清河再生水厂二期工程项目施工成本控制研究
[Abstract]:The construction industry is the pillar industry of China's economy and occupies an important position in the national economy. With the rapid development of the economy, the construction industry is also experiencing rapid development. At the same time, the construction industry waste of resources, low cost control efficiency, high material costs, rising labor costs and other issues emerge in an endless stream, project construction cost control process, methods, measures and other aspects of a large number of shortcomings and loopholes. As far as the enterprise is concerned, the benefit is an important factor to decide its survival, and the cost is the key factor to decide the benefit, so is the construction enterprise [1].With the rapid development of the economy, the market competition has become very fierce, the construction industry is no exception, and the market competition in the industry has become increasingly fierce. The cost control of project construction, an important part of project construction management, plays a vital role in the survival and death of the enterprise. The quality of cost management directly affects the economic benefits of the unit. People pay more and more attention to it, and people in the industry are more and more aware of the importance of project construction cost control [2]. This paper takes the second phase of Qinghe Recycling Water Plant as the research object, and studies the cost control in the construction phase. Through the in-depth analysis of the construction cost control of the first phase of the project, it finds out the shortcomings and defects in the construction cost control of the Qinghe Recycling Water Plant project, and will summarize them. On the basis of combining the experience with the characteristics of the second-phase project, the construction cost control work of the second-phase project should be done well. The construction cost control of the project is studied, and the improvement measures are put forward for the construction cost control of the second phase project of Qinghe Recycling Water Plant of Beijing Equipment and Installation Engineering Group Co., Ltd. to improve the construction cost management efficiency, save cost, reduce waste and improve the company's efficiency.
【学位授予单位】:吉林大学
【学位级别】:硕士
【学位授予年份】:2016
【分类号】:TU991.57;TU723.3
【相似文献】
相关期刊论文 前10条
1 席宏涛;;浅论工程施工成本控制[J];黑龙江科技信息;2009年12期
2 杨培强;陈杰;;浅谈项目施工成本控制[J];科技信息;2009年11期
3 王文田;;施工成本控制的原则和方法[J];河北水利;2009年06期
4 徐晓枫;;浅谈建筑施工成本控制[J];科技传播;2010年06期
5 王文明;;青城小区项目施工成本控制研究[J];消费导刊;2010年04期
6 王增先;;浅论施工成本控制[J];山西科技;2010年03期
7 李剑姝;;油田企业施工成本控制存在的问题及对策[J];中国科技信息;2010年16期
8 史小红;;建筑项目施工成本控制要点浅析[J];中国市场;2011年15期
9 李尚丽;;项目施工成本控制的过程和方法[J];山西建筑;2011年21期
10 邓文静;;浅述建筑施工成本控制[J];科技资讯;2011年17期
相关会议论文 前4条
1 黄雪玫;;浅谈施工成本控制的措施[A];河南省土木建筑学会2010年学术研讨会论文集[C];2010年
2 刘德勋;潘新周;杨胜强;;水利水电工程施工成本控制的探讨[A];贵州省岩石力学与工程学会2008年学术年会论文集[C];2008年
3 刘超;;水利水电工程施工成本控制[A];中国水利学会2008学术年会论文集(上册)[C];2008年
4 闫华显;迁保昌;李岐;;浅谈工程项目的施工成本控制[A];全国城市公路学会第十五届(2006)学术年会论文集[C];2006年
相关重要报纸文章 前3条
1 山西省介休市城建局行政综合执法大队 刘令前;论建筑工程管理中施工成本控制[N];科学导报;2013年
2 李春成;施工成本控制程序与要点[N];石油管道报;2006年
3 杨松;浅谈结构施工成本控制的几点技巧[N];中华建筑报;2009年
相关硕士学位论文 前10条
1 马梦娜;施工成本控制精细化管理体系的构建研究[D];长安大学;2015年
2 王成成;基于本体的铁路工程施工成本控制知识管理研究[D];西安建筑科技大学;2015年
3 张进国;管道工程施工成本控制研究[D];北京化工大学;2015年
4 秦政红;H公司非洲X公路项目施工成本控制研究[D];长春理工大学;2015年
5 熊晋;DN公路施工成本控制分析[D];广西师范大学;2015年
6 李强;基于BIM技术全寿命周期成本控制研究[D];武汉工程大学;2015年
7 马婧;朱莱玻璃项目施工成本控制研究[D];燕山大学;2015年
8 谢士叶;风力发电项目施工成本控制[D];山东大学;2016年
9 刘莉;基于知识本体的高铁项目施工成本控制研究[D];西安建筑科技大学;2016年
10 成昱亭;M集团未来城项目施工成本控制改进研究[D];湖南大学;2016年
,本文编号:2236412
本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/2236412.html