满城县新农村电气化工程技术经济评价
发布时间:2018-01-20 23:32
本文关键词: 农村电气化 电网 模糊层次分析法 出处:《华北电力大学》2013年硕士论文 论文类型:学位论文
【摘要】:随着我国经济的不断的繁荣,对基础设施的要求也在不断的提高,电网是基础设施的一个重要组成部分,然而农村电气化工程项目由于一些因素的影响始终没有得到足够重视。为建立满城县安全可靠的供电网络,以保证满城县经济持续健康高速发展,对陈旧的电网设施加大重视度,强调了电气化工程建设的必要性;村用电量的不断加大,与现存的农村电网设施落后破旧的现实之间的矛盾更加的突出,更加突出了电气化工程项目的重要地位。新农村的电气化建设对满城县新农村的经济繁荣发展有着举足轻重的深远意义,由于一些驱动因素始终没有得到足够重视,满城县新农村电气化建设工程项目的经济技术评价工作发展仍然不足,要做好经济性评价工作,应该可以加强满城县的电网建设项目的管理,构建科学合理的项目经济评价体系,提高工程项目的可靠性,降低管理风险,提高项目效益。 本文就是在农村电气化发展的现实状况为基础上,剖析了满城县新农村电气化工程建设的目标具体要求,以及在发展具体规划的指导下,提出了电气化建设的指标体系,并以层次分析法和模糊综合评价方法结合起来,,该评价方法能够很好地对满城县工程项目中的问题,用定性与定量相结合的方法进行分析,最后通过对满城县电气化工程建设进行经济技术分析,并通过建立评价指标体系,运用模糊层次分析方法对该县进行评价,通过对评价结果的分析,找出满城县电气化工程项目的问题所在,并提出切实的发展建议。
[Abstract]:With the economic prosperity of our country, the demand for infrastructure is also increasing, and the power grid is an important part of infrastructure. However, the rural electrification project has not been paid enough attention to because of some factors. In order to establish a safe and reliable power supply network in Mancheng County, to ensure the sustained and healthy economic development of Mancheng County. Pay more attention to the old power grid facilities and emphasize the necessity of electrification engineering construction; With the increasing of village electricity consumption, the contradiction between the existing rural power grid facilities and the reality of backward and dilapidated is more prominent. The electrification construction of the new countryside is of great significance to the economic prosperity and development of the new countryside in Mancheng County. Because some driving factors have not been paid enough attention to all the time, the economic and technical evaluation of the new rural electrification construction project in Mancheng County is still insufficient, so the economic evaluation should be done well. It should be able to strengthen the management of power grid construction projects in Mancheng County, construct a scientific and reasonable project economic evaluation system, improve the reliability of engineering projects, reduce the risk of management, and improve project benefits. Based on the reality of rural electrification development, this paper analyzes the specific requirements of the construction of the new rural electrification project in Mancheng County, and under the guidance of the specific development plan. This paper puts forward the index system of electrification construction, and combines AHP with fuzzy comprehensive evaluation method. The evaluation method can well solve the problems in the project of Mancheng County. Finally, through the economic and technical analysis of the construction of electrification project in Mancheng County, and through the establishment of evaluation index system. Through the analysis of the evaluation results, the problems of the electrification project in Mancheng County are found out, and practical development suggestions are put forward.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 邵宏;;浅谈电网规划的经济评价[J];电力学报;2005年04期
2 林积武;;农网改造10kV配电变压器的安装[J];电力安全技术;2006年11期
3 卞勇;;新农村电网安全管理的难点与对策[J];电力安全技术;2009年12期
4 朱海峰,程浩忠,张焰,侯志俭;电网灵活规划的研究进展[J];电力系统自动化;1999年17期
5 郭蕾;农村电网改造中的几项技术措施[J];电气时代;2000年05期
6 吴潮辉;城市配电网规划探讨[J];广东电力;2002年04期
7 张双萍;;浅谈电网建设项目经济评价的编制[J];广西电业;2006年09期
8 欧伟;;新农村呼唤农电服务水平新提升[J];供电企业管理;2006年04期
9 高赐威,程浩忠;电力市场环境下电网规划的若干问题研究[J];华东电力;2005年03期
10 王吉权;赵玉林;;电网规划的研究方法及特点[J];农村电气化;2006年02期
本文编号:1449762
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1449762.html