【摘要】:针对某些生产系统存在等待时间约束及设备劣化引起产品质量损失这2个问题,构建了系统的缓冲区控制和预防性维护的联合优化模型。首先,利用伽马过程对下游瓶颈工作站的劣化过程进行建模,并考虑由于其状态劣化引起的产品质量损失;其次,在此基础上,将工件的到达、中间缓冲区及下游工作站的加工过程视为一排队系统,引入M/G/1/K排队模型分别求解了在制品(WIP)被阻塞和超出等待时间约束的概率;最后,以最大化系统的"有效产出"为目标,对系统的预防性维护和缓冲区控制作了联合优化。数值实例表明:本文所提模型是切实、有效的,对带等待时间约束的生产系统的缓冲区控制、预防性维护以及产出提高具有一定的指导意义。
[Abstract]:Aiming at the two problems of waiting time constraint and product quality loss caused by equipment deterioration in some production systems, a joint optimization model of buffer control and preventive maintenance is constructed. First, the gamma process is used to model the deterioration process of the downstream bottleneck workstation, and the product quality loss caused by the deterioration of the state of the workstation is considered. Secondly, on this basis, the arrival of the workpiece is carried out. The processing process of intermediate buffer and downstream workstation is regarded as a queueing system. The M/G/1/K queuing model is introduced to solve the probability of (WIP) blocking and exceeding the waiting time respectively. Finally, the goal is to maximize the "effective output" of the system. The preventive maintenance and buffer control of the system are optimized. Numerical examples show that the proposed model is practical and effective, and it has certain guiding significance for buffer control, preventive maintenance and output improvement of production system with waiting time constraints.
【作者单位】: 同济大学机械与能源工程学院;
【基金】:国家自然科学基金(71471135)~~
【分类号】:O226
本文编号:2174062
[Abstract]:Aiming at the two problems of waiting time constraint and product quality loss caused by equipment deterioration in some production systems, a joint optimization model of buffer control and preventive maintenance is constructed. First, the gamma process is used to model the deterioration process of the downstream bottleneck workstation, and the product quality loss caused by the deterioration of the state of the workstation is considered. Secondly, on this basis, the arrival of the workpiece is carried out. The processing process of intermediate buffer and downstream workstation is regarded as a queueing system. The M/G/1/K queuing model is introduced to solve the probability of (WIP) blocking and exceeding the waiting time respectively. Finally, the goal is to maximize the "effective output" of the system. The preventive maintenance and buffer control of the system are optimized. Numerical examples show that the proposed model is practical and effective, and it has certain guiding significance for buffer control, preventive maintenance and output improvement of production system with waiting time constraints.
【作者单位】: 同济大学机械与能源工程学院;
【基金】:国家自然科学基金(71471135)~~
【分类号】:O226
【相似文献】
相关期刊论文 前8条
1 陈绍顺,郭乃林,姜思山;受时间约束的运输问题的表上作业法[J];空军工程大学学报(自然科学版);2002年04期
2 晏湘涛;匡兴华;;基于时间约束的配送网络可行路径算法研究[J];计算机工程与应用;2007年30期
3 李慧芳,范玉顺;时间约束工作流模型的可调度性分析算法[J];计算机集成制造系统-CIMS;2002年07期
4 朱向;雷定猷;游伟;;多阶段带时间约束的变尺寸装箱问题优化研究[J];交通运输系统工程与信息;2013年04期
5 高亮;刘文君;周驰;;用Memetic算法求解有时间约束的TSP问题[J];华中科技大学学报(自然科学版);2008年07期
6 刘思婧;张锦;;一种带时间约束的综合节约算法研究[J];铁道运输与经济;2008年11期
7 王辉;陈红林;;一种改进的基于时间约束的无人机任务分配模型[J];电光与控制;2010年02期
8 张耀辉;;设备劣化规律与设备经济寿命确定的研究[J];技术经济;1992年Z1期
,本文编号:2174062
本文链接:https://www.wllwen.com/kejilunwen/yysx/2174062.html