双洞隧道侧穿既有建筑风险分析和方案优化研究
发布时间:2018-10-11 10:30
【摘要】:隧道施工必然会引起地层变形,从而对邻近地表建筑物产生不利影响。以北京地铁9号线军事博物馆站—东钓鱼台站区间隧道近距离侧穿中华世纪坛为工程背景,先进行隧道施工对中华世纪坛影响的风险分析,并提出相应的控制措施;然后采用流固耦合数值分析,研究左线和右线施工顺序、径向注浆、超前小导管注浆和隧道与建筑物位置关系等影响地层变形的关键因素;最后结合施工监测数据,分析隧道侧穿施工引起的地表沉降、中华世纪坛坛体沉降和倾斜以及地下管线沉降的特征。
[Abstract]:Tunnel construction will inevitably cause formation deformation, which will adversely affect the adjacent surface buildings. Based on the engineering background of Beijing Metro Line 9 military Museum Station-DongDiaoyutai Station Tunnel passing through China Century Altar at short distance, the risk analysis of the influence of tunnel construction on China Century Altar is carried out, and the corresponding control measures are put forward. Then by using fluid-solid coupling numerical analysis, the key factors such as the construction sequence of left line and right line, radial grouting, leading small pipe grouting and the relationship between tunnel and building position are studied, and the construction monitoring data are combined. The characteristics of surface settlement, settlement and inclination of China Century Altar altar and settlement of underground pipeline caused by tunnel sideway construction are analyzed.
【作者单位】: 北京中咨正达交通工程科技有限公司;北京交通大学土木建筑工程学院;吉林大学交通学院;
【分类号】:U455.4
[Abstract]:Tunnel construction will inevitably cause formation deformation, which will adversely affect the adjacent surface buildings. Based on the engineering background of Beijing Metro Line 9 military Museum Station-DongDiaoyutai Station Tunnel passing through China Century Altar at short distance, the risk analysis of the influence of tunnel construction on China Century Altar is carried out, and the corresponding control measures are put forward. Then by using fluid-solid coupling numerical analysis, the key factors such as the construction sequence of left line and right line, radial grouting, leading small pipe grouting and the relationship between tunnel and building position are studied, and the construction monitoring data are combined. The characteristics of surface settlement, settlement and inclination of China Century Altar altar and settlement of underground pipeline caused by tunnel sideway construction are analyzed.
【作者单位】: 北京中咨正达交通工程科技有限公司;北京交通大学土木建筑工程学院;吉林大学交通学院;
【分类号】:U455.4
【相似文献】
相关期刊论文 前10条
1 杨俊琴;公路工程投标项目风险分析的人工神经网络模型[J];交通运输系统工程与信息;2003年04期
2 王志征,朱维鹏;某集装箱港口投资项目的蒙特卡洛风险分析[J];集装箱化;2005年03期
3 温胜强;高速公路项目融资风险层次分析模型研究[J];中外公路;2005年03期
4 裴老女;白雪峰;;公路工程承包中的风险分析与防范[J];内蒙古公路与运输;2006年01期
5 殷焕召;刘宏菊;贺红旭;杨卫;;风险评价模式在管道施工中的应用[J];交通标准化;2010年Z1期
6 吴涛;;高速公路可行性研究阶段风险分析[J];工程与建设;2010年05期
7 於健;冯德银;张钢;;船舶海上风险管理浅议[J];青岛远洋船员学院学报;2011年02期
8 张亦飞,沈家法,曹玉泉,徐伟;海塘越浪量风险分析[J];东海海洋;2005年03期
9 华雪峰;公路工程项目风险管理的初步探讨[J];黑龙江交通科技;2005年11期
10 于e,
本文编号:2263865
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2263865.html