燕大西苑项目成本控制前移研究
发布时间:2018-03-30 14:50
本文选题:成本控制前移 切入点:预算管理 出处:《燕山大学》2013年硕士论文
【摘要】:成本控制是房地产开发企业管理中十分重要的工作。房地产开发企业要想在激烈的市场竞争中立于不败之地,,取得良好的经济效益,就必须十分重视成本控制工作,切实提高成本管理水平。工程项目成本管理就是在保证工程质量、工期等方面满足合同要求的前提下,对项目实际发生的费用支出采取一系列预防和控制措施,把项目的开发成本控制在计划成本规定的范围内,以保证成本控制目标的实现。 本论文结合燕大西苑案例,从规划及施工图设计阶段的成本控制,施工图造价过程中的成本控制,招投标过程中的成本控制和项目施工过程中的成本控制四个主要方面对成本控制理论进行分析,制定出尚未有人明确提出的成本控制前移理论。其中,基于成本控制的规划及施工图设计研究和基于成本控制的跟踪审计方法研究具有一定创新特色。 本文主要采用文献分析方法,规范性理论分析方法,案例研究法,调查研究法等方式,结合在攻读硕士学位过程中所学的有关理论知识,对燕大西苑项目成本控制过程中的有关数据进行深入分析,总结制定出切实可操作的房地产项目成本控制前移方案。 本文最后通过树立成本控制理念,建立基于成本控制的组织机构设置和人员安排,完善成本控制流程,制度化保障措施和成本控制责任化管理五个方面措施来保障成本控制方案得以实现。本文有针对性地解决公司实际发生的问题,具有很好的现实意义。
[Abstract]:Cost control is a very important work in the management of real estate development enterprises.If real estate development enterprises want to be invincible in the fierce market competition and obtain good economic benefits, they must attach great importance to cost control and improve the level of cost management.The project cost management is to take a series of prevention and control measures to the actual cost expenditure of the project on the premise of ensuring the quality of the project and meeting the requirements of the contract.Control the development cost of the project within the scope of the planned cost to ensure the realization of the cost control goal.This paper combined with the case of Yanda Xiyuan, from the planning and construction drawing design stage of cost control, construction drawing cost process of cost control,This paper analyzes the cost control theory in the process of bidding and bidding and the cost control in the construction process of the project, and formulates the forward theory of cost control which has not been clearly put forward by anyone.Among them, the research of cost control based planning and construction drawing design and the research of tracking audit method based on cost control have some innovative characteristics.This paper mainly adopts the methods of literature analysis, normative theoretical analysis, case study, investigation and research, and combines the relevant theoretical knowledge learned in the course of studying for a master's degree.This paper makes a thorough analysis of the relevant data in the process of cost control of Yanda Xiyuan project, and summarizes and formulates a practical and operable scheme for the cost control and forward shift of the real estate project.Finally, through establishing the concept of cost control, establishing the organization setup and personnel arrangement based on cost control, the cost control process is improved.Institutional safeguard measures and cost control responsibility management measures to ensure the implementation of five aspects of cost control program.This article has the very good practical significance to solve the actual problems of the company.
【学位授予单位】:燕山大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F272;F299.23
【参考文献】
相关期刊论文 前2条
1 是建明;;工程项目效益预测分析及财务管理方法探讨[J];建筑施工;2008年04期
2 何彦兵;高帅;;如何有效地进行建筑工程成本控制[J];科技风;2009年18期
相关硕士学位论文 前1条
1 徐良德;基于模糊理论的建设项目投资估算影响因素研究[D];西华大学;2010年
本文编号:1686400
本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/1686400.html