朔州至准格尔铁路综合电气化工程项目管理应用研究
[Abstract]:Modern engineering project is a complex and open dynamic system with large scale, many participants, high technical requirements, many interference factors, and the difficulty of planning implementation is the main problem we consider. There are three main items in project management of integrated electrification engineering, which are short construction period, good quality and less investment. This paper takes the project process of Shuozhou-Zhunger Railway Integrated electrification Project as the main line, combines the corresponding project management methods, such as constraint theory, total quality management theory, key line, Gantt chart, etc., and plans its schedule in turn. And the quality, safety, cost and other aspects, specific analysis, put forward countermeasures. Set up the guarantee system of organization structure, quality, safety and so on, use single code name network path and Gantt chart to find out the key path, and provide reference and basis for similar engineering project. This paper is divided into five parts. The first chapter is the introduction, which mainly describes the research background, research significance, the source of the paper, the innovation of the subject, the main contents and objectives of the research. At the same time, it expounds the research situation and main theories, mainly describes the project schedule management, the related research evolution process of quality management, and the methodology involved in the article, such as constraint theory, total quality management theory, Gantt chart, etc. Key lines and other specific application methods. The second chapter is the general situation of Shuozhou-Zhunger Railway Integrated electrification Project. It analyzes the general situation of the project, the main engineering quantity and the characteristics of the project. At the same time, it expounds the structure of the project organization frame, which lays the foundation for the project management. Chapter 3, 4 and 5 is the key point of the project management of Shuozhou to Zhunger Railway Integrated electrification Project. It is expounded in detail from three aspects of schedule management, quality management and cost management, analyzes the progress plan, finds out the reasonable key route, and makes the Gantt chart. The quality and safety are analyzed, the effective system of quality assurance is set up, the project management is carried out, and the guarantee measures in practice are given.
【学位授予单位】:西南交通大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:U227
【参考文献】
相关期刊论文 前10条
1 杨建华,谢珍,习应祥;PERT网络时间-费用优化数学模型及程序实现[J];长沙交通学院学报;1999年01期
2 乔非,沈荣芳,吴启迪;系统理论、系统方法、系统工程——发展与展望[J];系统工程;1996年05期
3 张儒忠;浅谈工程建设项目的投资、工期、质量及其关系[J];广东水利水电;2002年05期
4 张晓伟;施工工期、工程质量和投资成本之间的关系[J];安阳师专学报;1999年02期
5 许劲;任玉珑;;总承包体制下项目质量管理研究[J];科技管理研究;2007年04期
6 刘士新,王梦光,唐加福;资源受限工程调度问题的优化方法综述[J];控制与决策;2001年S1期
7 李丽;;我国工程项目进度管理研究综述[J];科学之友;2011年02期
8 宋建磊;;电力施工工程中的项目管理[J];建材技术与应用;2009年09期
9 王健;单代号时标网络计划在工期—费用优化中的应用[J];油气田地面工程;2000年04期
10 蔡晨,万伟;基于PERT/CPM的关键链管理[J];中国管理科学;2003年06期
相关硕士学位论文 前7条
1 刘鸿洋;项目管理方法在XY公司STT电力工程项目中的应用研究[D];华中科技大学;2010年
2 邱进冬;企业项目管理中的MC方法与技术研究[D];浙江大学;2003年
3 仲家骅;项目管理理论方法及应用[D];天津大学;2006年
4 刘波;中国移动江苏公司综合结算系统建设项目质量管理研究[D];南京理工大学;2007年
5 杨韶雄;广州植之元南沙油脂加工项目管理实施研究[D];西南交通大学;2009年
6 包飞;关键链方法在太湖船闸项目进度计划中的应用研究[D];苏州大学;2010年
7 苟旭;基于设计结构矩阵的高速公路工程项目进度计划研究[D];华中科技大学;2009年
,本文编号:2370138
本文链接:https://www.wllwen.com/guanlilunwen/chengbenguanlilunwen/2370138.html