【摘要】:近年来随着曲线现浇箱梁桥的大范围应用,加之一些曲梁桥诸如温度、偏心等问题的认识不足以及可能存在的超载,混凝土受拉易开裂的特点致使曲线梁桥的病害大量出现。为此,开展混凝土曲线箱梁桥的病害分析以及维修加固技术的研究是一项十分有意义的工作。 首先,以高赞大桥西引道与纵五线交叉点处,,包括A、B、C、D、E、F、G、H共八条匝道为依托工程,调查该桥梁病害状况,分析产生原因,明确病害产生的机理。 其次,根据依托工程病害状况进行加固设计计算分析,以调整扭矩分配作为桥梁加固的首要目的,运用Midas Civil建立了有限元模型,对加固前后结构的承载能力、刚度及稳定性进行了计算对比分析,形成合理的加固设计方案。 最后,提出了依托工程的加固设计施工方案及关键施工工艺。 总之,通过混凝土曲线箱梁桥的病害分析以及维修加固技术,提出适合曲线箱梁桥的关键加固技术及加固方法,能够为现浇曲线箱梁桥的加固、新建设计及施工提供技术支持和理论基础。
[Abstract]:In recent years, with the wide application of curved cast-in-situ box girder bridges, coupled with some curved girder bridges such as temperature, eccentricity and other problems of understanding and possible overload. The crack of concrete subjected to tension leads to a large number of diseases of curved girder bridge. Therefore, it is very meaningful to study the disease analysis of concrete curved box girder bridge and the technique of maintenance and reinforcement. First of all, based on the eight ramps at the intersection of the West approach Road and the Fifth Longitudinal Route of the Gaozan Bridge, including the eight ramps, the disease situation of the bridge is investigated and the causes are analyzed. Clarify the mechanism of disease. Secondly, according to the condition of the engineering diseases, the finite element model is established by using Midas Civil to calculate and analyze the reinforcement design, and to adjust the torque distribution as the primary purpose of the bridge reinforcement. The load-bearing capacity, stiffness and stability of the structure before and after reinforcement are calculated and analyzed, and a reasonable design scheme is formed. Finally, the reinforcement design and construction scheme and key construction technology are put forward. In a word, through the disease analysis of the concrete curved box girder bridge and the maintenance and strengthening technology, the key reinforcement technology and strengthening method suitable for the curved box girder bridge are put forward, which can be used to strengthen the cast-in-place curved box girder bridge. New design and construction to provide technical support and theoretical basis.
【学位授予单位】:长安大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U445.7
【参考文献】
相关期刊论文 前10条
1 徐艳,郑振飞;非径向支承弯梁桥荷载横向分布的简化计算[J];福州大学学报(自然科学版);2002年05期
2 姜长宇;张元文;邢世玲;;预应力混凝土曲线梁桥设计探讨[J];工程建设与设计;2011年08期
3 张科胜;钢筋混凝土现浇曲梁翼板裂纹的原因分析及防治处理[J];公路;2001年04期
4 程晓东,戴利平,周松国,程莉莎,叶贵如;连续曲线箱梁桥的空间有限元分析及试验研究[J];公路交通科技;2003年03期
5 王钧利;曲线箱梁桥的病害分析及设计对策[J];中外公路;2005年04期
6 周若来;陈卫东;;曲线梁桥常见病害与设计要点[J];中外公路;2008年06期
7 陈铁冰;;混凝土曲线梁桥裂缝成因分析及相应对策[J];建筑管理现代化;2006年03期
8 李海沙;唐怀平;;连续弯箱梁静力特性与曲率半径关系的研究[J];路基工程;2008年03期
9 韩皓;低高度曲线箱梁桥参数分析[J];内蒙古工业大学学报(自然科学版);1998年04期
10 王坤;;连续弯梁桥设计[J];交通世界(运输.车辆);2011年07期
本文编号:1414743
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1414743.html