中国石油山东淄博第69加油站项目后评价研究

发布时间:2018-03-13 04:10

  本文选题:中国石油 切入点:加油站 出处:《中国石油大学(华东)》2013年硕士论文 论文类型:学位论文


【摘要】:项目后评价工作在整个项目周期中占据着重要的位置,,国内各行业对项目后评价工作越来越重视,不断加强项目后评价理论方法的研究和应用。2004年底,中国石油天然气集团公司为提高加油站项目的项目管理水平和投资收益,提出了开展项目后评价工作的要求。但是在当前的石油企业中,很多企业开展的项目后评价工作都是简化后评价,没有对项目进行深入分析评价。本文旨在以中国石油山东淄博第69加油站为例,首先构建一套完整的第69加油站项目后评价指标体系,然后对第69加油站开展详细后评价,发现问题,为后期开发的加油站提供借鉴。 在对项目后评价工作相关理论进行深入研究的基础上,结合加油站项目的实际情况,本文构建了第69加油站项目后评价指标体系。在该套项目后评价指标体系中,设定了前期工作、建设实施、生产运行、投资与财务效益、影响与持续性五个一级评价指标,每一个一级评价指标下又设立了多项二级评价指标,通过利用层次分析法确定了各指标的权重。以构建的第69加油站项目后评价指标体系为依据,本文对第69加油站进行了详细后评价,并利用成功度模糊综合评价法对第69加油站进行了综合后评价。通过对后评价结果的分析,总结第69加油站开发、建设、运营过程中存在的诸多问题,提炼出有代表性的问题,为后期开发的加油站提供借鉴,从而提高加油站项目的投资收益。
[Abstract]:Post-project evaluation occupies an important position in the whole project cycle. The domestic industries pay more and more attention to the post-project evaluation, and strengthen the research and application of the theory and method of post-project evaluation at the end of 2004. In order to improve the project management level and investment income of the gas station project, CNPC has put forward the request to carry out the post-project evaluation work. However, in the current oil enterprises, Many enterprises carry out post-project evaluation work is simplified post-evaluation, there is no in-depth analysis and evaluation of the project. The purpose of this paper is to take PetroChina Shandong Zibo No. 69 Gas Station as an example. Firstly, a complete post-evaluation index system of the 69th gas station project is constructed, and then the detailed post-evaluation of the 69th gas station is carried out to find out the problems, which can be used as a reference for the later development of the gas station. On the basis of deep research on the relevant theories of post-project evaluation, combined with the actual situation of the gas station project, this paper constructs the post-evaluation index system of the 69th gas station project. Five primary evaluation indicators, namely, pre-work, construction implementation, production operation, investment and financial benefits, impact and sustainability, have been set up, and several second-level evaluation indicators have been set up under each first-level evaluation index. The weight of each index is determined by using analytic hierarchy process. Based on the post-evaluation index system of the 69th gas station project, the detailed post-evaluation of the 69th gas station is carried out in this paper. Through the analysis of the results of the post-evaluation, many problems in the development, construction and operation of the No. 69 gas station are summarized, and the representative problems are extracted. To provide reference for the later development of the gas station, so as to improve the investment income of the gas station project.
【学位授予单位】:中国石油大学(华东)
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.22

【参考文献】

相关期刊论文 前10条

1 陈建设;王晓东;韩武波;;国外项目后评价研究进展及其对我国土地整理项目后评价的启示[J];国土资源科技管理;2008年02期

2 张礼安;李华启;李刚;洪保民;;建设项目后评价方法和程序[J];国际石油经济;2005年11期

3 黄旭楠;李华启;王锡柱;;油气勘探项目后评价指标体系与定量化评价[J];国际石油经济;2010年01期

4 方兴君;赵连增;杜敏;高军;丁世强;;对改进投资项目后评价方法体系的探讨[J];国际石油经济;2010年04期

5 高军;高颖;;对成品油销售网络投资项目后评价指标体系构建的探讨[J];国际石油经济;2010年07期

6 牛东晓;李建青;;基于物元可拓模型的火电厂建设项目过程后评价研究[J];华北电力大学学报(自然科学版);2010年06期

7 丁海潮;陈惠玲;管殿聆;张伟;;城市基础设施建设项目施工阶段后评价及案例分析[J];建筑经济;2009年04期

8 王广浩,周坚;项目后评价方法探析[J];科技进步与对策;2004年01期

9 杜静;;对汶川震后恢复重建项目后评价工作的探讨[J];科技进步与对策;2009年21期

10 王尊先;;基于成功度综合评价模型的水电工程施工后评价[J];南水北调与水利科技;2008年05期

相关博士学位论文 前1条

1 杨文升;油气田产能建设项目后评价研究[D];哈尔滨工程大学;2009年



本文编号:1604737

资料下载
论文发表

本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1604737.html


Copyright(c)文论论文网All Rights Reserved | 网站地图 |

版权申明:资料由用户9bdfa***提供,本站仅收录摘要或目录,作者需要删除请E-mail邮箱bigeng88@qq.com