基于遗传算法的资源约束项目调度问题优化及应用研究
[Abstract]:Resource constrained project scheduling problem (RCPSP) is a kind of important scheduling problem. It mainly studies how to arrange the start time and completion time of project activities reasonably under the condition of satisfying project activity timing constraints and resource constraints. To optimize the achievement of a management goal. Such as: the shortest time limit, minimum cost, resource balance, etc. This problem belongs to the NP-hard problem theoretically and has abundant models. Many combinatorial optimization problems are special cases of RCPSP. In addition, RCPSP also widely exists in the construction industry, software industry, manufacturing industry and other industries. Therefore, the study of RCPSP has important theoretical and practical significance. The main contents of this paper are as follows: (1). Aiming at classical RCPSP, this paper combines genetic algorithm with new teaching algorithm, and designs a new intelligent optimization algorithm for solving classical resource constrained project scheduling problem, which is called instructional genetic algorithm (TGA). According to the two-stage search method in the process of teaching algorithm, this algorithm designs a kind of second crossover operation, the first crossover is between the individual of teacher and the individual of student. The second crossover is carried out with a certain cross probability between students and students. The design of the crossover operation enables the instructional genetic algorithm to jump out of the local optimum effectively and obtain a better scheduling scheme. In the experimental part, the classical resource constrained project scheduling problem set in standard database PSPLIB is selected to verify the validity of the algorithm. The results show that it is better than one of the existing algorithms in the existing literature. (2) In actual project scheduling, there is often more than one execution mode for each project activity. Each model represents a combination of resource requirements and corresponding durations, and different durations will have different resource requirements. Therefore, as an extension of classical RCPSP, multi-execution mode resource-constrained project scheduling problem has more practical significance. This paper presents a hybrid genetic algorithm for MRCPSP. In order to improve the local search ability of genetic algorithm, a mutation operation based on neighborhood search is designed to improve the local search ability of genetic algorithm. In the experimental part, the benchmark problem J18 / J20 in the standard database is tested, and the validity of the algorithm is verified. (3). Both the theory and the algorithm should serve the practice and provide practical solutions for the project management problems in modern projects. In order to verify whether the hybrid genetic algorithm proposed in this paper can be applied to practical applications, a case study on the MRCPSP problem is carried out. The results show that the intelligent algorithm not only enriches the solution method of multi-execution mode RCPSP, but also improves the performance of the algorithm. Moreover, it widens the application field of genetic algorithm.
【学位授予单位】:湖南工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:F282;TP18
【相似文献】
相关期刊论文 前10条
1 宋红星;曹文彬;;基于双种群蚁群算法的多目标资源受限项目调度问题研究[J];信息系统工程;2010年04期
2 程序;吴澄;;一种复杂项目调度问题的混合智能算法[J];计算机集成制造系统;2006年04期
3 徐进;费少梅;张树有;施岳定;;自适应粒子群求解资源动态分配项目调度问题[J];计算机集成制造系统;2011年08期
4 雒兴刚;汪定伟;唐加福;;任务可拆分项目调度问题[J];东北大学学报;2006年09期
5 宗砚;刘琼;张超勇;朱海平;;考虑资源传递时间的多项目调度问题[J];计算机集成制造系统;2011年09期
6 孙晓雅;林焰;;任务可定点拆分的资源受限项目调度问题研究[J];微电子学与计算机;2012年07期
7 张维存;康凯;;蚁群-粒子群算法求解多模式资源受限项目调度问题[J];计算机工程与应用;2007年34期
8 刘敏;代成琴;王宇航;;资源受限的项目调度问题的求解算法[J];自动化技术与应用;2008年06期
9 卢睿;李林瑛;;一种求解反应式项目调度问题的启发式方法[J];系统仿真学报;2011年02期
10 孙晓雅;林焰;;人工蜂群算法求解任务可拆分项目调度问题[J];微电子学与计算机;2011年11期
相关会议论文 前3条
1 丁雪枫;尤建新;;多模式资源受限项目调度问题的混合优化算法研究[A];第十四届中国管理科学学术年会论文集(上册)[C];2012年
2 刘艳秋;张颖;汪定伟;王福利;;基于GA的RCPSP可靠性优化方法研究[A];2001年中国智能自动化会议论文集(下册)[C];2001年
3 周楷;何正文;;周期性支付的多模式Max-npv项目调度问题研究[A];中国企业运筹学学术交流大会论文集[C];2008年
相关博士学位论文 前8条
1 王宏;求解资源受限项目调度问题算法的研究[D];天津大学;2005年
2 邓林义;资源受限的项目调度问题及其应用研究[D];大连理工大学;2008年
3 陈卫明;动态环境下产品开发项目调度问题及其求解研究[D];华中科技大学;2011年
4 吴兵;柔性资源受限的多模式项目调度问题研究[D];武汉理工大学;2008年
5 彭武良;面向产品开发的项目调度问题及项目管理系统研究[D];东北大学;2008年
6 李诗娴;基于净现值的资源受限型项目调度问题研究[D];天津大学;2012年
7 贾艳;资源受限项目调度问题的仿真优化方法及其应用研究[D];华中科技大学;2012年
8 应瑛;不确定资源约束下项目调度问题研究[D];浙江大学;2010年
相关硕士学位论文 前10条
1 李远见;几种改进的智能算法及其应用[D];安徽师范大学;2015年
2 段向阳;基于遗传算法的资源约束项目调度问题优化及应用研究[D];湖南工业大学;2015年
3 张冠群;基于蚁群算法的多模式资源受限项目调度问题研究[D];湖南大学;2009年
4 傅奥;多目标资源受限项目调度问题蚁群算法研究[D];浙江大学;2008年
5 蒲娟;多目标模糊资源受限项目调度问题研究[D];郑州大学;2012年
6 薄银利;基于模块化外包的项目调度问题研究[D];兰州大学;2011年
7 刘志霞;资源受限项目调度问题及其任务扰动的干扰管理研究[D];沈阳工业大学;2011年
8 陈俊波;考虑施工设备租赁的项目调度问题研究[D];华中科技大学;2009年
9 刘雅婷;人力资源受限项目调度问题研究[D];华中科技大学;2007年
10 王伟;任务工期不确定的资源受限项目调度优化[D];浙江大学;2010年
,本文编号:2274050
本文链接:https://www.wllwen.com/jingjilunwen/hongguanjingjilunwen/2274050.html