长江科学院承担的几江长江大桥北岸隧道锚岩土专项试验圆满完成现场工作
发布时间:2019-01-08 12:45
【摘要】:正长江科学院重庆岩基研究中心承担的几江长江大桥北岸隧道锚岩土专项试验项目,已于2014年11月初圆满完成现场工作。该项目得到了委托单位和设计单位的高度评价。试验过程中多个相关单位到现场参观学习。重庆江津几江大桥位于长江边的千年古城江津,江津是聂荣臻元帅故乡,地处重庆"一小时经济圈"核心区域和成渝经济区的重要承接点,几江大桥是重庆市规划建设"一江两岸"区域性中心大城市以及"双百"现代化大城市的关键性工程。几江大桥全长1 738 m,主跨为600 m的悬索桥,主梁结构采用钢箱梁。大桥
[Abstract]:The pilot project of anchoring rock and soil in the north bank of the Yangtze River Bridge in Chongqing Rock Foundation Research Center of the Yangtze River Academy of Sciences has been successfully completed in early November 2014. The project was highly evaluated by the entrustment unit and the design unit. During the course of the test, many related units visit and study on the spot. The Qijiang Bridge of Jiang Jin in Chongqing is located in the ancient city of Jiang Jin on the edge of the Yangtze River, which is the hometown of Field Marshal Jiang Jin. It is located in the core region of Chongqing's "one hour economic circle" and an important undertaking point in the Chengdu-Chongqing Economic Zone. Jijiang Bridge is a key project for Chongqing's planning and construction of "one River and two sides" regional center city and "double hundred" modernization city. The main span of Jijiang Bridge is 1 738 m and the main span is 600 m. The main girder structure is steel box girder. Bridge
【分类号】:U448.25;U451.5
本文编号:2404616
[Abstract]:The pilot project of anchoring rock and soil in the north bank of the Yangtze River Bridge in Chongqing Rock Foundation Research Center of the Yangtze River Academy of Sciences has been successfully completed in early November 2014. The project was highly evaluated by the entrustment unit and the design unit. During the course of the test, many related units visit and study on the spot. The Qijiang Bridge of Jiang Jin in Chongqing is located in the ancient city of Jiang Jin on the edge of the Yangtze River, which is the hometown of Field Marshal Jiang Jin. It is located in the core region of Chongqing's "one hour economic circle" and an important undertaking point in the Chengdu-Chongqing Economic Zone. Jijiang Bridge is a key project for Chongqing's planning and construction of "one River and two sides" regional center city and "double hundred" modernization city. The main span of Jijiang Bridge is 1 738 m and the main span is 600 m. The main girder structure is steel box girder. Bridge
【分类号】:U448.25;U451.5
【相似文献】
相关重要报纸文章 前7条
1 记者 龙丹梅;今年1100户居民实现一户一表[N];重庆日报;2014年
2 潘艳 周其维 黄豁 新华社专稿;江津:入室劫犯牵出私分国资800万大案[N];新华每日电讯;2004年
3 本报通讯员 王昌旭;守得云开见日出[N];中国气象报;2011年
4 罗文 张亚飞 刘前;江津滨江新城:重庆二环线上的一颗璀璨“明珠”[N];重庆日报;2012年
5 华官林 李俊;江津 协力建设渝西教育高地[N];重庆日报;2009年
6 记者 周雨 特约通讯员 邓绍祥 实习生 周娟美;江津努力打造区域性交通枢纽[N];重庆日报;2006年
7 袁孝春 杨庆宇 王琳琳;江津 滨江新城进入“城熟”新时期[N];重庆日报;2014年
,本文编号:2404616
本文链接:https://www.wllwen.com/kejilunwen/jiaotonggongchenglunwen/2404616.html