苏州阳澄半岛水上自行车道施工方案设计
发布时间:2018-08-23 10:33
【摘要】:近年来,随着城市慢生活的推动及市民要求环保出行,自行车道在我国大量建设,尤其是在2014年后,为了加快苏州阳澄半岛生态休闲公园的建设,水上自行车道施工被提上议事日程。阳澄湖水上自行车道位于阳澄半岛,自行车道总规划建设长度20.8公里,其中水上自行车道建设4.5公里。本论文首先对水上自行车道工程概况、设计理念进行了介绍;接着结合阳澄半岛水上自行车道施工实际情况,对水上自行车道的围堰施工作了设计说明,施工方案重点介绍了钢管桩围堰施工的施工流程、围堰填筑、拆除的主要准备工作;5号桥干河施工采用土围堰,对土围堰进行了承载力验算。围堰的维护主要是对围堰的湖水水位进行观测,确保围堰在高水位期间的安全稳定。灌注桩施工,根据灌注桩的施工流程,结合灌注桩需要检测孔深、倾斜度、直径和清孔的规范要求,提出了钻孔灌注桩易出现坍孔、卡钻、掉钻、扩孔及缩孔的预防及处理措施;结合灌注桩的泥浆排放,提出了使阳澄湖水质不受破坏的泥浆排放方案。∏型梁模板、支架施工,介绍了支架搭设顺序,根据模板支架设计进行了验算,结合支模架预压及沉降观测、支架的拆除原则及顺序,提出了支架拆卸的安全保证措施。现浇梁支架搭设施工,介绍了支架搭设顺序,运用模架计算书,验证了现浇梁支架搭设施工方案可行。质量保证与安全措施,依据《苏州市建筑工地文明施工管理规定》及苏州市工业园区规划建设局施工标准化的有关规定,建立质量管理机构,结合质量管理责任制,提出了水上自行车道施工的分部分项工程质量保证措施,提出了过程控制的安全技术措施。本文为水上自行车道施工方案编制提供了一个实例,也可为类似水上自行车道施工方案的编制和选定提供参考。
[Abstract]:In recent years, with the promotion of slow life in the city and the citizens' demand for environmental protection, bicycle lanes have been built in large numbers in China, especially after 2014, in order to speed up the construction of the ecological leisure park in the Yangcheng Peninsula in Suzhou. Construction of a water bike lane was put on the agenda. Yangcheng Lake water bike lane is located in Yangcheng Peninsula, the overall planning length of bicycle lane is 20.8 kilometers, of which water bike lane construction 4.5 kilometers. Firstly, this paper introduces the general situation and design concept of water cycle track, and then explains the construction of cofferdam in Yangcheng Peninsula, combining with the actual situation of the construction of water cycle lane on Yangcheng Peninsula. The construction scheme focuses on the construction process of the steel pipe pile cofferdam, the main preparatory work of the cofferdam filling and dismantling, and the earth cofferdam is used in the construction of the No. 5 bridge trunk river, and the bearing capacity of the soil cofferdam is checked and calculated. The maintenance of cofferdam is mainly to observe the lake water level of cofferdam to ensure the safety and stability of cofferdam during the period of high water level. In the construction of cast-in-place pile, according to the construction flow of cast-in-place pile and the standard requirement of testing hole depth, inclination, diameter and clearing hole, the paper puts forward that the bored pile is prone to collapse, jam and drop. The prevention and treatment measures of reaming hole and shrinkage hole, combined with the mud discharge of cast-in-place pile, the mud discharge scheme that makes the water quality of Yangcheng Lake not to be destroyed is put forward. According to the design of the formwork support, the safety guarantee measures are put forward according to the pre-compression and settlement observation of the support frame, the principle and sequence of the removal of the support. The construction of cast-in-place beam bracket is introduced, and the construction scheme of cast-in-place beam support is verified by using the calculation book of mould frame. Quality assurance and safety measures, in accordance with "Suzhou Construction site Civilization Construction Management regulations" and the relevant provisions of construction standardization of Suzhou Industrial Park Planning and Construction Bureau, establish quality control organizations and combine with quality management responsibility system. This paper puts forward the quality assurance measures of the water cycle track construction and the safety technical measures of the process control. This paper provides an example for drawing up the construction scheme of water cycle lane, and also provides a reference for the compilation and selection of the construction scheme of similar water cycle lane.
【学位授予单位】:苏州科技学院
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U415;TU745
[Abstract]:In recent years, with the promotion of slow life in the city and the citizens' demand for environmental protection, bicycle lanes have been built in large numbers in China, especially after 2014, in order to speed up the construction of the ecological leisure park in the Yangcheng Peninsula in Suzhou. Construction of a water bike lane was put on the agenda. Yangcheng Lake water bike lane is located in Yangcheng Peninsula, the overall planning length of bicycle lane is 20.8 kilometers, of which water bike lane construction 4.5 kilometers. Firstly, this paper introduces the general situation and design concept of water cycle track, and then explains the construction of cofferdam in Yangcheng Peninsula, combining with the actual situation of the construction of water cycle lane on Yangcheng Peninsula. The construction scheme focuses on the construction process of the steel pipe pile cofferdam, the main preparatory work of the cofferdam filling and dismantling, and the earth cofferdam is used in the construction of the No. 5 bridge trunk river, and the bearing capacity of the soil cofferdam is checked and calculated. The maintenance of cofferdam is mainly to observe the lake water level of cofferdam to ensure the safety and stability of cofferdam during the period of high water level. In the construction of cast-in-place pile, according to the construction flow of cast-in-place pile and the standard requirement of testing hole depth, inclination, diameter and clearing hole, the paper puts forward that the bored pile is prone to collapse, jam and drop. The prevention and treatment measures of reaming hole and shrinkage hole, combined with the mud discharge of cast-in-place pile, the mud discharge scheme that makes the water quality of Yangcheng Lake not to be destroyed is put forward. According to the design of the formwork support, the safety guarantee measures are put forward according to the pre-compression and settlement observation of the support frame, the principle and sequence of the removal of the support. The construction of cast-in-place beam bracket is introduced, and the construction scheme of cast-in-place beam support is verified by using the calculation book of mould frame. Quality assurance and safety measures, in accordance with "Suzhou Construction site Civilization Construction Management regulations" and the relevant provisions of construction standardization of Suzhou Industrial Park Planning and Construction Bureau, establish quality control organizations and combine with quality management responsibility system. This paper puts forward the quality assurance measures of the water cycle track construction and the safety technical measures of the process control. This paper provides an example for drawing up the construction scheme of water cycle lane, and also provides a reference for the compilation and selection of the construction scheme of similar water cycle lane.
【学位授予单位】:苏州科技学院
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U415;TU745
【相似文献】
相关期刊论文 前10条
1 赵骅;自行车道设计与修建准则——英国斯底文奇市修建自行车道经验总结[J];城市规划;1978年03期
2 余金城;改造旧路时修建简易自行车道的可行性研究[J];中南公路工程;1988年02期
3 李怀成;自行车“追尾”为哪般?[J];汽车运用;1998年02期
4 李忠东;;伦敦打造自行车高速公路[J];文体用品与科技;2014年05期
5 谭U,
本文编号:2198813
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2198813.html