当前位置:主页 > 管理论文 > 成本管理论文 >

BT模式下工程施工企业的合同与建设管理

发布时间:2018-07-23 13:11
【摘要】:21世纪以来,我国政府针对国内基础设施建设和投资体系改革的需要,鼓励社会资本通过BT、BOT模式参与建设投资,工程施工企业作为基础设施建设的主力,积极拓展了经营业务板块,,以BT模式参与各地基础设施投资建设。但至今国内尚没有统一的BT模式项目合同标准和建设规范。多数工程施工企业在BT模式下的项目投资建设中遇到诸多合同与建设管理的瓶颈问题,导致项目投资失败、产生合同纠纷,失去了相应市场。 本文把BT模式下工程施工企业对工程项目的合同与建设“三控”管理的重点环节作为研究对象,包括对BT项目建设市场分析与选择;BT项目的合同管理;项目质量、进度、成本控制管理的要点进行分析研究。运用管理、经济学和合同管理理论的相关知识,结合实际案例对研究的问题进行分析、归纳。通过对工程施工企业在BT模式下项目管理实践中,合同的结构内容设计、履约管理难点以及项目质量、进度、成本管理薄弱环节的剖析,提出了相应的解决措施,研究出针对这些问题的管理方法。为工程施工企业参与BT项目建设运作管理提供参考,同时能够在当前国内理论界对投资人(施工企业)角度的BT模式理论研究缺乏、管理规范空白的情形下,推进行业内投资人对BT模式下建设项目管理进行系统研究。
[Abstract]:Since the 21st century, the Chinese government has encouraged the social capital to participate in the construction investment through BTO bot model, aiming at the needs of the domestic infrastructure construction and investment system reform, and the engineering construction enterprises as the main force of the infrastructure construction. Actively expand the business sector, BT model to participate in infrastructure investment and construction. But up to now, there is no uniform BT model project contract standard and construction standard. Most construction enterprises encounter many bottleneck problems of contract and construction management in the project investment and construction under BT mode, which lead to project investment failure, contract disputes and loss of corresponding market. In this paper, the key links of "three control" management of contract and construction in construction enterprises under BT mode are taken as the research object, including the market analysis and selection of BT project contract management, project quality, progress, and so on. The main points of cost control management are analyzed and studied. Using the relevant knowledge of management, economics and contract management theory, combined with practical cases to analyze and summarize the problems. Based on the analysis of the structural content design, performance management difficulties and the weak links of project quality, schedule and cost management in the project management practice of engineering construction enterprises under BT mode, the corresponding solutions are put forward. The management methods for these problems are studied. It provides a reference for engineering construction enterprises to participate in BT project construction operation management, at the same time, in the current domestic theoretical circle of investors (construction enterprises) perspective of BT mode theory research is lacking, management norms are blank, Promote the industry investors to BT mode construction project management system research.
【学位授予单位】:武汉工程大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TU723.1

【参考文献】

相关期刊论文 前10条

1 严玲;赵华;杨苓刚;;BT建设模式下回购总价的确定及控制策略研究[J];财经问题研究;2009年12期

2 刘应宗;周晓丽;;运用BT模式进行城市轨道交通建设[J];重庆交通大学学报(社会科学版);2007年03期

3 旷开萃;;政府视角下的BOT项目实施研究[J];重庆建筑;2011年06期

4 谢明辉;吕秉虹;;BT模式建设保障性住房之律师实务探析[J];法治研究;2011年08期

5 费磊;;国有建筑施工企业人力资源培训与开发的探索[J];经营管理者;2011年11期

6 翟文生;;浅谈项目管理中的进度控制[J];工业设计;2011年07期

7 徐恒升;施工项目成本控制中的问题与对策[J];基建优化;2004年06期

8 钟炜;王博;;BT项目回购阶段业主方回购价款确定分析[J];建筑经济;2010年09期

9 周凤荣;;BT模式投资项目的招标合同筹划[J];建筑市场与招标投标;2008年03期

10 邓丽琼;;建设项目管理中工程的进度控制[J];科技信息(学术研究);2008年06期



本文编号:2139517

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/2139517.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户03f9b***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com