广州市城区楼宇空中步行连廊项目建设若干问题的研究
[Abstract]:Since 2002, the Guangzhou Planning Bureau has put forward the planning plan of building an aerial walking corridor between buildings in the urban area, and plans to build the corridor in the area of multiple personal flow and commercial concentration in Guangzhou. The Pearl River New City core area and the Xingsheng Road Air Walking Corridor system belong to the first batch of corridor projects implemented in Guangzhou. The summary of management experience is significant to the construction of pedestrian corridor system of other buildings in Guangzhou. This paper takes the Pearl River New Town core area and Xingsheng Road Air Walking Corridor Project as the research blueprint, mainly studies the planning key points of the project, project implementation points, project quality, safety, cost, construction organization and schedule control and future construction and operation, etc. The existing problems and solutions in the process of project construction are analyzed in detail. Through the research and analysis, the project plan accords with the dense development of urban traffic network, ensures the smooth traffic flow of pedestrian, effectively makes the traffic relationship between the major buildings and traffic trunk roads in the core area close, and promotes the connection between the commercial areas. As the project is a pilot project, the introduction of agent management mode is an important means to promote the successful implementation of the project before the Asian Games. At the same time, because the project starts hastily, the early work is not perfect, the project implementation is difficult, the actual construction period is delayed 93 days compared with the contract construction period, the actual construction cost is 6.305 million yuan higher than the planned cost. After the completion of the project, according to the management of municipal facilities maintenance management. First of all, from the planning work, it is necessary to urge the relevant project owners to consider implementing the lap way of the verandah, such as pile position or corbel structure, in the stage of building planning and construction. It is suggested that the planning allow commercial (advertising) to be implanted into the verandah, improve its commercial value, and effectively mobilize the building enthusiasm of the owners. Secondly, in the early stage of construction, the pipeline and underground structure must be explored and the hydropower connection of the corridor should be considered as far as possible in the municipal facilities. Third, in terms of design, various styles of design are adopted to match the appearance of various kinds of buildings. During the construction period, the engineering geological exploration work is completed ahead of time, and the construction drawings are improved before construction. Make clear the structure and construction treatment of the corridor interface and the building. Fourth, in the aspect of construction bidding, we must draw up a reasonable time limit, strictly check the bidding list to prevent leakage, and carry out independent bidding or strict examination of steel subcontract units to ensure the progress and quality requirements. According to the guiding ideology of the municipal government, the pedestrian corridor of urban buildings in Guangzhou will be popularized and implemented in all areas with dense commerce and large flow of people. Through this study, it provides experience and guidance for the construction of air walkway corridors of other buildings in the future.
【学位授予单位】:华南理工大学
【学位级别】:硕士
【学位授予年份】:2010
【分类号】:F284
【参考文献】
相关期刊论文 前10条
1 谭小灵,杨葛飚;道路施工对城市交通影响的分析和对策研究[J];城市道桥与防洪;2005年03期
2 刘振江;;工程进度控制管理[J];黑龙江交通科技;2006年08期
3 孟锦龄;曹海涛;;工程项目管理中进度控制和质量控制的一点认识[J];黑龙江科技信息;2008年15期
4 陈伟军;刘永添;苏艳桃;;带连廊高层建筑连接方式设计研究[J];建筑结构学报;2009年S1期
5 李娣娜;;香港城市空中连廊空间研究初探[J];山西建筑;2008年29期
6 宋彤;漫步中环──谈香港城市公共空间和环境设计[J];建筑学报;1998年09期
7 黄福雄;;建筑工程施工质量控制[J];四川建材;2009年01期
8 顾军,魏东平;钢结构施工中易发生的质量问题及监理对策[J];上海建设科技;1997年05期
9 粟永辉;;建筑工程管理中的“三控制”分析[J];中国新技术新产品;2010年10期
10 韩少辉;;浅析施工阶段的进度控制[J];中国水运(下半月);2008年01期
相关博士学位论文 前1条
1 满庆鹏;建筑施工进度计划建模与控制方法研究[D];哈尔滨工业大学;2008年
相关硕士学位论文 前3条
1 张豪;城市道路行人过街立交设施选址研究[D];西安建筑科技大学;2007年
2 王宝君;城市建设项目交通影响评价若干问题研究[D];西安建筑科技大学;2008年
3 高鹏;建设工程项目进度的监理控制机制及策略[D];山东大学;2009年
,本文编号:2122332
本文链接:https://www.wllwen.com/wenyilunwen/guanggaoshejilunwen/2122332.html