主制造商—供应商模式下复杂产品研发风险传递研究
[Abstract]:With the rapid development of information technology and the acceleration of global economic integration, enterprise competition is becoming increasingly fierce. Competition among enterprises can also be attributed to competition among new products. Product innovation has become the core task of enterprise innovation, and the complexity of product system has become the trend of the general trend, because the R & D of complex products has the characteristics of high investment, complex technology, long cycle and high risk. Risk management, including risk identification, risk measurement, risk transmission and risk control, is necessary to ensure the success of product development. In the process of complex product research and development, the main manufacturer-supplier model is gradually accepted by various enterprises, this paper also focuses on the complex product R & D risk transfer. Based on the classical GERT network model, this paper studies the single R & D risk transfer model and the integrated R D risk model and its related contents, and applies its algorithm to a practical case. The main contents of this paper are as follows: (1) the main manufacturer-supplier model is defined and a three-stage model of material and parts supplier-subsystem supplier-main manufacturer is established. The characteristics of R & D risk of complex products are defined, the risk of R D is identified, the R D risk of complex product is determined, and the risk of schedule and cost is further studied. (2) the research on risk transfer of complex product research includes two aspects: firstly, the transmission process of single R & D risk factor is studied by combining the GERT network model with single parameter. The transmission mechanism and measurement method are studied from two aspects of schedule risk and cost risk. Then, combined with the multi-parameter R-GERT network model, the transfer process of comprehensive R & D risk is studied, and the integrated R & D risk is regarded as a function of schedule risk. The solution method of multi-parameter R-GERT network model is determined by relevant definition and theorem proof. Finally, combined with the risk contribution rate of each subsystem supplier to the main manufacturer, the final comprehensive R & D risk of the main manufacturer is obtained. (3) to verify the risk factors of single R & D and the model of comprehensive R & D risk with an example, and put forward the corresponding countermeasures of risk control, mainly taking the R & D process of a certain type of aircraft as the object of study. By integrating the existing data of this model, the corresponding R-GERT model is constructed, and the transmission mechanism of comprehensive R & D risk is obtained, and the countermeasures of controlling the risk of the main manufacturer are given.
【学位授予单位】:南京航空航天大学
【学位级别】:硕士
【学位授予年份】:2014
【分类号】:F273.2;F224
【参考文献】
相关期刊论文 前10条
1 陈明;林桂娟;;复杂产品研发技术风险管理研究与应用[J];同济大学学报(自然科学版);2009年08期
2 徐华锋;方志耕;;以时间为自变量的多参数GERT网络模型的解析求解[J];统计与决策;2011年02期
3 程国平;邱映贵;;供应链风险传导模式研究[J];武汉理工大学学报(社会科学版);2009年02期
4 李晓松;蔡文军;陈庆华;;武器装备研制风险的GERT网络模型研究[J];系统仿真技术;2010年02期
5 徐哲;吴瑾瑾;姚李刚;;基于GERT仿真的武器装备技术风险量化评估模型[J];系统仿真学报;2008年07期
6 方志耕,龚正,黄西林;公路军事交通运输勤务综合演习项目GERT网络模型研究与分析[J];系统工程理论与实践;2000年04期
7 顾基发,赵丽艳;航天系统安全性分析的概率风险评估方法[J];系统工程与电子技术;1999年08期
8 李存斌;王恪铖;;网络计划项目风险元传递解析模型研究[J];中国管理科学;2007年03期
9 刘思峰;万寿庆;陆志鹏;方志耕;朱建军;;复杂交通网络中救援点与事故点间的路段重要性评价模型研究[J];中国管理科学;2009年01期
10 方志耕;杨保华;陆志鹏;刘思峰;陈晔;陈伟;姚国章;;基于Bayes推理的灾害演化GERT网络模型研究[J];中国管理科学;2009年02期
相关博士学位论文 前1条
1 张卓;基于复杂性度量的产品质量经济性评价研究[D];南京航空航天大学;2008年
本文编号:2328053
本文链接:https://www.wllwen.com/jingjilunwen/jingjiguanlilunwen/2328053.html