基于逐层模糊法的东阳变电站工程风险综合评价研究
[Abstract]:As a social and public basic industry, electricity supply is closely related to the social and economic development and people's life. The project construction of the substation project not only has significant economic benefits, but also has great social benefits. However, there are many factors involved in the substation project (planning, design, investment, time, technology, construction, supervision, environmental protection and so on. " The whole process of construction construction of substation is restricted by many complex factors, whether its economic benefit or its social benefit is full of uncertainty, and all these are influenced and restricted by the objective conditions such as social, political, economic, natural environment and so on. It has great randomness. There is a great risk in the construction of substation project. Based on this, it is of great theoretical significance and necessary practical significance to study and evaluate the risk and risk of substation engineering. On the one hand, through the analysis of the risk of substation engineering, it is helpful for us to deepen the risk of the substation engineering. Understanding, fully understanding the impact of risk on Substation Engineering, and making a good foundation for the solution or dispersion of risk; on the other hand, the scientific evaluation of the risk of substation engineering through actual data helps us to quantify the risk and help us to understand the degree of the risk of the substation engineering from the quantity angle to the future. Long term preventive measures and avoiding risk loss are based on scientific evidence.
The construction of the substation project is full of uncertainty from the construction of the plan to the completion and delivery of the project, and there are various risks in the different construction stages of the project construction. In addition, the construction objectives of different substation projects are different. The cost and cost are minimized, and so on. Therefore, how to evaluate the risk of the substation engineering from the whole point of view and grasp the overall risk level of the substation engineering will become a complicated problem in front of our reality.
Based on this, this paper, based on the practice of the work unit, takes the Dongyang substation project as the sample, analyzes the risk factors of the substation engineering, uses the multi-layer fuzzy comprehensive evaluation method to establish the risk evaluation index system, and makes a scientific evaluation on the overall level of the substation engineering risk, and puts forward the corresponding risk coping measures aiming at the evaluation results. In order to provide theoretical guidance for the risk management and control of substation engineering, and provide reference for the overall grasp and response of similar substation engineering risks.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 安在国;;AHP_模糊综合评价法在桥梁工程风险评价中的应用探析[J];城市道桥与防洪;2010年02期
2 胡劲松,达庆利,金毅;模糊网络关键路线分析[J];管理工程学报;1999年01期
3 常云涛,李嘉;模糊网络的工期与关键线路分析[J];湖南大学学报(自然科学版);1999年06期
4 石晓军,李健,李晖;项目投资风险评估、分析的几种主要方法的比较研究[J];技术经济与管理研究;1998年06期
5 王家远;邹小伟;张国敏;;建设项目生命周期的风险识别[J];科技进步与对策;2010年19期
6 胡海波,刘志杰;模糊型网络计划完工概率的计算和仿真[J];昆明理工大学学报(理工版);2005年03期
7 张辉;高德利;;基于模糊数学和灰色理论的多层次综合评价方法及其应用[J];数学的实践与认识;2008年03期
8 郭宇,刘尔烈;应用蒙特卡罗方法改进项目成本风险分析[J];天津大学学报;2002年02期
9 石晓军,任志安;项目投资风险分析方法研究:一种基于影响图的解析方法[J];系统工程理论与实践;2000年03期
10 许登超,沙基昌,张朋柱,万百五;基于Delphi法的转产项目建设风险[J];系统工程理论与实践;2000年12期
相关博士学位论文 前1条
1 余宏亮;基于工程图纸的地铁车站施工安全风险自动识别研究[D];华中科技大学;2011年
相关硕士学位论文 前5条
1 孙丽丽;基于灰色理论的三贵口110KV输变电工程风险评价研究[D];华北电力大学;2011年
2 刘迎春;建筑企业进行工程项目风险管理的研究[D];对外经济贸易大学;2002年
3 吕立寨;500kV罗百二回输变电工程线路工程风险评价[D];华北电力大学(河北);2009年
4 李春鹏;高密市110kV姚哥庄农网改造工程风险评价研究[D];华北电力大学;2012年
5 徐辉;500kV仁和输变电工程项目风险分析与管理研究[D];浙江工业大学;2012年
本文编号:2158480
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2158480.html