当前位置:主页 > 科技论文 > 交通工程论文 >

乌鲁木齐市住宅类建设项目交通影响后评价研究

发布时间:2018-04-17 01:39

  本文选题:城市建设项目 + 交通影响评价 ; 参考:《新疆农业大学》2014年硕士论文


【摘要】:本文在收集并仔细阅读交通影响评价及交通影响后评价文献的基础上,分析和总结国内外相关经验,,以国内总体情况及乌鲁木齐市交通影响评价为研究背景,归纳了国内外交通影响后评价的研究现状,阐述了我国主要城市及乌鲁木齐市建设项目交通影响分析所面临的困境,分析了目前交通影响评价存在的问题及不足,指出应在现有交通影响评价的基础上进行交通影响后评价研究的发展需求。 其次,论文中简要而概括地对交通影响后评价相关概念进行了介绍,在分析交通影响后评价与其他评价相关性的基础上,阐述了论文的研究方法、交通影响后评价的内容和技术路线。结合交通影响前评价中的评价指标体系,重点介绍了交通影响后评价中评价指标的选取,运用模糊综合评价法、两两对比法,说明了其理论原理和运用步骤,从交通影响预测性后评价和交通影响改善措施后评价两方面对交通影响后评价进行综合性评价。 最后,本论文以乌鲁木齐市某住宅类建设项目为研究课题,通过现状调查法进行基础数据采集,运用交通影响后评价的方法和评价指标体系,进行交通影响后评价工作,并给出相关结论分析。
[Abstract]:Based on the collection and careful reading of the literature on traffic impact assessment and post-traffic impact assessment, this paper analyzes and summarizes the relevant experiences at home and abroad, taking the overall situation in China and the traffic impact assessment in Urumqi as the research background.This paper summarizes the research status quo of traffic impact post-assessment at home and abroad, expounds the difficulties faced by traffic impact analysis of major cities and Urumqi construction projects, and analyzes the problems and shortcomings of traffic impact assessment at present.It is pointed out that it is necessary to carry out the research on the post-evaluation of traffic impact on the basis of the existing traffic impact assessment.Secondly, the paper briefly and generally introduces the related concepts of the post-evaluation of traffic impact, and on the basis of analyzing the correlation between the post-evaluation of traffic impact and other evaluation, expounds the research methods of the paper.The content and technical route of post-evaluation of traffic impact.Combined with the evaluation index system in the pre-evaluation of traffic impact, the selection of evaluation index in the post-evaluation of traffic impact is introduced emphatically. The fuzzy comprehensive evaluation method and the comparison method are used to explain its theory principle and application steps.A comprehensive evaluation of traffic impact post-evaluation is carried out from two aspects: the post-evaluation of traffic impact predictability and the post-evaluation of traffic impact improvement measures.Finally, this paper takes a residential construction project in Urumqi as the research subject, carries on the basic data collection through the present situation investigation method, uses the traffic impact post-evaluation method and the evaluation index system, carries on the traffic impact post-evaluation work.The related conclusions are analyzed.
【学位授予单位】:新疆农业大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U491

【参考文献】

相关期刊论文 前10条

1 王丽,刘小明,任福田,金永q

本文编号:1761529


资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/1761529.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户56165***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com