公路机械化施工动态管理信息化系统研究
[Abstract]:In recent years, highway construction in China has been booming, reaching 130000 km by the end of 2016. In order to ensure the engineering quality, in 2010, the Ministry of Communications put forward the "five modes" of highway construction management: "humanization of development concept, specialization of project management, standardization of engineering construction, informationization of management means, refinement of daily management". In particular, the informationization of management means has developed rapidly in the highway construction in recent years, but the contents of the management information system of the highway construction in various places are very different, and the management projects are not complete. Especially, the dynamic management of construction schedule and construction cost is not well developed. Therefore, the development of practical engineering management information system has a wide range of engineering practical significance. Based on the investigation of the existing management information system and according to the needs of the construction enterprises, this paper develops an information system with the dynamic management function of the construction schedule and cost. First of all, the reasonable selection and configuration of construction machinery for highway asphalt pavement engineering are studied, and the machinery with asphalt mixture mixing station and paver as the main machinery, and other transportation and rolling machinery as the matching cluster, are selected. The model, specification and quantity of the selected machinery are obtained. Secondly, the construction progress and cost budget, project quantity and capital investment management are studied, and the dynamic management mode of construction schedule and cost is determined. Thirdly, based on the software architecture of B / S and database technology, this system is developed by using Visual Studio 2010 with C # language, Win Form,. The system mainly includes system management, construction machinery selection and configuration. The five parts of construction schedule control, construction cost control and system help can realize the dynamic control and mechanical management of the construction schedule and construction cost in the construction process of asphalt concrete pavement.
【学位授予单位】:长安大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U415.1;TP311.52
【参考文献】
相关期刊论文 前10条
1 张海龙;康笠;;高速公路项目施工进度影响因素与控制措施[J];中国建材;2016年08期
2 宋蔓蔓;王凯艳;;图书馆期刊管理系统的设计与实现——以河北金融学院图书馆为例[J];中国市场;2015年26期
3 翁春荣;;数据库构建与管理维护[J];开封教育学院学报;2015年06期
4 郭向东;;现代公路施工质量控制管理研究[J];科技创新与应用;2013年28期
5 蔡学伦;刘晓宇;;钢制光轮静作用压路机与振动压路机的特点[J];中国公路;2013年15期
6 范立军;;对施工机械选择问题的探讨[J];民营科技;2013年05期
7 董海波;;高速公路沥青混凝土路面机械化施工技术与质量控制[J];黑龙江科技信息;2013年05期
8 刘鑫;;施工企业工程项目成本控制分析[J];科技创新与应用;2012年02期
9 杜鹃;;沥青路面机械化施工质量控制[J];交通世界(建养.机械);2011年07期
10 邓小芳;;公路工程施工进度控制[J];交通世界(建养.机械);2011年01期
相关硕士学位论文 前10条
1 赵晓蕾;工程机械应急救援管理系统研究与开发[D];长安大学;2016年
2 汪青;BIM技术在A项目中成本控制管理及数据分析研究[D];华东理工大学;2015年
3 付红霞;公路工程机械化施工成本管理研究[D];河北工业大学;2015年
4 张合川;广南高速公路路面施工质量控制技术研究[D];重庆交通大学;2013年
5 王坤;基于工作流的公路工程施工管理信息系统的设计与实现[D];天津大学;2014年
6 袁光辉;高校科研信息管理系统的设计与实现[D];安徽大学;2013年
7 罗丹婷;高等级沥青路面机械化施工质量管理系统研究[D];长安大学;2010年
8 薛金林;基于Web的施工总承包企业进度管理系统研究[D];武汉理工大学;2010年
9 王睿;沥青混凝土路面机械化施工管理[D];长安大学;2009年
10 徐喜平;基于WEBGIS的公路工程施工管理信息系统的设计与开发[D];长安大学;2007年
,本文编号:2430060
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2430060.html