电力企业测量管理体系优化项目的研究
发布时间:2018-10-11 17:33
【摘要】:测量检测是科学和生产管理的重要技术基础,是工业企业进行质量管理的基础和前提,是企业节能降耗的基本保证,也是安全生产和环境监测的必要保证。但高品质的产品不是检验出来的,而是全体员工在质量管理体系下制造出来的,这就对如何做好企业测量管理体系优化项目提出了更高的要求。论文以本人多年从事电力企业计量管理和质量检测控制的工作经验为基础,同时结合项目管理的思想,对电力企业测量管理体系优化项目进行研究。 论文通过分析IS010012标准对测量体系设备、不确定度、程序文件和记录、计量确认以及人员和环境要求,同时结合电力企业的实际情况,从电力企业体系文件完善、设备配备、确认间隔、计量手段四个方面的现状及存在的问题进行分析阐述,应用工作分解理论对电力企业测量管理体系优化项目进行分解,并对优化项目中的人员管理进行了解析。同时,将全过程管理与目标管理(质量管理、进度管理、费用管理)应用于电力企业测量管理体系优化项目的实施过程中。最后,对优化项目的成果进行了评价。 本文旨在运用项目管理的思想,对电力企业测量管理体系优化项目进行全过程的管控,从而提高企业的测量管理水平,为企业建立一个操作性强、精确度高的测量管理体系。同时,为企业进行优化项目提供了一种有效地管理方法。
[Abstract]:Measurement and detection is an important technical basis of science and production management, the basis and premise of quality management in industrial enterprises, the basic guarantee of energy saving and consumption reduction in enterprises, and the necessary guarantee of safety in production and environmental monitoring. But the high quality product is not tested out, but made by all the staff under the quality management system, which puts forward higher requirements on how to do well the optimization project of enterprise measurement management system. Based on my working experience in measurement management and quality control of electric power enterprises for many years, and combining with the idea of project management, the optimization project of measurement management system in electric power enterprises is studied in this paper. Through the analysis of the IS010012 standard for measuring system equipment, uncertainty, program documents and records, measurement confirmation, personnel and environmental requirements, combined with the actual situation of the power enterprise, from the power enterprise system file improvement, equipment. The present situation and existing problems in four aspects of confirming interval and measuring means are analyzed and expounded. The optimization project of measurement management system of electric power enterprise is decomposed by the work decomposition theory, and the personnel management in the optimized project is analyzed. At the same time, the whole process management and objective management (quality management, schedule management, cost management) are applied to the implementation of the optimization project of measurement management system in electric power enterprises. Finally, the results of the optimization project are evaluated. The purpose of this paper is to use the idea of project management to control the whole process of the optimization project of measurement management system of electric power enterprises, so as to improve the level of measurement management of enterprises, and to establish a measurement management system with strong operability and high accuracy for enterprises. At the same time, it provides an effective management method for the enterprise to optimize the project.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
[Abstract]:Measurement and detection is an important technical basis of science and production management, the basis and premise of quality management in industrial enterprises, the basic guarantee of energy saving and consumption reduction in enterprises, and the necessary guarantee of safety in production and environmental monitoring. But the high quality product is not tested out, but made by all the staff under the quality management system, which puts forward higher requirements on how to do well the optimization project of enterprise measurement management system. Based on my working experience in measurement management and quality control of electric power enterprises for many years, and combining with the idea of project management, the optimization project of measurement management system in electric power enterprises is studied in this paper. Through the analysis of the IS010012 standard for measuring system equipment, uncertainty, program documents and records, measurement confirmation, personnel and environmental requirements, combined with the actual situation of the power enterprise, from the power enterprise system file improvement, equipment. The present situation and existing problems in four aspects of confirming interval and measuring means are analyzed and expounded. The optimization project of measurement management system of electric power enterprise is decomposed by the work decomposition theory, and the personnel management in the optimized project is analyzed. At the same time, the whole process management and objective management (quality management, schedule management, cost management) are applied to the implementation of the optimization project of measurement management system in electric power enterprises. Finally, the results of the optimization project are evaluated. The purpose of this paper is to use the idea of project management to control the whole process of the optimization project of measurement management system of electric power enterprises, so as to improve the level of measurement management of enterprises, and to establish a measurement management system with strong operability and high accuracy for enterprises. At the same time, it provides an effective management method for the enterprise to optimize the project.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 董效林;;创新化解企业计量检验风险的管理机制[J];工业计量;2010年01期
2 魏彦廷,徐全志,徐卫国,赵怀俊;航空检测设备检定周期的两种界定方法[J];计量技术;2004年12期
3 张昊;侯君;;国防基础科研项目管理评价方法研究[J];淮阴工学院学报;2009年06期
4 陈颖姣;何贤;王忠;林玲;;借鉴现代项目管理理论 提升科研项目管理水平[J];科技管理研究;2010年24期
5 房卫东;张为;汤羿;;科研院所分支机构的科研项目管理模式研究[J];科学管理研究;2010年03期
6 王欣然,李利敏;浅谈计量标准考核的量值溯源与量值传递[J];内蒙古电力技术;2003年01期
7 吴泽球;;电学计量检定和测量的系统误差因素分析[J];武夷学院学报;2009年05期
8 张冰;;浅谈如何加强对测量设备量值溯源的管理[J];黑龙江科技信息;2010年18期
9 周云武;;关于企业量值溯源工作的探讨[J];计量与测试技术;2011年10期
10 魏红,
本文编号:2264645
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2264645.html