在常规课堂教学中实施项目式学习——以化学教学为例
发布时间:2018-08-17 18:11
【摘要】:在不同类型学校、不同年级的中学化学课堂中实施项目式学习,主要分为确立项目和规划项目两个步骤,确立项目要基于课程标准、教学内容和学生经验。规划项目包括三个阶段:拆解项目,确立项目的基本问题、单元问题及内容问题;规划课时及其安排;系统审视、优化设计。在常规课堂教学中实施项目式学习的关键问题和解决对策如下。(1)让学生亲历问题解决过程;(2)注重过程技能的培训和指导;(3)时间紧张,课上课下任务要统筹安排;(4)进行系统性、针对性评价的设计与实施;(5)突发事件的应对与处理;(6)教师需要养成实施项目式学习的教学观念和教学行为。
[Abstract]:The implementation of project-based learning in middle school chemistry classroom of different types of schools and different grades is mainly divided into two steps: establishing a project and planning a project. The establishment of a project should be based on curriculum standards, teaching content and students' experience. The planning project consists of three stages: dismantling the project, establishing the basic problem of the project, unit problem and content problem; planning the class time and its arrangement; examining systematically, optimizing the design. The key problems and solutions to implement project-based learning in routine classroom teaching are as follows: (1) enabling students to experience the problem-solving process; (2) paying attention to the training and guidance of process skills; (3) time constraints and overall arrangement of tasks after class; (4) systematization, The design and implementation of targeted evaluation; (5) emergency response and treatment; (6) teachers need to develop the implementation of project-based learning teaching concept and teaching behavior.
【作者单位】: 北京师范大学化学学院;
【分类号】:G633.8
本文编号:2188473
[Abstract]:The implementation of project-based learning in middle school chemistry classroom of different types of schools and different grades is mainly divided into two steps: establishing a project and planning a project. The establishment of a project should be based on curriculum standards, teaching content and students' experience. The planning project consists of three stages: dismantling the project, establishing the basic problem of the project, unit problem and content problem; planning the class time and its arrangement; examining systematically, optimizing the design. The key problems and solutions to implement project-based learning in routine classroom teaching are as follows: (1) enabling students to experience the problem-solving process; (2) paying attention to the training and guidance of process skills; (3) time constraints and overall arrangement of tasks after class; (4) systematization, The design and implementation of targeted evaluation; (5) emergency response and treatment; (6) teachers need to develop the implementation of project-based learning teaching concept and teaching behavior.
【作者单位】: 北京师范大学化学学院;
【分类号】:G633.8
【相似文献】
相关期刊论文 前1条
1 魏伟;;利用项目式教材,培养学生计算机课程的自主学习能力[J];新课程学习(上);2012年10期
相关硕士学位论文 前1条
1 张凌云;项目式翻转课堂教学模式下学生参与度研究[D];华中师范大学;2015年
,本文编号:2188473
本文链接:https://www.wllwen.com/jiaoyulunwen/chuzhongjiaoyu/2188473.html