当前位置:主页 > 科技论文 > 交通工程论文 >

松花江CJ3桥梁施工项目质量管理研究

发布时间:2018-08-19 16:59
【摘要】:在拉动内需、加快基础设施建设新政策的引导下,桥梁的建设规模逐渐加大,由于科学技术的进步,工业水平的提高,社会生产力的高速发展,人们对桥梁建设提出了更高的要求。桥梁工程质量既关系到国民经济的发展,又关系到人民群众的切身利益。本文以松花江CJ3桥梁施工项目的质量管理为研究对象,在对国内外质量管理体系分析的基础上,构建了系统的桥梁施工项目的质量管理体系,使其走出目前在管理中的一些误区,在一定程度上有效的提高了桥梁施工项目的使用性能和安全性能,桥梁施工项目质量管理体系的建立对松花江CJ3桥梁施工项目的建设具有重要的现实意义。本文首先对松花江CJ3桥梁施工项目概况进行了介绍,明确了施工的管理机构与进度计划,进而构建了项目质量管理体系。其次,根据本项目质量策划的各类依据,制订了项目质量策划的目标,并对项目的运行拟定了相应的质量规划。再次,结合松花江CJ3桥梁施工项目的特点,构建了完整的桥梁施工项目质量保证体系,从桥梁施工项目质量管理的资源保证、技术保证和制度保证这几方面分别进行了阐述。最后,从建立和完善松花江CJ3桥梁建设项目质量控制机制的角度,分别就施工准备阶段质量控制、施工过程中的质量控制、施工后期质量控制和质量的持续改进控制等方面进行了详解。从而建立了完整的松花江CJ3桥梁施工项目质量管理体系运行的计划、保证、控制措施,进而促进了本桥梁施工项目质量管理体系有效运行。
[Abstract]:Under the guidance of the new policy of stimulating domestic demand and speeding up the construction of infrastructure, the scale of bridge construction has gradually increased. As a result of the progress of science and technology, the improvement of industrial level, and the rapid development of social productive forces, People put forward higher requirements for bridge construction. The quality of bridge engineering is not only related to the development of national economy, but also related to the vital interests of the people. This paper takes the quality management of CJ3 bridge construction project in Songhua River as the research object. Based on the analysis of the quality management system at home and abroad, a systematic quality management system of bridge construction project is constructed. To make it out of some misunderstandings in the current management, to a certain extent effectively improve the bridge construction project performance and safety performance, The establishment of quality management system of bridge construction project is of great practical significance to the construction of Songhua River CJ3 bridge construction project. This paper first introduces the general situation of CJ3 bridge construction project in Songhua River, clarifies the construction management organization and schedule plan, and then constructs the project quality management system. Secondly, according to the various bases of the project quality planning, the goal of the project quality planning is formulated, and the corresponding quality plan is drawn up for the project operation. Thirdly, according to the characteristics of Songhua River CJ3 bridge construction project, a complete quality assurance system of bridge construction project is constructed, which is explained from the aspects of resource assurance, technical guarantee and system guarantee of bridge construction project quality management. Finally, from the point of view of establishing and perfecting the quality control mechanism of Songhua River CJ3 bridge construction project, the quality control in the construction preparation stage and the construction process are discussed respectively. The quality control and continuous improvement control in the later stage of construction are explained in detail. Thus a complete quality management system of Songhua River CJ3 bridge construction project operation plan, guarantee, control measures, and thus promote the effective operation of the bridge construction project quality management system.
【学位授予单位】:哈尔滨工程大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:U445.1

【参考文献】

相关期刊论文 前10条

1 薛志远;;谈建筑施工中的质量管理[J];山西建筑;2013年08期

2 陈颖;;市政道路沥青路面施工质量管理[J];山西建筑;2013年06期

3 周黎罗;;关于加强城市道路工程质量管理的探讨[J];城市建筑;2012年11期

4 张俊祥;;公路工程施工质量管理研究[J];现代商贸工业;2013年04期

5 贺博;;关于加强市政道桥施工质量管理措施探讨[J];中国新技术新产品;2012年24期

6 尹新刚;邱灶松;王晓晶;;拱形钢塔斜拉桥建设项目质量管理技术[J];公路交通科技(应用技术版);2012年12期

7 崔景山;王东;刘飞;杨明;肖宏;;绿色施工“十化”在施工项目管理中的应用[J];施工技术;2012年21期

8 杨阳;;施工现场管理存在的问题及其优化策略[J];鸡西大学学报;2012年01期

9 毛丽娜;董元;;我国公路工程施工质量管理浅析[J];改革与开放;2011年18期

10 张军;;西安绕城北线吕小寨钢桥制作工程质量管理与控制[J];石油化工建设;2010年04期

相关硕士学位论文 前2条

1 孙德国;荣乌高速八段路面工程项目质量管理研究[D];哈尔滨工程大学;2010年

2 熊开兵;福泉高速公路尤树特大桥施工成本风险管理研究[D];南京理工大学;2008年



本文编号:2192271

资料下载
论文发表

本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2192271.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户ce53a***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com