads. The practical problems that may appear in the implementation of the project are summarized, and solutions are put forward in advance. Through comprehensive analysis and evaluation, a reasonable standard of reconstruction and extension is selected. After deeply studying the possibility and technical feasibility of widening and rebuilding the old road and the positive and negative effects of the new double-track on the whole channel, this paper makes a comparative analysis of the expansion and the new construction of the two schemes. Finally, the old road widening and transformation is determined as the recommended scheme, and its economic evaluation and energy saving analysis are carried out.
【学位授予单位】:湖北工业大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U418.8
【参考文献】
相关期刊论文 前10条
1 陈胜武;;互通立交扩建方案探讨[J];中外公路;2010年01期
2 张蕾;陈馥利;王迎;;立交改扩建作业区交通特性及安全对策研究[J];公路与汽运;2009年06期
3 郭利平;李开正;;潼西高速公路改扩建工程交通组织方案的探讨[J];交通科技;2009年S2期
4 陈开圣;方琴;熊岚;;路基边坡稳定性评价方法研究[J];路基工程;2009年01期
5 张世平;;考虑施工交通组织的桥梁改扩建方案设计——沪宁高速公路(江苏段)扩建工程[J];中外公路;2008年02期
6 时义鹄;;我国高速公路发展与改扩建拓宽工程综述[J];湖南交通科技;2007年04期
7 梁启斌;王浩;;公路既有路基检测评价技术探讨[J];公路交通科技;2006年11期
8 李德慧;孙小端;刘小明;William Fitzgerald;;高速公路改扩建道路设计的安全问题[J];北京工业大学学报;2006年10期
9 吴赞平;赵佳军;陈金东;王家强;吴瑞麟;;沪宁高速公路扩建工程原有道路路况评价及对策研究[J];现代交通技术;2006年05期
10 胡利娥;;运行速度对某高速公路线形设计安全性的分析评价[J];湖南交通科技;2006年02期
相关硕士学位论文 前10条
1 白鹏飞;半刚性基层沥青路面病害分析及防治研究[D];郑州大学;2016年
2 董欣烨;南宁平乐大道与玉洞大道互通式立交工程方案研究[D];长安大学;2015年
3 陈攻宇;基于非线性模糊法的高速公路互通式立交安全评价研究[D];长安大学;2014年
4 位军;京港澳高速公路许昌北互通立交工程可行性研究[D];重庆交通大学;2014年
5 徐洋;互通式立交范围内主线主要技术指标研究[D];长安大学;2014年
6 符琦;双喇叭类互通式立交适应性及技术指标研究[D];长安大学;2014年
7 李瑞杰;高速公路菱型互通式立交技术指标及其适应性研究[D];长安大学;2014年
8 张景涛;B型喇叭互通式立交的安全性评价与保障措施[D];长安大学;2013年
9 闫向阳;厦蓉线高速公路改扩建工程方案研究[D];长安大学;2013年
10 郭涛;高速公路改扩建方案选择及路面再生标准研究[D];长安大学;2013年
,本文编号:2125831
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2125831.html