EPC项目总承包商的成本控制研究

发布时间:2018-02-21 18:29

  本文关键词: EPC项目 成本控制 解释结构模型 损失度评价模型 出处:《石家庄铁道大学》2014年硕士论文 论文类型:学位论文


【摘要】:随着工程建设市场的发展,,以设计、采购、施工为一体的EPC承包模式应用逐渐增多。EPC承包模式下多数总承包商关注设计、采购、施工各阶段实际发生的成本,可能导致设计、采购、施工局部费用低,但项目总成本并非最优的情况。基于EPC项目成本控制特点与现状,研究项目成本影响因素的系统识别、评价,并提出相应的成本控制改进措施,对提高总承包商成本管理水平意义重大。 因此,本文在调研目前已实施的EPC项目成本控制的有关资料的基础上,在运用霍尔三维结构分析法对EPC项目成本主要影响因素进行识别基础上,建立EPC项目成本主要影响因素的解释结构模型,确定成本主要影响因素的内在层级关系。其次,基于成本主要影响因素的发生概率和损失度定量确定,构建了所有成本影响主要因素的综合损失度评价模型。接下来,结合某EPC项目实例,进行了成本主要影响因素识别和综合损失度评价,并根据评价结果,提出了相应的总承包商成本控制改进措施,并对部分措施的实施效果进行了分析、验证。 本文构建EPC项目成本主要影响因素综合评价模型,可用于EPC总承包商整体、定量地评价成本影响因素对于总成本带来的不利影响;提出的成本控制改进措施可直接应用于EPC项目总承包商成本控制,有助于总承包商成本管理及项目管理水平的提高。
[Abstract]:With the development of engineering construction market, the application of EPC contracting mode, which integrates design, procurement and construction, is gradually increasing. Under the EPC-contracting mode, most general contractors pay attention to the design, procurement and construction stages of the actual cost, which may lead to the design. Procurement, construction local cost is low, but total project cost is not optimal. Based on the characteristics and status of EPC project cost control, the systematic identification and evaluation of project cost influencing factors are studied, and the corresponding cost control improvement measures are put forward. It is of great significance to improve the cost management level of general contractor. Therefore, on the basis of investigating the relevant data of EPC project cost control which has been implemented at present, this paper uses Hall three-dimensional structure analysis method to identify the main influencing factors of EPC project cost. This paper establishes the explanatory structure model of the main influencing factors of EPC project cost, and determines the internal hierarchical relationship of the main influencing factors of the cost. Secondly, based on the quantitative determination of the probability of occurrence and the loss degree of the main influencing factors of the cost. The comprehensive loss degree evaluation model of all the main cost factors is constructed. Then, combined with a EPC project, the main cost influencing factors are identified and the comprehensive loss degree is evaluated, and according to the evaluation results, The improvement measures of cost control of general contractor are put forward, and the effect of some measures is analyzed and verified. This paper constructs a comprehensive evaluation model of the main influencing factors of EPC project cost, which can be used to evaluate the adverse effect of the cost influencing factors on the total cost of EPC contractor as a whole. The improved cost control measures can be directly applied to the cost control of the general contractor of the EPC project, which is helpful to the improvement of the cost management of the general contractor and the level of the project management.
【学位授予单位】:石家庄铁道大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TU723.3

【参考文献】

相关期刊论文 前10条

1 冷冬;我国对外承包工程业的现状与问题[J];北京统计;2002年03期

2 王子宗;国际工程项目管理模式及其发展趋势[J];中国工程咨询;2003年02期

3 李明;金宇澄;;EPC总承包模式的造价管理[J];国际经济合作;2006年02期

4 王文启;;关于铁路工程建设管理模式与EPC工程总承包的探讨[J];消费导刊;2007年09期

5 焦晋安;杜建军;韩建平;吕军;;浅谈工程总承包(EPC)项目的费用控制[J];甘肃科技;2008年07期

6 郭志勇;邵征西;;浅谈国外EPC铁路项目的成本管理方法[J];安装;2011年12期

7 孟丽萍;;设计阶段影响铁路建筑工程造价的因素分析[J];山西建筑;2009年07期

8 杨立;刘辉;;EPC合同模式下设计阶段的工程造价控制[J];炼油技术与工程;2008年07期

9 文春明;;国际EPC项目难点咋突破[J];施工企业管理;2010年09期

10 段晓晨,张小平;我国铁路工程投资控制存在问题及成因分析[J];铁道建筑技术;2000年05期



本文编号:1522556

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/1522556.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e30ec***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com