兰新二线大梁隧道高地应力软岩大变形控制技术研究
本文选题:隧道工程 + 高地应力 ; 参考:《西南交通大学》2016年硕士论文
【摘要】:高地应力隧道软岩大变形一直是困扰隧道工程界的一个重大难题,在高速铁路、公路不断发展,长大深埋隧道越来越多的今天,这个问题也显得愈加突出。本文以兰新第二双线铁路大梁隧道为依托工程,通过理论分析、数值计算以及现场试验等手段,针对其施工期间出现的高地应力软岩大变形问题,对大变形隧道合理施工工法及有效的控制措施进行研究。论文具体进行了以下几方面工作:1、探讨了软岩大变形的发生机理和类型,着重分析了高地应力软岩隧道挤压性大变形的发生机制、破坏模式及变形特征。结合大梁隧道工程实际,对其高地应力挤压程度进行辨识并进行大变形等级划分,分析其施工中产生大变形的主要原因;2、根据大梁隧道斜井段高地应力软岩大变形的地质状况,建立三维数值模型,运用有限差分计算软件FLAC3D分别对三台阶法、三台阶临时仰拱法、三台阶七步法、CRD法等四种不同施工工法进行了数值模拟,得出了四种工法下隧道拱顶下沉和边墙水平位移发展规律,由数值模拟结果并考虑施工便捷性选取三台阶临时仰拱法作为大梁隧道大变形段首选施工工法;3、提出高地应力软岩隧道大变形控制对策及原则,并重点讨论了了锚杆和超前注浆小导管这两种支护手段在高地应力软岩隧道中的作用。通过FLAC3D对锚杆和超前注浆小导管在大梁隧道中的作用效果进行了数值模拟,得到了采用不同锚杆和超前小导管布设参数对隧道变形的影响。计算结果表明,大梁隧道采用6m-9m长度锚杆比较合理,超前小导管采用拱部140。,长度6m左右可以充分发挥其效果。探讨了新型让压锚杆在大梁隧道中的应用效果;4、通过在大梁隧道大变形段开展现场试验,得到了隧道在采用不同支护参数下的支护变形规律、围岩压力、钢拱架应力变化规律及围岩松动圈深度。现场各项监测结果验证了大梁隧道所采取的控制措施具有显著效果,可以将隧道变形减小30%左右。
[Abstract]:High ground stress tunnel soft rock deformation has been a major problem in tunnel engineering field. With the development of high speed railway and highway and more tunnels, this problem is becoming more and more prominent. In this paper, based on the project of Lanxin No. 2 double-track railway girder tunnel, by means of theoretical analysis, numerical calculation and field test, this paper aims at the problem of large deformation of soft rock with high ground stress during construction. The reasonable construction method and effective control measures of large deformation tunnel are studied. In this paper, the mechanism and types of large deformation of soft rock are discussed, and the mechanism, failure mode and deformation characteristics of extrusion large deformation of soft rock tunnel with high in-situ stress are analyzed. Combined with the actual situation of the large beam tunnel project, the high ground stress extrusion degree is identified and the large deformation grade is classified, and the main causes of the large deformation in the construction are analyzed. 2. According to the geological condition of high ground stress soft rock and large deformation in inclined well section of Daliang Tunnel, a three dimensional numerical model is established, and three step temporary inversion method and three step temporary inverted arch method are used to calculate three steps by using finite difference calculation software FLAC3D, respectively. Four different construction methods, such as three steps and seven steps method and CRD method, are numerically simulated, and the rules of tunnel vault sinking and horizontal displacement of side wall are obtained under the four construction methods. Based on the results of numerical simulation and considering the convenience of construction, three step temporary inverted arch method is selected as the preferred construction method for large deformation section of beam tunnel, and the control countermeasures and principles for large deformation of soft rock tunnel with high ground stress are put forward. The role of anchor rod and lead grouting pipe in soft rock tunnel with high ground stress is discussed. Through FLAC3D, the effect of anchor rod and lead grouting small pipe in beam tunnel is simulated, and the influence of different anchor rod and lead small pipe layout parameters on tunnel deformation is obtained. The calculation results show that it is reasonable to adopt the 6m-9m length anchor rod in the girder tunnel, and the effect can be brought into full play by adopting the arch part 140.and the length about 6m in the leading small pipe. This paper discusses the application effect of new type pressure bearing bolt in large beam tunnel. Through field test in large deformation section of beam tunnel, the supporting deformation law and surrounding rock pressure of tunnel under different supporting parameters are obtained. Stress variation law of steel arch frame and depth of surrounding rock loose circle. The field monitoring results show that the control measures taken by the girder tunnel have remarkable effect, and the deformation of the tunnel can be reduced by about 30%.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:U455.4
【相似文献】
相关期刊论文 前10条
1 李树军;;高地应力大变形隧道变形特性及工程应对措施分析[J];水利与建筑工程学报;2009年03期
2 王水善;;堡镇隧道软岩高地应力地层大变形控制关键技术[J];隧道建设;2009年02期
3 胡文涛;;极高地应力软岩挤压变形特征及支护结构工作性态分析[J];国防交通工程与技术;2012年04期
4 刘高,谌文武,韩文峰,彭恒逸;黄河黑山峡小观音坝址高地应力问题探讨[J];兰州大学学报;2001年03期
5 张群健;;监测技术在堡镇隧道极高地应力段施工的应用[J];铁道建筑;2007年12期
6 张旭;;堡镇隧道高地应力软岩大变形地段施工技术要点及体会[J];山东交通科技;2008年01期
7 韩星俊;;高地应力软岩隧道围岩加固圈合理厚度分析[J];铁道建筑;2008年08期
8 许延波;;高地应力地区大断面隧洞快速掘进施工[J];水利水电施工;2012年04期
9 张群健;;监测技术在堡镇隧道极高地应力段施工的应用[J];隧道建设;2008年02期
10 段少国;;高地应力下TBM转渣系统及其施工技术研究[J];铁道建筑;2009年02期
相关会议论文 前9条
1 吴成刚;何川;李讯;张峰;;高地应力下隧道结构力学的模型试验研究[A];中国土木工程学会第十三届年会暨隧道及地下工程分会第十五届年会论文集[C];2008年
2 祁生文;伍法权;;高地应力地区河谷应力场特征[A];中国科学院地质与地球物理研究所第11届(2011年度)学术年会论文集(中)[C];2012年
3 吴江敏;;高地应力条件下隧道合理洞轴方位及断面形状的研究[A];中国土木工程学会隧道及地下工程学会第八届年会论文集[C];1994年
4 段汝健;胡香伟;;高地应力地区地下洞室施工的几个问题探讨[A];南方十三省(区、市)水力发电学会秘书长会议论文集[C];2010年
5 郭宏海;;硬岩高地应力下的岩爆处理施工[A];中国爆破新技术Ⅱ[C];2008年
6 张丕界;张旭东;王更峰;;高地应力层状围岩隧道大变形控制工程试验研究[A];中国土木工程学会第十五届年会暨隧道及地下工程分会第十七届年会论文集[C];2012年
7 张春生;;高地应力地区大型水电工程中的岩体分区破裂问题及思考[A];新观点新学说学术沙龙文集21:深部岩石工程围岩分区破裂化效应[C];2008年
8 韩常领;;川藏公路二郎山隧道工程勘察设计[A];第一届全国公路科技创新高层论坛论文集公路设计与施工卷[C];2002年
9 杨天俊;;拉西瓦水电站地下硐室岩爆现象典型实例分析[A];西北五省(区)水电学会联系网第20次会议论文集[C];2005年
相关重要报纸文章 前2条
1 龚渝新 蒲森 李国松 何志平;科技攻关创奇迹[N];人民铁道;2008年
2 黄寰 徐治国;加强研究,遏制中国西部地灾[N];地质勘查导报;2007年
相关博士学位论文 前2条
1 陈景涛;高地应力下硬岩本构模型的研究与应用[D];中国科学院研究生院(武汉岩土力学研究所);2006年
2 陈志敏;高地应力软岩隧道围岩压力研究和围岩与支护结构相互作用机理分析[D];兰州交通大学;2012年
相关硕士学位论文 前10条
1 蔡扬;超长深埋隧洞高地应力岩爆的数值模拟预测研究[D];西南交通大学;2015年
2 袁晔;兰新二线大梁隧道高地应力软岩大变形控制技术研究[D];西南交通大学;2016年
3 徐大华;高地应力破碎围岩大变形控制技术研究[D];石家庄铁道大学;2013年
4 贾庆稳;高地应力下山岭隧道的地震破坏分析[D];大连理工大学;2011年
5 肖海波;高地应力区域TBM组装洞室围岩稳定性分析与锚杆参数优化[D];西南交通大学;2010年
6 刘俊鹏;峡口隧道软岩高地应力大变形施工技术研究[D];石家庄铁道大学;2013年
7 邓成语;高地应力炭质千枚岩隧道支护及衬砌结构形式研究[D];石家庄铁道大学;2014年
8 严骏;强震后都汶路特殊高地应力现象与隧道岩爆防治研究[D];成都理工大学;2012年
9 王树洪;高地应力高外水压隧洞围岩稳定和支护结构研究及应用[D];河海大学;2004年
10 刘士海;高地应力软岩隧道施工期时空效应及初期支护选型研究[D];北京交通大学;2015年
,本文编号:2028489