当前位置:主页 > 管理论文 > 生产管理论文 >

兰银线输气管道项目后评价研究

发布时间:2018-03-11 05:20

  本文选题:项目后评价 切入点:输气管线 出处:《中国石油大学(华东)》2013年硕士论文 论文类型:学位论文


【摘要】:建设项目后评价是在项目建成投产、竣工验收以后,经过一段时间的运营,对项目目的、执行过程、效益、作用和影响所进行全面系统地分析,总结经验教训,并通过及时有效的信息反馈,为完善已建项目、调整在建项目、指导拟建项目服务。 本文在对后评价的理论及方法进行了简单的介绍后,在独立性、科学性、实用性、透明性和反馈性的基本原则下,通过对兰州至银川输气管道建设项目进行资料的调研收集和整理,在分析大量资料及数据的基础上,通过前后对比法对项目进行评价,进行了科学的定量分析和定性分析相结合的后评价。本文重点通过对决策、项目设计、建设管理等方面的评估来综合进行实施过程的后评价;并从经济指标实现程度、投资和执行情况、经济效益分析、影响与持续性结论项目的实施效果来得出项目实施效果的后评价。 最后,本文从前期工作方面、经济效益及影响、可持续性方面进行了综合评价,分析并总结了兰州至银川输气管道项目的项目经验。对于今后同类工程的建设和提高项目决策、工程实施和运营管理水平,为合理利用资金,,提高投资效益,制定相关政策等有着重要的指导意义。并在此基础上总结了项目的教训及问题,给出了相关建议。
[Abstract]:The post evaluation of the construction project is a comprehensive and systematic analysis of the purpose, implementation process, benefit, function and impact of the project after the project has been completed and put into operation, and after the completion and acceptance of the project, the experience and lessons are summarized. And through timely and effective information feedback, to perfect the existing projects, adjust the projects under construction, guide the proposed project services. After a brief introduction of the theory and method of post evaluation, this paper is based on the basic principles of independence, science, practicability, transparency and feedback. Through the investigation and collection and arrangement of the data of Lanzhou to Yinchuan gas pipeline construction project, on the basis of analyzing a large amount of data and data, the project is evaluated by the method of comparison before and after. This paper focuses on the post-evaluation of the implementation process through the evaluation of decision-making, project design, construction management and so on, and the degree of realization of economic indicators. Investment and implementation, economic benefit analysis, impact and sustainability conclusion the project implementation effect to obtain the post-evaluation of project implementation effect. Finally, this paper has carried on the comprehensive evaluation from the preliminary work aspect, the economic benefit and the influence, the sustainability aspect, This paper analyzes and summarizes the project experience of Lanzhou to Yinchuan gas pipeline project. For the construction and improvement of project decision, project implementation and operation management level of similar projects in the future, in order to make rational use of funds and improve investment benefit, the paper analyzes and summarizes the project experience of Lanzhou to Yinchuan gas pipeline project. It is of great significance to make relevant policies. On this basis, the lessons and problems of the project are summarized, and the relevant suggestions are given.
【学位授予单位】:中国石油大学(华东)
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:TE973;F426.22

【参考文献】

相关期刊论文 前2条

1 于树青;刘春阳;董颖;南敬茹;仪晓珉;;管道建设项目后评价综合评价法与指标体系研究[J];石油工程建设;2007年03期

2 王纯光;油田建设项目的后评价[J];统计与决策;2002年12期



本文编号:1596765

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1596765.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户e1d30***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com