集装箱中心站“轨道门吊-集卡-正面吊”方案的作业调度优化
[Abstract]:China's railway container transportation is in a vigorous stage of development. The strategic concept of "Belt and Road" brings new opportunities and challenges to the international container transport business. As an important node in the transportation network, the rational scheduling of the internal operational resources of the railway container central station plays an important role in improving the operation efficiency of the central station and ensuring the service level of the whole transportation network. In this context, the optimization research on the dispatching process of railway container central station rail gantry crane, collecting card and front crane equipment is carried out in this paper. The main research contents are as follows: (1) in order to clear the research goal, the function layout and operation flow of container central station are introduced, and the resource allocation of container central station is analyzed. Furthermore, it is determined that the main research object of this paper is the project of "track gantry crane-collecting card-front crane"; In view of the research scheme of this paper, this paper analyzes the links to be optimized in the process of operation, and clarifies the research scope of this paper, that is, three kinds of working equipment around the track door crane, the collecting card and the front crane. The order of operation and the connection between equipments are optimized. (2) in view of the loading and unloading process scheme of "track door hoisting, collecting card and front crane", the difference between the independent loading and unloading operation mode and the mixed loading and unloading operation mode is analyzed at first. Furthermore, it is clear that the research content of this paper is the mixed loading and unloading mode which is more complicated in the operation process. On this basis, taking the operation time interval in the container operation process, the relationship between the operations and the operating equipment as constraints, the scheduling model of "track door hoisting, collecting card and front crane" is established, and the scheduling model is studied under the condition of certain number of equipments. How to minimize the completion time of container loading and unloading task reasonably. (3) the genetic algorithm is designed according to the characteristics of the above model, and the feasibility of the model and algorithm is verified by a practical example. An example is given to solve the optimized job completion time and the usage scheme of the equipment. In order to further verify the optimization effect, the completion time of the operation in the independent loading and unloading mode is solved with reference to the previous research under the condition of constant task quantity, and the results of the operation time under the two modes are compared. The conclusion that the completion time of the mixed loading and unloading mode is better is obtained, and the validity of the model and the algorithm is further proved.
【学位授予单位】:北京交通大学
【学位级别】:硕士
【学位授予年份】:2017
【分类号】:U294.3
【参考文献】
相关期刊论文 前10条
1 孙钦;;关于中欧国际集装箱班列运输组织协同管理的探讨[J];郑铁科技;2016年01期
2 张玲;王涛;;基于能效优化的集装箱码头集卡调度研究[J];物流技术;2015年18期
3 代华凤;程文明;杨武成;;基于eM-plant软件的铁路集装箱中心站装卸线仿真研究[J];交通运输工程与信息学报;2015年03期
4 王海炳;;中小型散杂货码头“散改集”装卸工艺的可行性研究[J];港口装卸;2015年04期
5 刘学武;魏恒州;;集装箱码头铁路装卸线/场总体布置浅析[J];港工技术;2015年04期
6 吕品;乐美龙;;基于作业面的集装箱港口集卡路径及成本优化[J];青岛科技大学学报(自然科学版);2015年03期
7 刘勇;朱晓宁;朱颂雅;王力;康柳江;;铁水联运港站的铁路作业区轨道门吊优化配置[J];武汉理工大学学报(交通科学与工程版);2014年05期
8 王力;朱晓宁;闫伟;谢征宇;;铁路集装箱中心站轨道门吊调度优化模型与算法[J];铁道学报;2014年05期
9 金鑫;叶飞;;铁路集装箱中心站装卸机械配置优化[J];起重运输机械;2013年05期
10 路遥;;浅析铁路集装箱运输发展优点及存在问题[J];科技视界;2013年06期
相关博士学位论文 前7条
1 曾鸣;铁路集装箱中心站物流系统资源调配优化与仿真研究[D];西南交通大学;2015年
2 林炳q;铁路集装箱中心站物流系统建模与优化研究[D];西南交通大学;2014年
3 梁剑;铁路集装箱物流中心站资源配置决策研究[D];西南交通大学;2010年
4 李斌;基于哈佛体系结构的集装箱码头物流系统建模仿真研究[D];武汉理工大学;2009年
5 曾庆成;集装箱码头装卸作业集成调度模型与方法[D];大连海事大学;2008年
6 张煜;面向集装箱码头的仿真技术和优化方法研究[D];武汉理工大学;2007年
7 闫海峰;结点站间铁路集装箱运输组织的理论与方法研究[D];西南交通大学;2004年
相关硕士学位论文 前10条
1 方X;铁路集装箱中心站装卸资源配置研究[D];北京交通大学;2016年
2 王培恒;昆明铁路局集装箱正面吊优化配置研究[D];西南交通大学;2016年
3 朱颂雅;基于列车到发时刻约束的铁路集装箱中心站装卸资源调度优化[D];北京交通大学;2016年
4 冯力源;集装箱港口铁水联运车船直取模式下的作业设备调度优化[D];北京交通大学;2016年
5 张彬;铁路集装箱中心站设施设备能力协调研究[D];北京交通大学;2015年
6 邱建梅;集装箱分散堆放下的码头泊位—集卡—箱区协调调度[D];大连海事大学;2015年
7 张俊霞;“渝新欧”国际铁路对重庆外贸发展的影响研究[D];对外经济贸易大学;2015年
8 杨瑞娜;铁路集装箱中心站系统建模与仿真[D];兰州交通大学;2014年
9 邢曦文;基于混合流水作业组织的集装箱码头装卸集成调度优化[D];大连海事大学;2013年
10 张述能;铁水联运港站集装箱运输组织研究[D];西南交通大学;2013年
,本文编号:2424002
本文链接:https://www.wllwen.com/shekelunwen/ydyl/2424002.html