在役斜拉桥时效风险分析
[Abstract]:During the bridge operation, in addition to bearing all kinds of design loads, it also faces the influence of time-related uncertainties such as environmental erosion, over-designed traffic and overloading vehicles, material aging and so on, which will lead to the gradual degradation of structural resistance. It may further lead to security risks. In the event of an accident, it is possible not only to cause safety losses, but also to bring about significant economic losses. If the bridge disease can be predicted accurately and the maintenance measures can be taken in advance, not only the catastrophic loss can be avoided, but also the major repair and construction will be avoided. This will undoubtedly achieve the best effect in safety and economy. Therefore, it is of great theoretical and practical value to correctly predict the risk status of bridge operation period. This paper studies the time-effect risk of cable-stayed bridge in service from the angle of risk analysis, resistance degradation and so on. The main contents are summarized as follows: 1) the concept of limitation risk and the theoretical framework of limitation risk analysis of cable-stayed bridge in service are put forward, and its basic analysis process is given. 2) based on the analysis of shrinkage, creep and vehicle load, the time-risk probability of cable-stayed bridge in service is studied, and the quantitative and qualitative methods are used to estimate the time-dependent risk loss. 3) put forward the evaluation principle and criterion of the limitation risk evaluation of the cable-stayed bridge in service, and put forward the corresponding measures to deal with the time-effect risk; 4) the aging degradation of steel structural members, cable members and reinforced concrete is studied, and the corresponding theoretical formulas of resistance degradation are deduced. 5) based on the time-dependent risk analysis theory proposed in this paper, the performance of the Sutong Bridge during the normal period of operation is analyzed and predicted, and the variation rule of the time-effect risk of the bridge during the operation period is obtained. At the same time, the control measures should be taken in the corresponding key risk stages.
【学位授予单位】:东南大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:U448.27
【相似文献】
相关期刊论文 前10条
1 赵俊豪;科研计划的风险分析与预测(下)[J];航天工业管理;2000年11期
2 王继光;李补喜;;价值链风险分析及其对策探讨[J];科技与管理;2009年03期
3 徐祖信;郭子中;;二滩水电站泄洪消能布置方案的风险分析[J];河海大学学报;1990年02期
4 周卫红;风险分析在工业安全管理中的应用[J];电力安全技术;2000年03期
5 付军明;巴可伟;屈波;兰志雄;崔艳丽;;高速公路的风险分析与对策研究[J];中外公路;2010年01期
6 吴东辉;;我国输欧盟节日灯串风险分析[J];电子世界;2013年05期
7 彭宝玲;高云涛;潘郁;;我国建筑行业ERP风险分析及实施战略[J];商业时代;2007年22期
8 贺昌海;杨进;;河道截流风险分析概述[J];法制与社会;2008年12期
9 杨旭中;;关于风险分析的几点认识[J];电力勘测设计;2009年01期
10 朱毅麟;航天系统快速风险分析法[J];中国空间科学技术;1993年04期
相关会议论文 前10条
1 刘岩;;原料奶企业的质量风险分析及管控思路[A];第三届中国奶业大会论文集(下册)[C];2012年
2 王晶;张金隆;;建筑行业信息化风险分析[A];第11届海峡两岸信息管理发展策略研讨会论文集[C];2005年
3 杨东升;苗永强;;改进模糊Borda法在风险分析过程中应用研究[A];2012年中国航空学会管理科学分会学术交流会论文集[C];2012年
4 黄崇福;杨军民;庞西磊;;风险分析的主要方法[A];“中国视角的风险分析和危机反应”——中国灾害防御协会风险分析专业委员会第四届年会论文集[C];2010年
5 张骏;姜江;杨克巍;陈英武;;北斗卫星导航系统组网发射方案风险分析[A];中国系统工程学会第十八届学术年会论文集——A12系统科学与系统工程理论在各个领域中的应用研究[C];2014年
6 任鲁川;;区域灾害合成风险分析的原理与方法初探[A];全国突发性地质灾害应急处置与灾害防治技术高级研讨会论文集[C];2010年
7 朱秀军;邢明利;谢小兵;;施工阶段风险分析与防范[A];河南省建筑业行业优秀论文集(2008)[C];2008年
8 ;中国灾害防御协会风险分析专业委员会简介[A];中国灾害防御协会——风险分析专业委员会第一届年会论文集[C];2004年
9 田静;黄崇福;;自然灾害风险分析的形态发生估计方法[A];风险分析和危机反应的创新理论和方法——中国灾害防御协会风险分析专业委员会第五届年会论文集[C];2012年
10 李熠;李桂芬;赵静;;刍议风险分析的基本内容和我国蜂产品安全[A];2007年全国蜂产品市场信息交流会暨中国(桂林)蜂业博览会论文集[C];2007年
相关重要报纸文章 前10条
1 何菁 万军;信贷支持农民购建房的难点和风险分析[N];中国城乡金融报;2013年
2 江苏省常州市国税局 张U,
本文编号:2442551
本文链接:https://www.wllwen.com/kejilunwen/daoluqiaoliang/2442551.html