某型地面电源自动测试系统设计
[Abstract]:A certain type of ground power supply is a part of the ground test and launch control system of a certain rocket. It is used for a certain type of carrier rocket to supply electricity to the onboard electrical system and the single equipment of the ground test during the ground test and to supply the electric detonator to ignite the fire during the launching period. The working condition of the ground power supply is directly related to the test state of the rocket in the whole testing process, so it is very important to test the power source on a single machine during the recovery of the ground power supply. At the same time, the traditional manual test methods used at present have been unable to meet the requirements of high reliability, short period and high degree of automation of carrier rocket testing, so the design of automatic test equipment has become the development trend of modern space technology. The introduction of automatic test system in the testing process has also become one of the standards for designing new equipment. In this paper, an automatic test system for ground power supply is designed, which is used to check the function of ground power supply during the recovery stage, and to confirm whether it meets the requirements of the subsequent launch task. In the hardware part, the STM32F103 chip is used as the control part of the test system. The command module, the sampling module, the man-machine interaction module, the storage module, the alarm part and the power module of the hardware part of the test system are designed. The main program, test flow, A / D conversion program, communication program, LCD display program, SD read and write program, alarm program, interrupt program and other software modules are written in the software part. The sampling data can be optimized in hardware and software to reduce the signal nonlinearity, temperature drift and electromagnetic interference, satisfy the whole test flow of ground power supply, and read and record the sampling data in the testing process. Finally, the basic requirements of the test report are formed. Through the test of the initial equipment of the test system on the ground power supply, the system runs stably, each functional module works normally, and all the test indexes meet the expected design requirements. The existing test data prove that the hardware design of the test system is reasonable. The function of the software is normal and the testing process is completed completely and quickly, which can fully meet the requirements of the automatic testing of the ground power supply.
【学位授予单位】:华东理工大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:V556
【参考文献】
相关期刊论文 前10条
1 浮明军;刘昊昱;董磊超;;智能变电站继电保护装置自动测试系统研究和应用[J];电力系统保护与控制;2015年01期
2 张志文;王文举;;基于ARM的二次直流电源参数测试系统设计[J];国外电子测量技术;2014年11期
3 杨伟;肖义平;;基于STM32F103C8T6单片机的LCD显示系统设计[J];微型机与应用;2014年20期
4 郭荣斌;赵秀才;;自动测试系统的发展趋势[J];国外电子测量技术;2014年06期
5 胡浩;;某型高炮电源测试系统设计[J];国外电子测量技术;2014年03期
6 宋征宇;;新一代航天运输系统测发控技术发展的方向[J];航天控制;2013年04期
7 顾营迎;宁飞;董智萍;李载峰;;空间相机成像配置参数自动测试[J];电子测量与仪器学报;2013年06期
8 丁颖;张建兰;曾渭平;;航空电源测试系统校准与实现[J];工业计量;2013年S1期
9 张蕉蕉;曹森;郭坚毅;苏国华;;基于STM32F103装备数据采集系统的设计[J];装备制造技术;2012年07期
10 颜秋男;胡毅;;STM32F103VB的SD卡在应用编程设计[J];单片机与嵌入式系统应用;2012年02期
相关硕士学位论文 前7条
1 黄婷婷;辅助动力装置仿真测试平台设计与开发[D];华东理工大学;2015年
2 陈淼;LED驱动电源测试系统设计[D];浙江理工大学;2013年
3 丁磊;雷达电源集成测试系统[D];兰州理工大学;2013年
4 徐梦琦;二次电源自动测试系统的设计与实现[D];南京航空航天大学;2012年
5 孙梦宇;基于ARM的电子负载网络监控系统的研究与设计[D];南京航空航天大学;2010年
6 陈永清;移动电源集成测试系统[D];南昌大学;2009年
7 丁宇秋;基于UML技术的雷达电源通用测试软件建模[D];河海大学;2006年
,本文编号:2428153
本文链接:https://www.wllwen.com/kejilunwen/hangkongsky/2428153.html