矮塔斜拉桥施工监控及受力性能若干问题的研究
[Abstract]:The low-pylon cable-stayed bridge is a new type of bridge between ordinary cable-stayed bridge and traditional girder bridge. Its construction process is changeable, stress and linear control is complex, so construction monitoring is needed to ensure construction safety and quality. Das Civil establishes the whole bridge pole system model and simulates the various working conditions during the construction process, thus obtaining the internal forces and deflections of the relevant control sections under different working conditions. A simple calculation formula is given to ensure the uniformity of each strand in the single cable tension of a low-pylon cable-stayed bridge, which is verified by practical monitoring. Aiming at the prominent shear lag effect of a wide-span bridge, a solid model is established by Midas FEA to simulate the working conditions in the construction stage, and the corresponding poles are established. The results show that the transverse prestressing tendon at the diaphragm has little effect on the longitudinal normal stress of the control section, the shear lag effect of the control section caused by concrete placement is not obvious, the longitudinal prestressing tends to cause stress concentration at the measuring point, and the tension of the cable is easy to lead to stress concentration. In the stress monitoring of wide box girder, the solid modeling method should be adopted to obtain the theoretical value of measuring points. As the supporting system of cantilever casting, the hanging basket equipment is closely related to the construction of wide box girder. The results show that the traveling basket used in construction is safe and reasonable. The dynamic and static load test is a direct way to study the mechanical performance of the bridge. This paper makes a load test plan for the bridge and analyzes the test data to further explore. The mechanical performance of the cable-stayed bridge in the background provides a basis for the design rationality and safety of the bridge.
【学位授予单位】:合肥工业大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U445.4
【参考文献】
相关期刊论文 前10条
1 张慧;张玉元;张元海;;单箱双室简支箱梁剪切变形剪力滞效应分析[J];铁道科学与工程学报;2016年12期
2 邢兵;强士中;唐堂;;关于桥梁承载能力评定若干问题的思考[J];中外公路;2015年06期
3 陈丽军;胡宁;李运;文小和;刘璐;;某连续刚构桥0号块局部应力分析[J];公路工程;2015年05期
4 倪文龙;刘凡;贾志强;李雷;;横向预应力对混凝土宽箱梁剪力滞效应影响的有限元分析[J];市政技术;2015年05期
5 蔺鹏臻;方炜彬;杨子江;孙理想;冀伟;;预应力作用下箱梁桥的剪力滞效应研究[J];中国公路学报;2015年05期
6 殷臻;彭爽;余舟;;大跨度连续刚构桥立模标高挂篮变形修正[J];黑龙江交通科技;2013年05期
7 吕长荣;马良;;独塔背索斜拉桥的荷载试验分析[J];华东公路;2012年04期
8 周海俊;吴永昌;谭也平;庄焰;;桥梁荷载试验研究综述[J];中外公路;2008年04期
9 谭红霞;陈政清;;大跨度斜拉桥施工阶段主梁的立模标高研究[J];湖南大学学报(自然科学版);2007年08期
10 陈从春;肖汝诚;;用索梁活载比界定矮塔斜拉桥的方法[J];同济大学学报(自然科学版);2007年06期
相关会议论文 前1条
1 陈从春;肖汝诚;;矮塔斜拉桥几个问题的探讨及发展展望[A];中国公路学会桥梁和结构工程分会2005年全国桥梁学术会议论文集[C];2005年
相关博士学位论文 前2条
1 陈从春;矮塔斜拉桥设计理论核心问题研究[D];同济大学;2006年
2 罗旗帜;基于能量原理的薄壁箱梁剪力滞理论与试验研究[D];湖南大学;2005年
相关硕士学位论文 前10条
1 贾利强;桥梁结构测试技术研究[D];长安大学;2015年
2 禹鹏;桥梁监测中应变测试技术研究[D];重庆交通大学;2014年
3 宋龙龙;桥梁荷载试验校验系数影响因素分析[D];长安大学;2014年
4 孟林;矮塔斜拉桥宽箱梁剪力滞效应分析[D];长安大学;2014年
5 周莹;矮塔斜拉桥施工关键项目的控制分析研究[D];重庆交通大学;2013年
6 刘扬;薄壁箱梁剪力滞效应的研究[D];重庆交通大学;2013年
7 刘建平;薄壁箱梁剪力滞效应分析与研究[D];重庆交通大学;2013年
8 翟磊;钢筋混凝土桥梁荷载试验中的应变测试方法研究[D];重庆交通大学;2013年
9 贾中涛;悬臂施工挂篮空间应力分析[D];东北林业大学;2013年
10 袁卫国;菱形挂篮设计改良与施工技术研究[D];华南理工大学;2012年
,本文编号:2222878
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2222878.html