当前位置:主页 > 管理论文 > 成本管理论文 >

蟠龙采油厂间歇抽油节能项目设计阶段的成本管理研究

发布时间:2018-04-11 23:07

  本文选题:间歇抽油节能项目 + 成本管理 ; 参考:《西安石油大学》2014年硕士论文


【摘要】:在竞争日益激烈的国际环境下,蟠龙采油厂只有结合国内外环境的变化迅速对成本管理的方法做出相应的调整,台理有效地降低成本,才能立于不败之地。对于大量的低压、低渗、低产油井,通过间歇抽油来提高油井经济效益是一种有效方法。通过调查研究及实践观察到蟠龙采油厂间歇抽油成本控制方面存在很多不足:间歇抽油成本概念意识薄弱,间歇抽油成本管理水平粗放没有形成体系,先进的技术没有得到合理利用,本文正是针对种种问题研究最适宜蟠龙采油厂间歇抽油节能项目设计阶段成本管理的解决方案。 本文以蟠龙油厂间歇抽油节能项目为研究对象,运用成本管理及控制方法相关理论,针对蟠龙油厂问歇抽油节能项目成本管理方面存在的问题展开研究,通过客观分析间歇抽油节能项目节能模式,成本构成,影响成本的因素、项目设计阶段成本管理现状,通过深入剖析,提出蟠龙采油厂间歇抽油节能项目设计阶段成本管理对策,并给出了蟠龙采油厂间歇抽油节能项目设计阶段成本管理实施保障的建议。意在寻求更为科学有效的间歇抽油节能项目设计阶段成本控制保障机制和管理体系,为蟠龙采油厂成本控制、提升管理能力和可持续发展能力奠定了理论与实践相结合的基础。
[Abstract]:In the increasingly competitive international environment, the Panlong Oil production Plant can be invincible only by making corresponding adjustments to the cost management method in combination with the changes in the domestic and foreign environment, so as to effectively reduce the cost.For a large number of oil wells with low pressure, low permeability and low production, it is an effective method to improve the economic benefits of wells by intermittent pumping.Through investigation and practice, it is found that there are many deficiencies in the cost control of intermittent pumping in Panlong Oil production Plant: the concept of intermittent pumping cost is weak, and the management level of intermittent pumping cost is not systematic.The advanced technology has not been used reasonably. This paper is the most suitable solution for the cost management in the design stage of the intermittent oil extraction and energy saving project in Panlong oil extraction plant.This paper takes the intermittent pumping energy saving project of Panlong Oil Plant as the research object, applies the relevant theories of cost management and control methods, and studies the problems existing in the cost management of Panlong oil plant's energy saving project.Through the objective analysis of the energy saving mode, the cost structure, the factors affecting the cost, the current situation of the cost management in the project design stage,The cost management countermeasures in the design stage of intermittent oil extraction and energy saving project in Panlong oil extraction plant are put forward, and the suggestion of cost management and guarantee in the design phase of intermittent pumping energy saving project in Panlong oil extraction plant is given.The purpose of this paper is to seek a more scientific and effective mechanism and management system for cost control and management in the design stage of intermittent pumping energy saving project, which lays a foundation for the combination of theory and practice for the cost control of Panlong Oil production Plant and the promotion of management ability and sustainable development ability.
【学位授予单位】:西安石油大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:TE322

【参考文献】

相关期刊论文 前9条

1 卢文初;;建筑工程设计阶段成本管理再探析[J];中国城市经济;2011年14期

2 戴立新;李宗;杨健;;电力建设项目设计阶段成本控制问题与对策研究[J];中国管理信息化;2011年03期

3 朱松阳;;挣值分析法在工程项目管理当中的应用[J];科技创新与应用;2013年28期

4 祝亚军;雷舰;;基于目标—作业成本管理理论的成本管理体系研究[J];经济研究导刊;2010年18期

5 雷舰;;目标—作业成本管理集合模式研究[J];会计之友(中旬刊);2010年07期

6 张丽娜;;基于目标成本的成本控制研究[J];内蒙古农业大学学报(社会科学版);2011年01期

7 潘美玲;冯光伟;;浅谈价值工程在工程建设中的应用[J];黑龙江科技信息;2013年06期

8 王晓丽;贾云龙;李文斌;田昌奇;;基于挣值分析的施工项目物资成本控制[J];价值工程;2011年04期

9 马广华;;浅议作业成本法在我国企业应用的必要性与可行性[J];生产力研究;2009年18期

相关博士学位论文 前2条

1 蔡军;产品设计阶段的成本管理研究[D];中南大学;2012年

2 齐建民;基于可持续发展的石油企业战略成本管理研究[D];天津大学;2012年



本文编号:1738062

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/1738062.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户d7d7f***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com