海勃湾发电厂三期工程后评价研究
本文选题:海勃湾发电厂三期工程 + 后评价 ; 参考:《华北电力大学》2013年硕士论文
【摘要】:针对海勃湾发电厂三期工程,本文首先分析了项目后评价理论和后评价方法,然后重点阐述了海勃湾发电厂三期工程建成后的一些基本指标和数据,最后很据项目后评价理论和发电厂的基本特点,构建了该项目后评价指标体系,并利用序关系分析法对后评价指标赋权,利用模糊综合评价法对该项目进行了后评价。本文的研究工作主要体现在以下几个方面:介绍了后评价的基本理论,和海勃湾发电厂三期工程项目的基本情况以及建设的必要性以及建设的内容;分别从项目实施的准备过程、项目的技术水平、项目的财务收益、项目的环境效益、项目的社会效益、项目的可持续能力全面分析了项目运营前后的基本情况;为选择一种合适的后评价方法,分别介绍了模糊综合评价法、D-S证据评价法、模糊积分评价法和一些其它评价法,并对这些评价方法进行了比较分析,最终选择模糊综合评价法对本项目进行后评价。根据后评价指标体系的选取原则及海勃湾发电厂三期工程建设的基本情况,构建了本项目的后评价指标体系,该指标体系主要包括项目的实施准备工作、项目的技术水平、项目的财务效益、项目的影响和可持续发展能力该指标体系等五个方面。在该项目评价过程中利用序关系分析法确定指标的权重,并给出了详细计算步骤;利用模糊综合评价理论对本项目进行模糊综合评判,,并给出了后评价结论。最后给出论文的研究结论和进一步改进建议。
[Abstract]:In view of the three phase of the Haibowan power plant, this paper first analyzes the post evaluation theory and the post evaluation method, and then focuses on some basic indexes and data after the completion of the three phase of the project. Finally, according to the post evaluation theory and the basic characteristics of the power plant, the post evaluation index system of the project is constructed and used for the project. In this paper, the basic theory of post evaluation, the basic situation of the three phase of the Haibowan power plant, the necessity of the construction and the content of the construction, are mainly embodied in the following aspects. Not from the preparation process, the technical level of the project, the financial benefit of the project, the environmental benefits of the project, the social benefit of the project, the sustainable ability of the project, the basic situation of the project before and after the project is analyzed, and the fuzzy comprehensive evaluation method, the D-S evidence evaluation method, and the fuzzy evaluation method are introduced to select a suitable post evaluation method. The integral evaluation method and some other evaluation methods have been compared and analyzed. Finally, the fuzzy comprehensive evaluation method is selected for the post evaluation of the project. According to the selection principle of the index system of the post evaluation and the basic situation of the construction of the three phase of the Haibowan power plant, the post evaluation index system of the project is constructed, and the index body is constructed. The Department mainly includes the preparation of the project, the technical level of the project, the financial benefit of the project, the impact of the project and the index system of the sustainable development ability. In the evaluation process of the project, the weight of the index is determined by the order relation analysis method, and the detailed calculation steps are given, and the fuzzy comprehensive evaluation theory is used in the five aspects. The fuzzy comprehensive evaluation of the project is carried out, and the conclusion of the post evaluation is given. Finally, the research conclusions and suggestions for further improvement are given.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 李晟;蒋维;胡国良;;基于ANP的模糊多层次分析法的风电项目后评价研究[J];安徽电力;2009年04期
2 韩富春;任婷婷;陈晶晶;;基于层次分析法的输变电工程项目后评价研究[J];电气技术;2009年02期
3 常鲜戎,邢金峰,张洁;基于多级模糊综合评价法的电网调度员培训评估[J];电网技术;2005年17期
4 韦钢;杨毅;王建;周冰;;基于综合评价方法的输变电工程技术后评价[J];电网技术;2010年03期
5 张殿科,贺明军;500kV输变电工程项目综合后评价研究[J];山西电力;2005年05期
6 杨永红;李献东;;风电项目后评价理论方法探讨[J];华北电力大学学报(社会科学版);2008年03期
7 蒋黎明;何加浪;张宏;;D-S证据理论中一种新的冲突证据融合方法[J];计算机科学;2011年04期
8 李振宇;江伟;;输变电项目后评价指标体系构建[J];科技信息;2009年15期
9 吕显智;马建云;陶昆;马峰;陈硕;;基于模糊综合评价法的高层宾馆消防安全现状评价[J];中国安全生产科学技术;2011年05期
10 何沙;吉安民;陈东升;;模糊综合评价在钻井队安全管理评价中的应用[J];中国安全生产科学技术;2011年06期
相关硕士学位论文 前10条
1 袁翰青;深州220KV输变电项目后评价研究[D];华北电力大学;2011年
2 巴音虎;龙源风电工程项目后评价研究[D];华北电力大学;2011年
3 刘烨;石家庄市北输变电工程项目后评价研究[D];华北电力大学;2011年
4 冯茂森;电力建设项目后评价研究[D];天津大学;2010年
5 贺明军;运城500千伏输变电工程项目后评价研究[D];华北电力大学(北京);2005年
6 程宏伟;输变电工程项目后评价方法探索[D];郑州大学;2005年
7 辛益;高压输变电工程环境影响后评价研究[D];华北电力大学(北京);2007年
8 齐金定;涞源220KV输变电项目后评价研究[D];华北电力大学(河北);2008年
9 张建明;输变电工程项目经济效益后评价研究[D];华北电力大学(北京);2008年
10 刘岚;风电工程项目后评价指标体系与评价方法研究[D];华北电力大学(北京);2008年
本文编号:1868891
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/1868891.html