BIM技术在预制T梁施工中的应用
发布时间:2018-08-29 12:12
【摘要】:基于Revit软件强大的建族功能,提出一种精确建立40m标准T梁三维信息模型的方法,并在施工图纸审查、三维技术交底、碰撞检查、材料管理和虚拟架设工作中加以应用,取得了良好的效果。
[Abstract]:Based on the powerful family building function of Revit software, this paper presents a method of accurately establishing 3D information model of 40m standard T-beam, and it is applied in construction drawing review, 3D technology background, collision inspection, material management and virtual erection. Good results have been achieved.
【作者单位】: 陕西铁路工程职业技术学院;
【基金】:陕西省教育厅2016年科学研究计划(自然科学专项)项目(16JK1170)
【分类号】:U445.47
[Abstract]:Based on the powerful family building function of Revit software, this paper presents a method of accurately establishing 3D information model of 40m standard T-beam, and it is applied in construction drawing review, 3D technology background, collision inspection, material management and virtual erection. Good results have been achieved.
【作者单位】: 陕西铁路工程职业技术学院;
【基金】:陕西省教育厅2016年科学研究计划(自然科学专项)项目(16JK1170)
【分类号】:U445.47
【参考文献】
相关期刊论文 前7条
1 曾绍武;王学峰;张学钢;孙卫锋;赵永锋;向艳华;;基于BIM的杭黄高铁建德东站现浇梁支架方案研究[J];铁道标准设计;2017年01期
2 曾绍武;张学钢;张林;李季晖;王安东;;预应力连续刚构桥梁BIM精细化建模实例[J];铁道标准设计;2016年02期
3 张为和;;基于BIM的夜郎河双线特大桥施工应用方案研究[J];铁道标准设计;2015年03期
4 逯宗田;;铁路设计应用BIM的思考[J];铁道标准设计;2013年06期
5 张人友;王s,
本文编号:2211169
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2211169.html