浮动工时考核法
发布时间:2018-10-30 14:51
【摘要】:正受金融市场浮动利率制、外汇市场浮动汇率制的启迪,运用统计学中的统计检验理论,让工时考核线浮动变化,浮动工时考核方法应运而生。它的研究为工时绩效考核管理开创了一种全新的模式。一、浮动工时考核法产生的背景2016年秦航公司计划产品品种增加,计划产量比往年猛增60%。年初,为保证全年生产任务的完成,管理层决定制定新的考核标准。首先根据2016年产品产量,预估年度工时总量(全体工人12个月完成工时之和)和生产工人年平均人数(12个月,平均每月工人
[Abstract]:Inspired by the floating interest rate system in financial market and floating exchange rate system in foreign exchange market, the floating man-hour assessment method emerges as the times require. Its research has created a new mode for man-hour performance appraisal management. The background of floating man-hour assessment method in 2016 Qinhang Company plans to increase the variety of products and plan to increase production by 60 percent over previous years. At the beginning of the year, in order to ensure the completion of production tasks throughout the year, management decided to establish a new assessment standard. First of all, based on the production of 2016 products, the total annual working hours (the sum of 12 months of work completed by all workers) and the average number of workers per year (12 months, average monthly workers) are estimated.
【作者单位】: 中航工业西安飞机工业(集团)有限责任公司;
【分类号】:F272.92
本文编号:2300308
[Abstract]:Inspired by the floating interest rate system in financial market and floating exchange rate system in foreign exchange market, the floating man-hour assessment method emerges as the times require. Its research has created a new mode for man-hour performance appraisal management. The background of floating man-hour assessment method in 2016 Qinhang Company plans to increase the variety of products and plan to increase production by 60 percent over previous years. At the beginning of the year, in order to ensure the completion of production tasks throughout the year, management decided to establish a new assessment standard. First of all, based on the production of 2016 products, the total annual working hours (the sum of 12 months of work completed by all workers) and the average number of workers per year (12 months, average monthly workers) are estimated.
【作者单位】: 中航工业西安飞机工业(集团)有限责任公司;
【分类号】:F272.92
【相似文献】
相关期刊论文 前10条
1 顾振光;数学模型用于经济责任制—一介绍利改税系数考核法[J];企业管理;1986年09期
2 臧志彭;解学芳;;360度考核法——一个精巧的谎言[J];科技创业月刊;2005年12期
3 郭凌云;;浅谈360度考核法在企业应用中的优缺点[J];经营管理者;2013年08期
4 姚层林;;关键指标考核法在汽车销售企业的应用分析[J];中小企业管理与科技(下旬刊);2012年01期
5 朱志伟;营销销利考核法[J];企业管理;1999年01期
6 张建军;商文斌;习海蓉;;浅析360度考核法在湖北玉立公司中的应用[J];中国商贸;2013年01期
7 姜农娟;赖磊;;正确应用强制分布考核法[J];中国人才;2006年13期
8 苗玉军,杨云飞;小议纯差异考核法的应用方式[J];中国乡镇企业会计;2000年08期
9 鞠强;消除考核的难点──排序考核法[J];企业管理;2000年10期
10 龚建荣;;360度考核法在独立学院教师绩效考核中的运用[J];考试周刊;2011年11期
相关重要报纸文章 前1条
1 孙敏 通讯员 姚海东;变考核结果为考核过程[N];中国石油报;2004年
相关硕士学位论文 前1条
1 谭红阳;360度绩效考核法在企业中的应用研究[D];成都理工大学;2013年
,本文编号:2300308
本文链接:https://www.wllwen.com/guanlilunwen/jixiaoguanli/2300308.html