DL污水处理总承包项目进度管理案例研究
[Abstract]:EPC project contracting mode is a more and more recognized project contracting mode, through a single unit to undertake the design, procurement, construction, commissioning and other all the work. So that the control of project investment, speed up the project progress, improve coordination capabilities and other aspects reflect a greater advantage. But at the same time because of the increase of the scope of work involved in the general contract management and the increase of risks, the project management and coordination work is very difficult for the general contracting unit. How to speed up the progress of the project under the premise of ensuring the quality of the project, and to complete the target of the contract on schedule in the atmosphere of controlling the investment, is the key point of the management and control of the progress of the general contract. This paper takes DL sewage treatment EPC general contract project as a case, through the actual problems and phenomena in the running process of the project, combined with the project management knowledge, studied and analyzed the reason of the progress problem. First of all, from the design, procurement, construction to identify three aspects of the typical problems described, and then combined with the project management theory of contract management, information management, communication management, The planning and control aspects of risk management and schedule management theory are analyzed in depth. Find out where the problem lies, that is, the deviation of the time estimate under the required resources and matching resources when the progress plan is drawn up; the information management and communication management is not in place in the process of plan monitoring; the manpower of the organization is insufficient in the field construction management. The contract execution ability is insufficient, the risk estimate is insufficient and so on. In view of the above problems, this paper puts forward my suggestions from the following aspects: making the progress plan scientifically, improving the mechanism and method of progress monitoring and management, improving the construction management measures, and so on. This case study systematically combs and analyzes the problems existing in the progress of DL sewage treatment general contracting project, and puts forward suggestions and measures for improvement according to project management theory and schedule management theory. The ideas and methods of putting forward, analyzing and solving the problems described in this paper not only provide references for the management of DL sewage projects, but also are worthy of reference for all general contracting projects.
【学位授予单位】:大连理工大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:X703
【相似文献】
相关期刊论文 前10条
1 陈进;;浅谈总承包项目风险识别及防范措施[J];天然气与石油;2009年02期
2 ;2009年成都院29个设计或总承包项目建成投产[J];新世纪水泥导报;2010年02期
3 祁俊尧;;海外总承包项目管理的体会[J];水泥工程;2013年04期
4 陈伯华,张秀东;浅谈以设计为主体石油化工总承包项目的费用控制[J];化工设计;2000年06期
5 马小红;;对总承包项目现场费用控制的认识[J];化学工业;2007年Z1期
6 管培芳;;浅谈总承包项目的调试服务[J];中国水泥;2009年02期
7 梁泳;;三江化工总承包项目的管理与实践[J];中国洗涤用品工业;2009年04期
8 玉建宁;;如何做好总承包项目档案管理工作[J];中国金属通报;2009年34期
9 薛翠萍;赵渊;;总承包项目工程变更的控制与管理[J];包钢科技;2009年06期
10 李伟;;总承包项目管理体会[J];中国石油和化工标准与质量;2011年06期
相关会议论文 前7条
1 吴兴飞;季益祥;;国外总承包项目中设计工作内容及要点[A];建材建设工程优秀论文集[C];2011年
2 徐建荣;;执行国外总承包项目需关注的几个重点和要点[A];建材建设工程优秀论文集[C];2011年
3 单承家;;业主在总承包项目中的管理工作[A];2010年石油石化行业建设工程总承包与项目管理论坛文集[C];2010年
4 朱永明;;P6在总承包项目管理的应用创新[A];2010年石油石化行业建设工程总承包与项目管理论坛文集[C];2010年
5 魏东;;浅谈总承包项目施工管理——总承包方对分承包方的管理[A];建材建设工程优秀论文集[C];2011年
6 李文;杨爱平;;浅谈以设计为龙头的EPC总承包项目管理[A];贵州工程项目管理论文集(2010)[C];2010年
7 万勇;;承接国外工程EPC总承包项目如何规避风险[A];建材建设工程优秀论文集[C];2011年
相关重要报纸文章 前10条
1 沈卫星;论总承包项目的风险管理[N];中国建设报;2004年
2 张见明;中标惠州大炼油常减压总承包项目[N];中国石化报;2006年
3 王士刚;总承包项目管理模式的探索[N];中国建设报;2013年
4 本报记者 董欣;昂起设计龙头 夯实安全基础[N];中国能源报;2014年
5 陈海明邋徐文哲;浙送独立中标国际总承包项目[N];中国电力报;2007年
6 记者 祝福;包钢设计研究总院到国际市场总承包项目获效益[N];内蒙古日报(汉);2008年
7 李明;中一重签首个出口成套产品总承包项目合同[N];中国企业报;2009年
8 苏广宇 记者 贾永杰;一重签订首个成套产品总承包项目合同[N];齐齐哈尔日报;2009年
9 驻安徽记者查健;合肥院海外总承包项目管理水平不断提升[N];中国建材报;2011年
10 孙爽;市场呼唤园林总承包[N];中国花卉报;2004年
相关硕士学位论文 前10条
1 宋海滨;EPC总承包项目内知识转移机理研究[D];北京交通大学;2016年
2 张健;基于CSFs的施工总承包项目沟通管理研究[D];东南大学;2015年
3 李志茹;S公司赞比亚EPC总承包项目货物运输方案设计[D];大连海事大学;2016年
4 仲俊诚;国际电力工程项目总承包的风险管理研究[D];东南大学;2015年
5 陈磊;APC铁鸟台设备总承包项目风险管理研究[D];北京工业大学;2016年
6 张宇;DL污水处理总承包项目进度管理案例研究[D];大连理工大学;2015年
7 祝兆辉;J公司总承包项目风险管理研究[D];大连理工大学;2015年
8 王俊河;华晨总承包项目风险管理研究[D];大连理工大学;2008年
9 贾伟;工程公司总承包项目的费用控制探析[D];西南财经大学;2010年
10 陈鑫;A医院总承包项目协调管理研究[D];华南理工大学;2015年
,本文编号:2192367
本文链接:https://www.wllwen.com/kejilunwen/huanjinggongchenglunwen/2192367.html