预应力混凝土梁桥关键施工技术分析与研究
[Abstract]:As an essential part of traffic construction, prestressed concrete beam bridge has been developed rapidly. In the span range of 40-200 meters, the prestressed concrete continuous beam bridge is often an ideal bridge type, whether from the point of view of the structural mechanical characteristics or the economy. Therefore, it is very important to study the key technology of design and construction of prestressed concrete continuous beam bridge. In this paper, the key technology of design and construction of prestressed concrete continuous beam bridge (1 脳 12.5 5 脳 20 m) is studied. The construction technology of the superstructure of the prestressed concrete continuous beam bridge and some problems in the construction technology of the continuous beam bridge are further studied, and the calculation and analysis are carried out. The main research work is as follows: 1. The development of prestressed concrete continuous beam bridge at home and abroad is discussed. This paper discusses the practical significance of construction control theory from the point of view of necessity and importance. It also shows the main contents of this paper, the design and calculation theory and analysis method of prestressed concrete beam bridge. Study on the Construction Control Theory of Prestressed concrete continuous Beam, considering the factors that can make the bridge deviate from the ideal state design among the many factors that affect the construction control effect. Can better guide the construction. 3, from the point of view of actual construction detailed introduction and analysis of the characteristics of the project. It mainly includes: general situation of bridge, quantity of main project, technical standard, technical condition, main material, structure design of box girder, construction essentials and so on, and puts forward the problems that may be encountered in construction and corresponding solutions. The construction organization design of the project is introduced in detail, including the concrete arrangement of personnel, materials, machinery and so on. The construction technology and safety quality assurance measures of prefabricated box girder and hollow slab. According to the existing design code and experience, the design parameters of prestressed concrete continuous beam bridge are worked out, and the calculation model is established by using the finite element analysis software Midas Civil. The internal force and deformation of the whole bridge are calculated and analyzed, including the changes of each T-structure internal force and deflection in the cantilever construction stage. At last, the finite element analysis model is established, and the simulation and calculation of the whole construction process are carried out, and the most disadvantageous stress situation and the whole stress state in the construction process of prestressed concrete beam bridge are studied.
【学位授予单位】:湖北工业大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U445.4
【相似文献】
相关期刊论文 前10条
1 谭振武;国内外公路预应力混凝土斜拉桥现状及关键施工技术[J];吉林水利;2004年09期
2 ;龙潭隧道关键施工技术[J];公路隧道;2010年02期
3 黎仁华;;绿色建筑关键施工技术应用研究[J];低碳世界;2014年15期
4 宁洪伟;;薄壁箱形混凝土现浇拱关键施工技术[J];城市道桥与防洪;2010年06期
5 罗德龙;超长钻孔灌注桩的关键施工技术[J];交通科技;2004年05期
6 王萍;;老庄田大桥关键施工技术解决方案[J];黑龙江交通科技;2010年08期
7 彭斌;;淹没库区峡谷地形公路方案优化及关键施工技术[J];施工技术;2012年S1期
8 宋瑞祥,吕俭;浅谈喷锚网护坡的几项关键施工技术[J];路基工程;2000年04期
9 王照宇;王洪涛;;Φ3m超长大直径钻孔灌注桩的关键施工技术[J];四川建筑科学研究;2010年02期
10 孙国润;;海河隧道岸壁保护关键施工技术[J];天津建设科技;2013年03期
相关会议论文 前5条
1 罗楚良;戴明逊;;山东滨州黄河二桥关键施工技术[A];中国公路学会桥梁和结构工程分会2005年全国桥梁学术会议论文集[C];2005年
2 王雄;;郑州黄河二桥主桥关键施工技术[A];科技、工程与经济社会协调发展——中国科协第五届青年学术年会论文集[C];2004年
3 王建林;赵景宇;刘彦兵;;国家体育馆看台座椅送风关键施工技术[A];施工机械化新技术交流会论文集(第九辑)[C];2008年
4 王雄;;郑州黄河二桥主桥关键施工技术[A];科技、工程与经济社会协调发展——河南省第四届青年学术年会论文集(下册)[C];2004年
5 高波;韩俞慧;;保持既有上部结构拆除重做下部结构的关键施工技术[A];中国老教授协会土木建筑(含建筑物改造与病害处理)专业委员会全国第九届建筑物改造与病害处理学术研讨会论文集[C];2011年
相关硕士学位论文 前2条
1 张立博;预应力混凝土梁桥关键施工技术分析与研究[D];湖北工业大学;2017年
2 曹海滨;喜旧溪河大桥关键施工技术及线型控制研究[D];西南交通大学;2002年
,本文编号:2214627
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2214627.html