建筑防水节点构造标准化在地下防水工程中的应用
[Abstract]:There are many kinds of waterproof joint structures in basement, and these waterproof joints are subjected to multi-force field. After installation of flexible waterproof layer in basement waterproofing project, the physical and chemical properties of waterproof membrane are seriously lost, which leads to the deterioration of durability of waterproof layer and becomes a hidden danger of leakage. Based on the waterproof joint structure of basement such as pile cap waterproof engineering, this paper probes into the performance loss of the coiled material in the former construction of coiled material laying, and looks for ways to reduce the performance loss, which is not much discussed in the previous research. One of the effective ways to solve this problem is to standardize the structure of waterproofing joints, that is, to cut the oil-impregnated polyester tyres in a large area of flat or vertical waterproof layers in the field. By heating the modified asphalt compound and the oil-impregnated polyester tyre directly laying the concrete cushion, the waterproof joint structure standard component is installed directly, so that the underground waterproof layer can be closed as a whole and the durability of the waterproof layer can be improved. In this paper, the reasons of basement leakage are analyzed, the main reasons are that the waterproof material is inferior, the design roughness depth is not enough, the construction disorder is chaotic and the engineering cost is artificially reduced. Some of these factors can be avoided, such as strengthening design, capital investment and professional construction team construction, and some factors are inevitable. Such as the loss of material performance after installation due to the uneven heating of hot melt and the cutting of finished coils for many times, the necessity of standardization of waterproof joint structure in underground waterproofing engineering is put forward. There are four kinds of joints in basement waterproofing project, such as post-pouring belt expansion joint, wall penetration, concrete yin-yang angle and pile head of pile cap. This paper puts forward the conditions of making and installing standard parts of each kind of joint structure. The installation process diagram is also given. Through a series of tests such as high and low temperature test, tensile test and bonding strength test, the mechanical properties of the waterproofing membrane prepared in the field were measured. The experimental results show that the properties of the waterproofing coiled materials prepared in the field meet the requirements of relevant specifications and material standards, and are superior to the finished waterproofing coils in the aspects of high and low temperature performance and binding force with concrete cushion. In this paper, the bearing characteristics of the waterproof system of pile cap are theoretically analyzed, and the stress and deformation of the waterproof membrane prepared in the field are simulated by using ANSYS software. With the increase of vertical load, the maximum deformation of waterproof layer of pile cap increases gradually. However, the increase of the thickness of the waterproofing membrane has little effect on the maximum deformation and can be ignored. From the theoretical analysis and numerical simulation, it is proved that the field preparation of waterproofing membrane can meet the bearing requirements of waterproof engineering in basement system.
【学位授予单位】:湖北工业大学
【学位级别】:硕士
【学位授予年份】:2015
【分类号】:TU94;TU761.11
【相似文献】
相关期刊论文 前10条
1 谢辉;地下防水工程设计、施工、使用中应注意的问题[J];氯碱工业;2001年06期
2 张喜彦,柴志信,高英杰;涂贴相结合在地下防水工程中的应用[J];山西建筑;2002年04期
3 侯友然;地下防水工程技术经济分析[J];建设科技;2002年08期
4 付梅;对大连市地下防水工程中有关问题的几点看法[J];中国建筑防水;2003年10期
5 吴新群 ,贾东凯 ,徐文红;赛柏斯在地下防水工程中的应用[J];建筑工人;2004年05期
6 李勇;温宝峰;李鹏程;吴春芳;;地下防水工程堵漏措施[J];黑龙江科技信息;2004年08期
7 王建设;;地下防水工程渗透及防治方法[J];石河子科技;2006年06期
8 王丽娟;王宝仁;;试述地下防水工程的设计与施工[J];中小企业管理与科技(上旬刊);2008年11期
9 吴从国;曹琼;;浅谈地下防水工程补漏措施[J];山西建筑;2009年23期
10 冯玉书;;地下防水工程综合施工技术[J];科技信息;2010年04期
相关会议论文 前10条
1 秦刚民;;水泥基渗透结晶型防水材料在地下防水工程中的应用[A];地下空间工程防水与渗漏治理技术研讨会论文集[C];2012年
2 唐东生;唐东平;陈宏喜;文举;;关于地下防水工程若干技术问题的研讨[A];地下空间工程防水与渗漏治理技术研讨会论文集[C];2012年
3 梁奇;杨中原;;地下防水工程材料的应用[A];土木建筑学术文库(第12卷)[C];2009年
4 黄启宇;王宜群;;建筑地下防水工程几个问题的探讨及其建议[A];全国防水技术经验交流会暨第四届防水技术专业委员会学术年会论文集[C];1997年
5 邹连华;;地下防水工程渗漏水原因初步分析及几点看法[A];全国防水技术经验交流会暨第四届防水技术专业委员会学术年会论文集[C];1997年
6 刘继武;董丛新;;膨润土防水毯在地下防水工程中的应用[A];中国防水工程技术论坛论文集[C];2006年
7 程伊太;;进一步提高地下防水工程质量[A];全国防水技术经验交流会暨第四届防水技术专业委员会学术年会论文集[C];1997年
8 张婵;;关于地下防水工程若干技术问题的研讨[A];地下空间工程防水与渗漏治理技术研讨会论文集[C];2012年
9 孙成珩;;北京宗帽综合楼地下防水工程的施工[A];全国防水技术经验交流会暨第四届防水技术专业委员会学术年会论文集[C];1997年
10 陈胜;;剪力墙结构中的地下防水工程细部作法[A];第二届“科协文化——中关村论坛”论文集[C];2013年
相关重要报纸文章 前1条
1 ;奥运村地下防水工程简介[N];中国建设报;2006年
相关硕士学位论文 前1条
1 胡威旺;建筑防水节点构造标准化在地下防水工程中的应用[D];湖北工业大学;2015年
,本文编号:2141621