柳林—霍县500kV线路工程建设过程后评价研究
[Abstract]:Power transmission and transformation project is one of the key points of infrastructure construction in China, which plays an important role in the sustained economic and social development of our country. The post-evaluation of transmission and transformation engineering construction process can evaluate the actual state of the project during construction, provide guidance and accumulated experience for engineering construction and transformation, and promote the objective fairness of feasibility study and pre-evaluation of the project. It will help to improve the scientific management level of project investment in the future. Based on the research on the post-evaluation of construction projects at home and abroad and the present situation of post-evaluation of construction process, combined with the characteristics of transmission and transformation projects, this paper discusses in detail the relevant problems of post-process evaluation. The concept and content of post-evaluation of transmission and transformation engineering construction process are clearly defined. Based on the existing theory and method of post-evaluation, this paper analyzes the construction process of 500kV line project in Liulin-Huo County, and summarizes the actual results of the whole process of the project from pre-construction preparation to construction. Firstly, entropy weight method and TOPSIS method are used to analyze the early decision and construction preparation of the construction process. By comparing with the other three similar projects in the same period of time, the one-sidedness and limitation of longitudinal comparison are avoided. Secondly, using AHP and matter-element extension model, the construction process of construction is studied. Finally, the logical frame method is applied, the implementation level of each index is qualitatively analyzed, the comprehensive situation of the project is evaluated scientifically and effectively, and the corresponding countermeasures and suggestions are put forward according to the evaluation results. The establishment of post-evaluation system and the application of comprehensive evaluation method in the construction process of 500kV line engineering in Liulin-Huo county provide a certain scientific method for the establishment of post-evaluation system in the construction process of transmission and transformation projects. It provides a meaningful exploration for the construction process evaluation of similar projects.
【学位授予单位】:华北电力大学
【学位级别】:硕士
【学位授予年份】:2013
【分类号】:F426.61
【参考文献】
相关期刊论文 前10条
1 宋志华;;电网建设项目财务评价方法探讨[J];电力技术经济;2003年04期
2 柳勇;;浅析电力建设项目后评价[J];电力技术经济;2005年04期
3 赵彪;刘姜玲;李敬如;;建立成果发布机制,发挥输变电项目后评价的作用[J];电力技术经济;2009年01期
4 郑风雷;;输电网扩展的社会经济性评估方法[J];电力系统及其自动化学报;2008年05期
5 王婧;寇凌岳;刘娟;杨柳;;电网投资项目全过程后评价体系研究[J];华北电力技术;2012年03期
6 徐志勇;张徐东;曾鸣;鄢帆;;基于ANP的多层次模糊综合评价法的电网建设项目后评价研究[J];华东电力;2009年03期
7 匡平,郭壮志;浅谈电力建设项目的后评价[J];湖南电力;2004年03期
8 夏良玉;于昕;;工业项目经济评价模型及评价系统研究与应用[J];技术经济;2007年09期
9 陈晓霞;刘纳兵;;经济评价在电网建设项目决策中的应用[J];江苏建材;2007年03期
10 王广浩,周坚;项目后评价方法探析[J];科技进步与对策;2004年01期
相关博士学位论文 前2条
1 张飞涟;铁路建设项目后评价理论与方法的研究[D];中南大学;2004年
2 奚宽武;高速公路后评价理论与方法研究[D];北京工业大学;2004年
相关硕士学位论文 前10条
1 李建青;保定电厂热电机组扩建项目实施过程后评价研究[D];华北电力大学(北京);2011年
2 王慧;电网项目后评价系统研究[D];天津理工大学;2011年
3 赵春霞;大理500kV电力工程项目后评价与多指标分析方法[D];广西大学;2011年
4 于波;我国电网建设业主项目管理研究[D];大连理工大学;2002年
5 孟建英;工程建设投资项目后评价理论方法与应用研究[D];天津大学;2004年
6 李荣星;建设项目评价理论与方法体系研究[D];大连理工大学;2006年
7 苗宇;基于过程评价的电网建设管理模式研究[D];华北电力大学(北京);2007年
8 徐晖;电网改造工程后评价及其模板研究[D];上海交通大学;2007年
9 陶德凯;重大城市规划与建设项目的社会影响评价初步研究[D];华中科技大学;2006年
10 吕有意;工程项目施工过程管理研究[D];西安建筑科技大学;2008年
,本文编号:2290635
本文链接:https://www.wllwen.com/guanlilunwen/shengchanguanlilunwen/2290635.html